shadow
The English version of the Public Search application constitutes an unofficial English translation and is provided for information purposes only.
No legal rights can therefore be derived from this translation. For the official application, please consult the Dutch, French or German versions of the Public Search application.


Establishment unit data

In general

Enterprise number:0718.799.001
Status of the entity:Active
Number of the establishment unit:2.284.511.930
Status of the establishment unit:Active
Start date:January 17, 2019
Name of the establishment unit: DSV-construct
Name in Dutch, since January 17, 2024
Address of the establishment unit:
Boelare   2
9700   Oudenaarde
Since January 17, 2019
Phone number:No information found in the CBE.
Fax:No information found in the CBE.
Email address:No information found in the CBE.
Web address:No information found in the CBE.
 
 

Authorisations

No data included in CBE.
 
 

Version of Nacebel codes for activities 2008(1)

Main activity: 42.11001 - Construction of motorways, roads, streets, pavements and other vehicular and pedestrian roads (including the installation of crash barriers)
Since January 17, 2019
Main activity: 42.11003 - Paint marking of pavements and lay-bys or car parks
Since January 17, 2019
Main activity: 42.21911 - Construction of water supply, distribution and drainage networks
Since January 17, 2019
Main activity: 42.911 - Dredging works
Since January 17, 2019
Main activity: 42.91101 - Realisation of dredging works
Since January 17, 2019
Main activity: 42.91102 - Cleaning of rivers, ditches, etc.
Since January 17, 2019
Main activity: 43.120 - Site preparation works
Since January 17, 2019
Main activity: 43.12001 - Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc.
Since January 17, 2019
Main activity: 43.12002 - Site preparation for mining: overburden removal and other development and preparation of land and mining sites
Since January 17, 2019
Main activity: 43.12003 - Lowering of the water table and drainage of construction sites
Since January 17, 2019
Main activity: 43.12004 - Drainage of agricultural or forestry land
Since January 17, 2019
Main activity: 43.12011 - Clearing of building sites
Since January 17, 2019
Main activity: 43.130 - Test drilling and surveys
Since January 17, 2019
Main activity: 43.13001 - Test surveys, test drilling and core sampling for construction as well as for geophysical or geological studies, or similar
Since January 17, 2019
Main activity: 43.13002 - Execution of horizontal drilling for cable glands or ducts
Since January 17, 2019
Main activity: 43.910 - Roofing works
Since January 17, 2019
Main activity: 43.91001 - Framework assembly
Since January 17, 2019
Main activity: 43.91002 - Covering work using all materials
Since January 17, 2019
Main activity: 43.91003 - Installation of draining elements for rainwater
Since January 17, 2019
Main activity: 43.99601 - Screed laying
Since January 17, 2019
Main activity: 43.99901 - Establishment of foundations, including pile driving
Since January 17, 2019
Additional activity: 43.21103 - Installation of surveillance and alarm systems against intruders
Since January 17, 2019
Additional activity: 43.29101 - Implementation in buildings or other construction projects of: thermal insulation, acoustic and anti vibration insulation
Since January 17, 2019
Additional activity: 43.29102 - Insulation work for heating or cooling pipes
Since January 17, 2019
Additional activity: 43.29103 - Insulation work for cold storage or refrigerated warehouses
Since January 17, 2019
Additional activity: 43.299 - Other installation works n.e.c.
Since January 17, 2019
Additional activity: 43.29903 - Other installation works n.e.s., including installation of accessories
Since January 17, 2019
Additional activity: 43.29912 - Installation of building aerials and lightning rods
Since January 17, 2019
Additional activity: 43.32001 - Assembly of exterior and interior joinery: doors, windows, staircases, fitted kitchen cupboards shop fittings, door and window frames, etc.
Since January 17, 2019
Additional activity: 43.32002 - Assembly of wooden or plastic mobile walls; lining walls, ceilings etc.
Since January 17, 2019
Additional activity: 43.32003 - Assembly of wooden or plastic garage doors, shutters, blinds, fences, gates etc.
Since January 17, 2019
Additional activity: 43.32004 - Assembly of wooden or plastic armoured doors and firewall doors
Since January 17, 2019
Additional activity: 43.32031 - Assembly of gypsum drywalls
Since January 17, 2019
Additional activity: 43.34201 - Painting of metal frames
Since January 17, 2019
Additional activity: 43.390 - Other finishing work
Since January 17, 2019
Additional activity: 43.39001 - Cleaning of new buildings and rehabilitation of sites after work
Since January 17, 2019
Additional activity: 43.39002 - Other building completion and finishing work n.e.s.
Since January 17, 2019
Additional activity: 43.99201 - Steam cleaning, sand blasting and similar activities for building exteriors
Since January 17, 2019
Additional activity: 43.99402 - Execution of repointing
Since January 17, 2019
Additional activity: 43.996 - Screed laying
Since January 17, 2019
Additional activity: 43.99904 - Installation of steel structure elements not manufactured by the unit carrying out the work
Since January 17, 2019
Additional activity: 43.99905 - Execution of lifting work for third parties
Since January 17, 2019
Additional activity: 43.99906 - Assembly and disassembly of scaffolding and work platforms
Since January 17, 2019
Additional activity: 43.99911 - Rental of construction equipment with operator
Since January 17, 2019
 
 

(1)The EC-classification of the Nacebel codes has changed on 1/1/2008. Both the Nacebel codification of 2003 and 2008 are available in Public Search. The 2003 codes were valid until 31/12/2007. On 1/1/2008, the new codification became valid. This was a mere administrative conversion : no activities of the entity or establishment unit have thus been changed.