shadow
The English version of the Public Search application constitutes an unofficial English translation and is provided for information purposes only.
No legal rights can therefore be derived from this translation. For the official application, please consult the Dutch, French or German versions of the Public Search application.


Establishment unit data

In general

Enterprise number:0809.846.169
Status of the entity:Active
Number of the establishment unit:2.177.281.794
Status of the establishment unit:Active
Start date:February 16, 2009
Name of the establishment unit: Utopi
Name in Dutch, since February 16, 2009
Address of the establishment unit:
Hillarestraat   120
9160   Lokeren
Since January 1, 2017
Phone number:No information found in the CBE.
Fax:No information found in the CBE.
Email address:No information found in the CBE.
Web address:No information found in the CBE.
 
 

Authorisations

No data included in CBE.
 
 

Version of Nacebel codes for activities 2008(1)

Main activity: 42.11001 - Construction of motorways, roads, streets, pavements and other vehicular and pedestrian roads (including the installation of crash barriers)
Since November 1, 2010
Main activity: 42.211 - Construction of water and gas distribution networks
Since April 1, 2022
Main activity: 42.219 - Construction of networks for fluids n.e.c.
Since April 1, 2022
Main activity: 42.21901 - Drilling and water well construction, shaft sinking
Since November 1, 2010
Main activity: 42.21911 - Construction of water supply, distribution and drainage networks
Since April 1, 2022
Main activity: 42.21912 - Construction of networks to transport gas, petroleum products, etc.
Since April 1, 2022
Main activity: 43.12001 - Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc.
Since November 1, 2010
Main activity: 43.130 - Test drilling and surveys
Since November 1, 2010
Main activity: 43.211 - Electrotechnical installation work for buildings
Since April 1, 2022
Main activity: 43.21101 - Installation of electrical wiring and fittings
Since April 1, 2022
Main activity: 43.21102 - Installation of telecommunication systems and computer facilities
Since April 1, 2022
Main activity: 43.29101 - Implementation in buildings or other construction projects of: thermal insulation, acoustic and anti vibration insulation
Since November 1, 2010
Main activity: 43.29102 - Insulation work for heating or cooling pipes
Since November 1, 2010
Main activity: 43.29103 - Insulation work for cold storage or refrigerated warehouses
Since November 1, 2010
Main activity: 43.29901 - Installation of blinds and awnings
Since November 1, 2010
Main activity: 43.29912 - Installation of building aerials and lightning rods
Since November 1, 2010
Main activity: 43.39001 - Cleaning of new buildings and rehabilitation of sites after work
Since November 1, 2010
Main activity: 43.99201 - Steam cleaning, sand blasting and similar activities for building exteriors
Since November 1, 2010
Main activity: 43.99402 - Execution of repointing
Since November 1, 2010
Main activity: 43.99905 - Execution of lifting work for third parties
Since November 1, 2010
Main activity: 43.99906 - Assembly and disassembly of scaffolding and work platforms
Since November 1, 2010
Main activity: 69.20102 - Consultancy and representation (other than legal representation), on behalf of clients, before the tax administration
Since November 1, 2010
Main activity: 70.210 - Public relations and communication activities
Since November 1, 2010
Main activity: 70.21002 - Arbitration and conciliation between the management of companies and its employees
Since November 1, 2010
Additional activity: 18.13013 - Other graphic activities
Since February 16, 2009
 
 

(1)The EC-classification of the Nacebel codes has changed on 1/1/2008. Both the Nacebel codification of 2003 and 2008 are available in Public Search. The 2003 codes were valid until 31/12/2007. On 1/1/2008, the new codification became valid. This was a mere administrative conversion : no activities of the entity or establishment unit have thus been changed.