Establishment unit data
In general | |||
Enterprise number: | 0661.633.040 | ||
Status of the entity: | Active | ||
Number of the establishment unit: | 2.257.759.429 | ||
Status of the establishment unit: | Active | ||
Start date: | August 23, 2016 | ||
Name of the establishment unit: |
Hogerhuis Interior Name in Dutch, since July 5, 2022 | ||
Address of the establishment unit: |
Nijverheidsweg 18-20
9820 Merelbeke Since October 4, 2019 | ||
Phone number: | No information found in the CBE. | ||
Fax: | No information found in the CBE. | ||
Email address: | No information found in the CBE. | ||
Web address: | No information found in the CBE. | ||
| |||
Authorisations | |||
No data included in CBE. | |||
| |||
Version of Nacebel codes for activities 2008(1) | |||
Main activity: 16.230 - Manufacture of other builders' carpentry and joinery Since August 23, 2016 | |||
Main activity: 41.201 - General construction of residential buildings Since August 23, 2016 | |||
Main activity: 41.20101 - Realisation of the main structure of individual houses Since August 23, 2016 | |||
Main activity: 41.20102 - Construction of individual "turnkey" houses Since August 23, 2016 | |||
Main activity: 41.20111 - Realisation of the main structure of multi-cellular buildings (apartments, etc.) Since August 23, 2016 | |||
Main activity: 41.20112 - Realisation of "turnkey" apartments Since August 23, 2016 | |||
Main activity: 41.202 - General construction of office buildings Since August 23, 2016 | |||
Main activity: 41.203 - General construction of other non-residential buildings Since August 23, 2016 | |||
Main activity: 42.130 - Construction of bridges and tunnels Since August 23, 2016 | |||
Main activity: 42.212 - Construction of drainage systems for waste water Since August 23, 2016 | |||
Main activity: 42.91905 - Construction of settling ponds and other structures for waste water treatment Since August 23, 2016 | |||
Main activity: 43.12001 - Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc. Since August 23, 2016 | |||
Main activity: 43.12003 - Lowering of the water table and drainage of construction sites Since August 23, 2016 | |||
Main activity: 43.12011 - Clearing of building sites Since August 23, 2016 | |||
Main activity: 43.291 - Insulation works Since August 23, 2016 | |||
Main activity: 43.29904 - General installation work Since August 23, 2016 | |||
Main activity: 43.32003 - Assembly of wooden or plastic garage doors, shutters, blinds, fences, gates etc. Since August 23, 2016 | |||
Main activity: 43.32005 - Assembly of wooden or plastic greenhouses, verandas etc. Since August 23, 2016 | |||
Main activity: 43.32013 - Assembly of metal garage doors, shutters, blinds, fences, gates, etc. Since August 23, 2016 | |||
Main activity: 43.331 - Tiling of floors and walls Since August 23, 2016 | |||
Main activity: 43.33101 - Fitting in buildings or other construction projects of: wall coverings or ceramic, concrete or stone tiles; granite flooring and wall coverings, etc. Since August 23, 2016 | |||
Main activity: 43.333 - Wallpapering and wall and floor coverings in other materials Since August 23, 2016 | |||
Main activity: 43.39002 - Other building completion and finishing work n.e.s. Since August 23, 2016 | |||
Main activity: 43.992 - Restoration of façades Since August 23, 2016 | |||
Main activity: 43.99201 - Steam cleaning, sand blasting and similar activities for building exteriors Since August 23, 2016 | |||
Main activity: 43.993 - Construction of decorative fireplaces and open fireplaces Since August 23, 2016 | |||
Main activity: 43.99401 - Masonry Since August 23, 2016 | |||
Main activity: 43.99402 - Execution of repointing Since August 23, 2016 | |||
Main activity: 43.999 - Other specialised construction activities Since August 23, 2016 | |||
Main activity: 43.99901 - Establishment of foundations, including pile driving Since August 23, 2016 | |||
Main activity: 43.99904 - Installation of steel structure elements not manufactured by the unit carrying out the work Since August 23, 2016 | |||
Main activity: 43.99906 - Assembly and disassembly of scaffolding and work platforms Since August 23, 2016 | |||
Main activity: 46.731 - Wholesale trade of construction materials, general assortment Since August 23, 2016 | |||
Main activity: 47.521 - Retail trade of specialised stores of building materials, general assortment in specialised stores Since August 23, 2016 | |||
Main activity: 47.522 - Retail trade of building materials and wooden garden materials in specialised stores Since August 23, 2016 | |||
Main activity: 71.11101 - Architectural consultancy activities to the principal Since August 23, 2016 | |||
Main activity: 71.11103 - Supervision of construction work (structural work, installation, finishing work, etc.) Since August 23, 2016 | |||
| |||
Version of the Nacebel codes for the NSSO-activities 2008(1) | |||
Main activity: 43.320 - Joinery works Since July 3, 2017 | |||
| |||
Version of the Nacebel codes for the NSSO-activities 2025(1) | |||
Main activity: 43.320
- Joinery installation Since January 1, 2025 |
|
(1)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). There are different versions of these codes. Activities with a NACE-BEL code (version 2003) were stopped on 31/12/2007 and automatically converted to the new NACE-BEL codes (2008 version) starting on 01/01/2008. A new 2025 version of the codes will enter into force on 01/01/2025. During the first half of the year 2025, all activities with a 2008 version of the NACE-BEL code will be phased out with 31/12/2024 as end date and automatically converted to the 2025 version of the NACE-BEL codes, starting on 01/01/2025. Up until then, activities will continue to be registered using the 2008 NACE-BEL codes.