Establishment unit data
In general | |||
Enterprise number: | 0401.664.033 | ||
Status of the entity: | Active | ||
Number of the establishment unit: | 2.003.093.748 | ||
Status of the establishment unit: | Active | ||
Start date: | March 1, 1949 | ||
Name of the establishment unit: | No information found in the CBE. | ||
Address of the establishment unit: |
Rue Champeau 6
6061 Charleroi Since March 1, 1949 | ||
Phone number: | No information found in the CBE. | ||
Fax: | No information found in the CBE. | ||
Email address: | No information found in the CBE. | ||
Web address: | No information found in the CBE. | ||
| |||
Authorisations | |||
No data included in CBE. | |||
| |||
Version of Nacebel codes for activities 2008(1) | |||
Main activity: 25.501 - Metal forging Since April 18, 2023 | |||
Main activity: 33.110 - Repair of fabricated metal products Since April 18, 2023 | |||
Main activity: 33.130 - Repair of electronic and optical equipment Since April 18, 2023 | |||
Main activity: 33.140 - Repair of electrical equipment Since April 18, 2023 | |||
Main activity: 33.200 - Installation of industrial machinery and equipment Since April 18, 2023 | |||
Main activity: 41.101 - Residential property development Since April 18, 2023 | |||
Main activity: 41.102 - Non-residential property development Since April 18, 2023 | |||
Main activity: 41.201 - General construction of residential buildings Since April 18, 2023 | |||
Main activity: 41.20101 - Realisation of the main structure of individual houses Since January 1, 2008 | |||
Main activity: 41.20102 - Construction of individual "turnkey" houses Since January 1, 2008 | |||
Main activity: 41.20111 - Realisation of the main structure of multi-cellular buildings (apartments, etc.) Since January 1, 2008 | |||
Main activity: 41.20112 - Realisation of "turnkey" apartments Since January 1, 2008 | |||
Main activity: 41.20121 - Realisation of the structural work of buildings Since April 18, 2023 | |||
Main activity: 41.20122 - General coordination on the construction site Since January 1, 2008 | |||
Main activity: 41.202 - General construction of office buildings Since April 18, 2023 | |||
Main activity: 41.203 - General construction of other non-residential buildings Since January 1, 2008 | |||
Main activity: 41.20302 - Assembly of hangars, barns, silos, etc., for agricultural use Since January 1, 2008 | |||
Main activity: 42.130 - Construction of bridges and tunnels Since April 17, 2023 | |||
Main activity: 42.219 - Construction of networks for fluids n.e.c. Since April 18, 2023 | |||
Main activity: 42.21911 - Construction of water supply, distribution and drainage networks Since April 18, 2023 | |||
Main activity: 42.220 - Construction of electricity and telecommunications networks Since April 18, 2023 | |||
Main activity: 42.22001 - Construction of electrical energy transmission and distribution lines Since April 18, 2023 | |||
Main activity: 42.990 - Construction of other civil engineering projects n.e.c. Since April 18, 2023 | |||
Main activity: 43.110 - Demolition works Since April 18, 2023 | |||
Main activity: 43.120 - Site preparation works Since April 17, 2023 | |||
Main activity: 43.211 - Electrotechnical installation work for buildings Since April 17, 2023 | |||
Main activity: 43.212 - Electrotechnical installation work other than buildings Since April 17, 2023 | |||
Main activity: 43.221 - Plumbing works Since January 1, 2008 | |||
Main activity: 43.22101 - Installation in buildings or other structures of: plumbing and sanitary facilities, pipes, gas and water connections (except for heating), installation of automatic fire extinguishing systems, etc. Since April 18, 2023 | |||
Main activity: 43.222 - Installation of heating, ventilation and air conditioning Since April 18, 2023 | |||
Main activity: 43.22201 - Installation in buildings or other construction projects of: heating systems, electricity, gas and oil-fired boilers, ventilation and air conditioning material and ducting, etc. Since April 18, 2023 | |||
Main activity: 43.22202 - Installation of heating, cooling and ventilation systems (except heating) Since April 18, 2023 | |||
Main activity: 43.299 - Other installation works n.e.c. Since April 18, 2023 | |||
Main activity: 43.29901 - Installation of blinds and awnings Since January 1, 2008 | |||
