shadow
The English version of the Public Search application constitutes an unofficial English translation and is provided for information purposes only.
No legal rights can therefore be derived from this translation. For the official application, please consult the Dutch, French or German versions of the Public Search application.


Establishment unit data

In general

Enterprise number:0793.894.322
Status of the entity:Active
Number of the establishment unit:2.338.485.106
Status of the establishment unit:Active
Start date:November 23, 2022
Name of the establishment unit: SCONCEPT
Name in French, since November 23, 2022
Address of the establishment unit:
Rue de Marchienne(GOZ)   59
6534   Thuin
Since November 23, 2022
Phone number:No information found in the CBE.
Fax:No information found in the CBE.
Email address:No information found in the CBE.
Web address:No information found in the CBE.
 
 

Authorisations

No data included in CBE.
 
 

Version of Nacebel codes for activities 2008(1)

Main activity: 25.11001 - Manufacture of metal frameworks or skeletons for construction
Since November 23, 2022
Main activity: 25.620 - Machining
Since November 23, 2022
Main activity: 25.62001 - Drilling, turning, milling, shaving, planing, lapping, broaching, dressage, sawing, grinding, sharpening, etc. of metal parts
Since November 23, 2022
Main activity: 43.120 - Site preparation works
Since November 23, 2022
Main activity: 43.12001 - Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc.
Since November 23, 2022
Main activity: 43.12002 - Site preparation for mining: overburden removal and other development and preparation of land and mining sites
Since November 23, 2022
Main activity: 43.12003 - Lowering of the water table and drainage of construction sites
Since November 23, 2022
Main activity: 43.12004 - Drainage of agricultural or forestry land
Since November 23, 2022
Main activity: 43.12022 - Professional users of other pyrotechnic products (e.g. signalling device, signalling flares)
Since November 23, 2022
Main activity: 43.291 - Insulation works
Since November 23, 2022
Main activity: 43.29101 - Implementation in buildings or other construction projects of: thermal insulation, acoustic and anti vibration insulation
Since November 23, 2022
Main activity: 43.29102 - Insulation work for heating or cooling pipes
Since November 23, 2022
Main activity: 43.29103 - Insulation work for cold storage or refrigerated warehouses
Since November 23, 2022
Main activity: 43.29901 - Installation of blinds and awnings
Since November 23, 2022
Main activity: 43.29903 - Other installation works n.e.s., including installation of accessories
Since November 23, 2022
Main activity: 43.29904 - General installation work
Since November 23, 2022
Main activity: 43.29912 - Installation of building aerials and lightning rods
Since November 23, 2022
Main activity: 43.99401 - Masonry
Since November 23, 2022
Main activity: 81.210 - General cleaning of buildings
Since November 23, 2022
Main activity: 81.22001 - Interior cleaning of buildings of all types: offices, factories, workshops, premises of institutions and other premises for commercial or professional use, apartment buildings, etc.
Since November 23, 2022
 
 

(1)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). There are different versions of these codes. Activities with a NACE-BEL code (version 2003) were stopped on 31/12/2007 and automatically converted to the new NACE-BEL codes (2008 version) starting on 01/01/2008. A new 2025 version of the codes will enter into force on 01/01/2025. During the first half of the year 2025, all activities with a 2008 version of the NACE-BEL code will be phased out with 31/12/2024 as end date and automatically converted to the 2025 version of the NACE-BEL codes, starting on 01/01/2025. Up until then, activities will continue to be registered using the 2008 NACE-BEL codes.