Establishment unit data
In general | |||
Enterprise number: | 0680.813.009 | ||
Status of the entity: | Active | ||
Number of the establishment unit: | 2.267.366.486 | ||
Status of the establishment unit: | Active | ||
Start date: | July 1, 2017 | ||
Name of the establishment unit: | No information found in the CBE. | ||
Address of the establishment unit: |
Molenwalstraat(STA) 19
8840 Staden Since July 1, 2017 | ||
Phone number: | No information found in the CBE. | ||
Fax: | No information found in the CBE. | ||
Email address: | No information found in the CBE. | ||
Web address: | No information found in the CBE. | ||
| |||
Authorisations | |||
No data included in CBE. | |||
| |||
Version of Nacebel codes for activities 2008(1) | |||
Main activity: 25.110 - Manufacture of metal structures and parts of structures Since January 7, 2020 | |||
Main activity: 25.11001 - Manufacture of metal frameworks or skeletons for construction Since January 7, 2020 | |||
Main activity: 25.11003 - Manufacture of prefabricated buildings mainly of metal: site huts, modular exhibition elements, telephone booths, etc .. Since January 7, 2020 | |||
Main activity: 25.120 - Manufacture of doors and windows of metal Since January 7, 2020 | |||
Main activity: 25.12001 - Manufacture of metal joinery: doors and windows, shutters, movable partitions, gates, garage doors, etc. Since January 7, 2020 | |||
Main activity: 25.50101 - Production of metal forgings for third parties Since January 7, 2020 | |||
Main activity: 25.50102 - Production and assembly of forged parts for construction: stair railings, balustrades, etc. Since January 7, 2020 | |||
Main activity: 25.502 - Forging, pressing, stamping and profiling of metal; powder metallurgy Since January 7, 2020 | |||
Main activity: 25.62001 - Drilling, turning, milling, shaving, planing, lapping, broaching, dressage, sawing, grinding, sharpening, etc. of metal parts Since January 7, 2020 | |||
Main activity: 33.12011 - Mechanical maintenance and repairs for third parties Since January 7, 2020 | |||
Main activity: 41.20101 - Realisation of the main structure of individual houses Since July 1, 2017 | |||
Main activity: 41.20111 - Realisation of the main structure of multi-cellular buildings (apartments, etc.) Since July 1, 2017 | |||
Main activity: 43.11001 - Demolition of buildings and other constructions Since July 1, 2017 | |||
Main activity: 43.120 - Site preparation works Since July 1, 2017 | |||
Main activity: 43.12001 - Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc. Since July 1, 2017 | |||
Main activity: 43.12003 - Lowering of the water table and drainage of construction sites Since July 1, 2017 | |||
Main activity: 43.12004 - Drainage of agricultural or forestry land Since July 1, 2017 | |||
Main activity: 43.12011 - Clearing of building sites Since July 1, 2017 | |||
Main activity: 43.29903 - Other installation works n.e.s., including installation of accessories Since January 7, 2020 | |||
Main activity: 43.29911 - Installation of lifts and escalators Since January 7, 2020 | |||
Main activity: 43.320 - Joinery works Since January 7, 2020 | |||
Main activity: 43.32001 - Assembly of exterior and interior joinery: doors, windows, staircases, fitted kitchen cupboards shop fittings, door and window frames, etc. Since January 7, 2020 | |||
Main activity: 43.32002 - Assembly of wooden or plastic mobile walls; lining walls, ceilings etc. Since January 7, 2020 | |||
Main activity: 43.32003 - Assembly of wooden or plastic garage doors, shutters, blinds, fences, gates etc. Since January 7, 2020 | |||
Main activity: 43.32011 - Assembly of external and internal metal joinery: doors, windows, door and window frames, staircases, fitted kitchen cupboards, shop fittings, etc. Since January 7, 2020 | |||
Main activity: 43.32012 - Assembly of metal mobile walls; lining walls, ceilings, etc. Since January 7, 2020 | |||
Main activity: 43.32013 - Assembly of metal garage doors, shutters, blinds, fences, gates, etc. Since January 7, 2020 | |||
Main activity: 43.32014 - Assembly of metal armoured doors and fire doors Since January 7, 2020 | |||
Main activity: 43.32015 - Assembly of metal greenhouses, verandas, etc. Since January 7, 2020 | |||
Main activity: 43.331 - Tiling of floors and walls Since July 1, 2017 | |||
Main activity: 43.34201 - Painting of metal frames Since January 7, 2020 | |||
Main activity: 43.39001 - Cleaning of new buildings and rehabilitation of sites after work Since July 1, 2017 | |||
Main activity: 43.994 - Masonry and repointing Since July 1, 2017 | |||
Main activity: 43.995 - Building restoration works Since July 1, 2017 | |||
Main activity: 43.99901 - Establishment of foundations, including pile driving Since July 1, 2017 | |||
Main activity: 43.99902 - Formwork and rebar work Since July 1, 2017 | |||
Main activity: 43.99904 - Installation of steel structure elements not manufactured by the unit carrying out the work Since January 7, 2020 | |||
Main activity: 43.99905 - Execution of lifting work for third parties Since January 7, 2020 | |||
Main activity: 81.30002 - Creation and maintenance of gardens, parks and green spaces for sports facilities Since July 1, 2017 |
|
(1)The EC-classification of the Nacebel codes has changed on 1/1/2008. Both the Nacebel codification of 2003 and 2008 are available in Public Search. The 2003 codes were valid until 31/12/2007. On 1/1/2008, the new codification became valid. This was a mere administrative conversion : no activities of the entity or establishment unit have thus been changed.