Establishment unit data
In general | |||
Enterprise number: | 0805.893.420 | ||
Status of the entity: | Active | ||
Number of the establishment unit: | 2.349.740.074 | ||
Status of the establishment unit: | Active | ||
Start date: | September 15, 2023 | ||
Name of the establishment unit: |
SCHROYEN TECHNIEK Name in Dutch, since September 15, 2023 | ||
Address of the establishment unit: |
Vurtense Schansstraat 85
3582 Beringen Since September 15, 2023 | ||
Phone number: | No information found in the CBE. | ||
Fax: | No information found in the CBE. | ||
Email address: | No information found in the CBE. | ||
Web address: | No information found in the CBE. | ||
| |||
Authorisations | |||
Licences registered with the Federal Agency for the Safety of the Food Chain (FASFC) Click here | |||
| |||
Version of Nacebel codes for activities 2008(1) | |||
Main activity: 01.610 - Support activities for crop production Since September 15, 2023 | |||
Main activity: 01.61003 - Crop spraying, including by air Since September 15, 2023 | |||
Main activity: 02.100 - Sylviculture and other forestry activities Since September 15, 2023 | |||
Main activity: 25.62001 - Drilling, turning, milling, shaving, planing, lapping, broaching, dressage, sawing, grinding, sharpening, etc. of metal parts Since September 15, 2023 | |||
Main activity: 33.12011 - Mechanical maintenance and repairs for third parties Since September 15, 2023 | |||
Main activity: 33.20001 - Development, assembling and maintenance of control systems in non stop industrial process Since September 15, 2023 | |||
Main activity: 33.20002 - Development, assembling and maintenance of automatic production units, including several machines, handling equipments and appliances for centralized control Since September 15, 2023 | |||
Main activity: 42.11001 - Construction of motorways, roads, streets, pavements and other vehicular and pedestrian roads (including the installation of crash barriers) Since September 15, 2023 | |||
Main activity: 43.120 - Site preparation works Since September 15, 2023 | |||
Main activity: 43.12001 - Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc. Since September 15, 2023 | |||
Main activity: 43.12011 - Clearing of building sites Since September 15, 2023 | |||
Main activity: 43.291 - Insulation works Since September 15, 2023 | |||
Main activity: 43.32003 - Assembly of wooden or plastic garage doors, shutters, blinds, fences, gates etc. Since September 15, 2023 | |||
Main activity: 43.32005 - Assembly of wooden or plastic greenhouses, verandas etc. Since September 15, 2023 | |||
Main activity: 43.32013 - Assembly of metal garage doors, shutters, blinds, fences, gates, etc. Since September 15, 2023 | |||
Main activity: 43.992 - Restoration of façades Since September 15, 2023 | |||
Main activity: 43.99402 - Execution of repointing Since September 15, 2023 | |||
Main activity: 43.99906 - Assembly and disassembly of scaffolding and work platforms Since September 15, 2023 | |||
Main activity: 47.76101 - Retail trade of flowers (including cut flowers) and plants Since September 15, 2023 | |||
Main activity: 47.76102 - Retail trade of seeds, fertilisers, pesticides, etc. Since September 15, 2023 | |||
Main activity: 47.76103 - Retail trade of artificial flowers and ornamental items of artificial flowers Since September 15, 2023 | |||
Main activity: 47.76104 - Retail trade of a wide range of gardening products and horticultural products (garden centres) Since September 15, 2023 | |||
Main activity: 81.300 - Landscape service activities Since September 15, 2023 | |||
Main activity: 81.30001 - Pruning of trees and hedges Since September 15, 2023 | |||
Main activity: 81.30002 - Creation and maintenance of gardens, parks and green spaces for sports facilities Since September 15, 2023 |
| ||
No data included in CBE. |
(1)The EC-classification of the Nacebel codes has changed on 1/1/2008. Both the Nacebel codification of 2003 and 2008 are available in Public Search. The 2003 codes were valid until 31/12/2007. On 1/1/2008, the new codification became valid. This was a mere administrative conversion : no activities of the entity or establishment unit have thus been changed.