Main activity: 43.29902 - Installation of signs, illuminated or not Since April 18, 2023 | |||
Main activity: 43.29911 - Installation of lifts and escalators Since April 18, 2023 | |||
Main activity: 43.310 - Plastering works Since January 1, 2008 | |||
Main activity: 43.320 - Joinery works Since January 1, 2008 | |||
Main activity: 43.32001 - Assembly of exterior and interior joinery: doors, windows, staircases, fitted kitchen cupboards shop fittings, door and window frames, etc. Since April 18, 2023 | |||
Main activity: 43.32002 - Assembly of wooden or plastic mobile walls; lining walls, ceilings etc. Since April 18, 2023 | |||
Main activity: 43.32003 - Assembly of wooden or plastic garage doors, shutters, blinds, fences, gates etc. Since April 18, 2023 | |||
Main activity: 43.32004 - Assembly of wooden or plastic armoured doors and firewall doors Since April 18, 2023 | |||
Main activity: 43.32005 - Assembly of wooden or plastic greenhouses, verandas etc. Since April 18, 2023 | |||
Main activity: 43.32011 - Assembly of external and internal metal joinery: doors, windows, door and window frames, staircases, fitted kitchen cupboards, shop fittings, etc. Since April 18, 2023 | |||
Main activity: 43.32012 - Assembly of metal mobile walls; lining walls, ceilings, etc. Since April 18, 2023 | |||
Main activity: 43.32013 - Assembly of metal garage doors, shutters, blinds, fences, gates, etc. Since April 18, 2023 | |||
Main activity: 43.32014 - Assembly of metal armoured doors and fire doors Since April 18, 2023 | |||
Main activity: 43.32015 - Assembly of metal greenhouses, verandas, etc. Since April 18, 2023 | |||
Main activity: 43.32016 - Assembly of exterior and interior plastic joinery Since April 18, 2023 | |||
Main activity: 43.32021 - Installation of glass interior doors, partition walls, etc. Since April 18, 2023 | |||
Main activity: 43.331 - Tiling of floors and walls Since January 1, 2008 | |||
Main activity: 43.332 - Fitting of wood coverings for floors and walls Since February 18, 2020 | |||
Main activity: 43.33201 - Fitting in buildings or other construction projects of: parquet and other wood floors, wooden wall coverings Since February 18, 2020 | |||
Main activity: 43.333 - Wallpapering and wall and floor coverings in other materials Since April 18, 2023 | |||
Main activity: 43.341 - Painting of buildings Since February 18, 2020 | |||
Main activity: 43.34101 - Interior and exterior painting of buildings Since February 18, 2020 | |||
Main activity: 43.343 - Glaziery Since April 18, 2023 | |||
Main activity: 43.910 - Roofing works Since April 18, 2023 | |||
Main activity: 43.91001 - Framework assembly Since January 1, 2008 | |||
Main activity: 43.91002 - Covering work using all materials Since January 1, 2008 | |||
Main activity: 43.91003 - Installation of draining elements for rainwater Since January 1, 2008 | |||
Main activity: 43.991 - Waterproofing of walls Since April 18, 2023 | |||
Main activity: 43.99101 - Waterproofing of roofs and roof terraces Since January 1, 2008 | |||
Main activity: 43.99111 - Treatment of walls with water repellent products Since April 18, 2023 | |||
Main activity: 43.993 - Construction of decorative fireplaces and open fireplaces Since April 18, 2023 | |||
Main activity: 43.994 - Masonry and repointing Since April 18, 2023 | |||
Main activity: 43.99401 - Masonry Since January 1, 2008 | |||
Main activity: 43.995 - Building restoration works Since April 18, 2023 | |||
Main activity: 43.996 - Screed laying Since April 18, 2023 | |||
Main activity: 43.99601 - Screed laying Since January 1, 2008 | |||
Main activity: 43.999 - Other specialised construction activities Since April 18, 2023 | |||
Main activity: 43.99931 - Installation of private swimming pools Since April 18, 2023 | |||
| |||
Version of the Nacebel codes for the NSSO-activities 2008(1) | |||
Main activity: 41.203 - General construction of other non-residential buildings Since January 1, 2008 | |||
Show the activities for NACEBEL codification version 2003. |
|
(1)The EC-classification of the Nacebel codes has changed on 1/1/2008. Both the Nacebel codification of 2003 and 2008 are available in Public Search. The 2003 codes were valid until 31/12/2007. On 1/1/2008, the new codification became valid. This was a mere administrative conversion : no activities of the entity or establishment unit have thus been changed.