Attention! This establishment unit has been stopped. Therefore, the shown data reflect the situation at the moment of cessation of the establishment unit.
Establishment unit data
In general | |||
Enterprise number: | 0716.744.084 | ||
Status of the entity: | Stopped | ||
Number of the establishment unit: | 2.284.182.130 | ||
Status of the establishment unit: | Stopped Since June 6, 2024 | ||
Start date: | January 1, 2019 | ||
Name of the establishment unit: |
FRANCOIS DACHET Name in French, since January 1, 2019 | ||
Address of the establishment unit: |
Rue Ernest Montellier, ZI, Nov. 8
5380 Fernelmont Since June 29, 2020 | ||
Phone number: | No information found in the CBE. | ||
Fax: | No information found in the CBE. | ||
Email address: | No information found in the CBE. | ||
Web address: | No information found in the CBE. | ||
| |||
Authorisations | |||
No data included in CBE. | |||
| |||
Version of Nacebel codes for activities 2008(1) | |||
Main activity: 41.20101 - Realisation of the main structure of individual houses Since January 1, 2019 | |||
Main activity: 41.20111 - Realisation of the main structure of multi-cellular buildings (apartments, etc.) Since January 1, 2019 | |||
Main activity: 41.20121 - Realisation of the structural work of buildings Since January 1, 2019 | |||
Main activity: 41.202 - General construction of office buildings Since January 1, 2019 | |||
Main activity: 41.203 - General construction of other non-residential buildings Since January 1, 2019 | |||
Main activity: 42.11001 - Construction of motorways, roads, streets, pavements and other vehicular and pedestrian roads (including the installation of crash barriers) Since January 1, 2019 | |||
Main activity: 42.11003 - Paint marking of pavements and lay-bys or car parks Since January 1, 2019 | |||
Main activity: 42.212 - Construction of drainage systems for waste water Since January 1, 2019 | |||
Main activity: 42.21911 - Construction of water supply, distribution and drainage networks Since January 1, 2019 | |||
Main activity: 42.91905 - Construction of settling ponds and other structures for waste water treatment Since January 1, 2019 | |||
Main activity: 42.99001 - Construction of playgrounds and sports fields, swimming pools, etc. Since January 1, 2019 | |||
Main activity: 43.110 - Demolition works Since January 1, 2019 | |||
Main activity: 43.11001 - Demolition of buildings and other constructions Since January 1, 2019 | |||
Main activity: 43.12001 - Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc. Since January 1, 2019 | |||
Main activity: 43.12003 - Lowering of the water table and drainage of construction sites Since January 1, 2019 | |||
Main activity: 43.12004 - Drainage of agricultural or forestry land Since January 1, 2019 | |||
Main activity: 43.12011 - Clearing of building sites Since January 1, 2019 | |||
Main activity: 43.13001 - Test surveys, test drilling and core sampling for construction as well as for geophysical or geological studies, or similar Since January 1, 2019 | |||
Main activity: 43.13002 - Execution of horizontal drilling for cable glands or ducts Since January 1, 2019 | |||
Main activity: 43.21102 - Installation of telecommunication systems and computer facilities Since January 1, 2019 | |||
Main activity: 43.291 - Insulation works Since January 1, 2019 | |||
Main activity: 43.29901 - Installation of blinds and awnings Since January 1, 2019 | |||
Main activity: 43.320 - Joinery works Since January 1, 2019 | |||
Main activity: 43.331 - Tiling of floors and walls Since January 1, 2019 | |||
Main activity: 43.332 - Fitting of wood coverings for floors and walls Since January 1, 2019 | |||
Main activity: 43.99201 - Steam cleaning, sand blasting and similar activities for building exteriors Since January 1, 2019 | |||
Main activity: 43.99301 - Construction of decorative fireplaces and open fireplaces Since January 1, 2019 | |||
Main activity: 43.994 - Masonry and repointing Since January 1, 2019 | |||
Main activity: 43.99402 - Execution of repointing Since January 1, 2019 | |||
Main activity: 43.995 - Building restoration works Since January 1, 2019 | |||
Main activity: 43.996 - Screed laying Since January 1, 2019 | |||
Main activity: 43.999 - Other specialised construction activities Since January 1, 2019 | |||
Main activity: 43.99901 - Establishment of foundations, including pile driving Since January 1, 2019 | |||
Main activity: 43.99902 - Formwork and rebar work Since January 1, 2019 | |||
Main activity: 43.99903 - Construction of chimneys and industrial ovens Since January 1, 2019 | |||
Main activity: 43.99904 - Installation of steel structure elements not manufactured by the unit carrying out the work Since January 1, 2019 | |||
Main activity: 43.99905 - Execution of lifting work for third parties Since January 1, 2019 | |||
Main activity: 43.99906 - Assembly and disassembly of scaffolding and work platforms Since January 1, 2019 | |||
Main activity: 43.99911 - Rental of construction equipment with operator Since January 1, 2019 | |||
Main activity: 43.99931 - Installation of private swimming pools Since January 1, 2019 |
|
(1)The EC-classification of the Nacebel codes has changed on 1/1/2008. Both the Nacebel codification of 2003 and 2008 are available in Public Search. The 2003 codes were valid until 31/12/2007. On 1/1/2008, the new codification became valid. This was a mere administrative conversion : no activities of the entity or establishment unit have thus been changed.