Establishment unit data
In general | |||
Enterprise number: | 0802.875.928 | ||
Status of the entity: | Active | ||
Number of the establishment unit: | 2.346.123.756 | ||
Status of the establishment unit: | Active | ||
Start date: | June 19, 2023 | ||
Name of the establishment unit: |
SAVERCO Construct Name in Dutch, since June 19, 2023 | ||
Address of the establishment unit: |
Venecolaan 54C
9880 Aalter Since June 19, 2023 | ||
Phone number: | No information found in the CBE. | ||
Fax: | No information found in the CBE. | ||
Email address: | No information found in the CBE. | ||
Web address: | No information found in the CBE. | ||
| |||
Authorisations | |||
No data included in CBE. | |||
| |||
Version of Nacebel codes for activities 2008(1) | |||
Main activity: 25.110 - Manufacture of metal structures and parts of structures Since June 19, 2023 | |||
Main activity: 25.11001 - Manufacture of metal frameworks or skeletons for construction Since June 19, 2023 | |||
Main activity: 25.11002 - Manufacture of steel structures for industrial equipment (frames of blast furnaces, handling equipment, etc.) Since June 19, 2023 | |||
Main activity: 25.120 - Manufacture of doors and windows of metal Since June 19, 2023 | |||
Main activity: 25.12001 - Manufacture of metal joinery: doors and windows, shutters, movable partitions, gates, garage doors, etc. Since June 19, 2023 | |||
Main activity: 25.501 - Metal forging Since June 19, 2023 | |||
Main activity: 25.50101 - Production of metal forgings for third parties Since June 19, 2023 | |||
Main activity: 25.50102 - Production and assembly of forged parts for construction: stair railings, balustrades, etc. Since June 19, 2023 | |||
Main activity: 25.610 - Treatment and coating of metals Since June 19, 2023 | |||
Main activity: 25.61005 - Colouring, engraving, printing of metal Since June 19, 2023 | |||
Main activity: 25.61007 - Hardening and metal buffing Since June 19, 2023 | |||
Main activity: 25.62001 - Drilling, turning, milling, shaving, planing, lapping, broaching, dressage, sawing, grinding, sharpening, etc. of metal parts Since June 19, 2023 | |||
Main activity: 33.12011 - Mechanical maintenance and repairs for third parties Since June 19, 2023 | |||
Main activity: 41.101 - Residential property development Since June 19, 2023 | |||
Main activity: 41.102 - Non-residential property development Since June 19, 2023 | |||
Main activity: 41.201 - General construction of residential buildings Since June 19, 2023 | |||
Main activity: 41.20101 - Realisation of the main structure of individual houses Since June 19, 2023 | |||
Main activity: 41.20121 - Realisation of the structural work of buildings Since June 19, 2023 | |||
Main activity: 41.20122 - General coordination on the construction site Since June 19, 2023 | |||
Main activity: 41.202 - General construction of office buildings Since June 19, 2023 | |||
Main activity: 41.203 - General construction of other non-residential buildings Since June 19, 2023 | |||
Main activity: 42.99011 - Land allotment Since June 19, 2023 | |||
Main activity: 43.110 - Demolition works Since June 19, 2023 | |||
Main activity: 43.11001 - Demolition of buildings and other constructions Since June 19, 2023 | |||
Main activity: 43.12001 - Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc. Since June 19, 2023 | |||
Main activity: 43.12011 - Clearing of building sites Since June 19, 2023 | |||
Main activity: 43.211 - Electrotechnical installation work for buildings Since June 19, 2023 | |||
Main activity: 43.221 - Plumbing works Since June 19, 2023 | |||
Main activity: 43.222 - Installation of heating, ventilation and air conditioning Since June 19, 2023 | |||
Main activity: 43.291 - Insulation works Since June 19, 2023 | |||
Main activity: 43.299 - Other installation works n.e.c. Since June 19, 2023 | |||
Main activity: 43.310 - Plastering works Since June 19, 2023 | |||
Main activity: 43.320 - Joinery works Since June 19, 2023 | |||
Main activity: 43.32011 - Assembly of external and internal metal joinery: doors, windows, door and window frames, staircases, fitted kitchen cupboards, shop fittings, etc. Since June 19, 2023 | |||
Main activity: 43.32012 - Assembly of metal mobile walls; lining walls, ceilings, etc. Since June 19, 2023 | |||
Main activity: 43.32013 - Assembly of metal garage doors, shutters, blinds, fences, gates, etc. Since June 19, 2023 | |||
Main activity: 43.32014 - Assembly of metal armoured doors and fire doors Since June 19, 2023 | |||
Main activity: 43.331 - Tiling of floors and walls Since June 19, 2023 | |||
Main activity: 43.332 - Fitting of wood coverings for floors and walls Since June 19, 2023 | |||
Main activity: 43.333 - Wallpapering and wall and floor coverings in other materials Since June 19, 2023 | |||
Main activity: 43.341 - Painting of buildings Since June 19, 2023 | |||
Main activity: 43.342 - Painting of civil engineering works Since June 19, 2023 | |||
Main activity: 43.34201 - Painting of metal frames Since June 19, 2023 | |||
Main activity: 43.343 - Glaziery Since June 19, 2023 | |||
Main activity: 43.390 - Other finishing work Since June 19, 2023 | |||
Main activity: 43.39001 - Cleaning of new buildings and rehabilitation of sites after work Since June 19, 2023 | |||
Main activity: 43.39002 - Other building completion and finishing work n.e.s. Since June 19, 2023 | |||
Main activity: 43.910 - Roofing works Since June 19, 2023 | |||
Main activity: 43.991 - Waterproofing of walls Since June 19, 2023 | |||
Main activity: 43.992 - Restoration of façades Since June 19, 2023 | |||
Main activity: 43.994 - Masonry and repointing Since June 19, 2023 | |||
Main activity: 43.99401 - Masonry Since June 19, 2023 | |||
Main activity: 43.995 - Building restoration works Since June 19, 2023 | |||
Main activity: 43.996 - Screed laying Since June 19, 2023 | |||
Main activity: 43.999 - Other specialised construction activities Since June 19, 2023 | |||
Main activity: 46.12001 - Commission trade of fuels, minerals, metals and industrial chemicals Since June 19, 2023 | |||
Main activity: 46.720 - Wholesale trade of metals and metal ores Since June 19, 2023 | |||
Main activity: 68.100 - Buying and selling of own real estate Since June 19, 2023 | |||
Main activity: 68.201 - Renting and operating of own or leased real estate, excluding social housing Since June 19, 2023 | |||
Main activity: 68.203 - Rental and operating of own or leased real estate, except land Since June 19, 2023 | |||
Main activity: 68.204 - Land rental and operation Since June 19, 2023 | |||
Main activity: 85.599 - Other forms of education Since June 19, 2023 | |||
| |||
Version of the Nacebel codes for the NSSO-activities 2008(1) | |||
Main activity: 43.390 - Other finishing work Since March 4, 2024 |
|
(1)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). There are different versions of these codes. Activities with a NACE-BEL code (version 2003) were stopped on 31/12/2007 and automatically converted to the new NACE-BEL codes (2008 version) starting on 01/01/2008. A new 2025 version of the codes will enter into force on 01/01/2025. During the first half of the year 2025, all activities with a 2008 version of the NACE-BEL code will be phased out with 31/12/2024 as end date and automatically converted to the 2025 version of the NACE-BEL codes, starting on 01/01/2025. Up until then, activities will continue to be registered using the 2008 NACE-BEL codes.