Establishment unit data
In general | |||
Enterprise number: | 0659.777.568 | ||
Status of the entity: | Active | ||
Number of the establishment unit: | 2.254.922.970 | ||
Status of the establishment unit: | Active | ||
Start date: | July 19, 2016 | ||
Name of the establishment unit: |
TECHNICONSTRUCT BELGIQUE Name in French, since July 19, 2016 | ||
Address of the establishment unit: |
Rue des Vennes 144
4020 Liège Since May 1, 2017 Ex officio striked off address since December 14, 2021(1) | ||
Phone number: | No information found in the CBE. | ||
Fax: | No information found in the CBE. | ||
Email address: | No information found in the CBE. | ||
Web address: | No information found in the CBE. | ||
| |||
Authorisations | |||
No data included in CBE. | |||
| |||
Version of Nacebel codes for activities 2008(2) | |||
Main activity: 25.110 - Manufacture of metal structures and parts of structures Since July 19, 2016 | |||
Main activity: 25.30003 - Design, construction and installation of piping systems, comprising further processing of tubes generally to make pipes or pressurized networks Since July 19, 2016 | |||
Main activity: 25.620 - Machining Since July 19, 2016 | |||
Main activity: 27.120 - Manufacture of electricity distribution and control apparatus Since July 19, 2016 | |||
Main activity: 33.12011 - Mechanical maintenance and repairs for third parties Since July 19, 2016 | |||
Main activity: 33.200 - Installation of industrial machinery and equipment Since July 19, 2016 | |||
Main activity: 33.20001 - Development, assembling and maintenance of control systems in non stop industrial process Since July 19, 2016 | |||
Main activity: 33.20002 - Development, assembling and maintenance of automatic production units, including several machines, handling equipments and appliances for centralized control Since July 19, 2016 | |||
Main activity: 33.20011 - Installation of back-up power systems (generators) Since July 19, 2016 | |||
Main activity: 41.20122 - General coordination on the construction site Since July 23, 2018 | |||
Main activity: 43.120 - Site preparation works Since July 23, 2018 | |||
Main activity: 43.211 - Electrotechnical installation work for buildings Since July 19, 2016 | |||
Main activity: 43.212 - Electrotechnical installation work other than buildings Since July 19, 2016 | |||
Main activity: 43.291 - Insulation works Since July 19, 2016 | |||
Main activity: 43.29911 - Installation of lifts and escalators Since July 19, 2016 | |||
Main activity: 43.310 - Plastering works Since July 23, 2018 | |||
Main activity: 43.31001 - Application in buildings or other construction projects of plaster or stucco for interiors or exteriors, including related lathing materials Since July 19, 2016 | |||
Main activity: 43.320 - Joinery works Since July 23, 2018 | |||
Main activity: 43.32001 - Assembly of exterior and interior joinery: doors, windows, staircases, fitted kitchen cupboards shop fittings, door and window frames, etc. Since July 19, 2016 | |||
Main activity: 43.32002 - Assembly of wooden or plastic mobile walls; lining walls, ceilings etc. Since July 19, 2016 | |||
Main activity: 43.32003 - Assembly of wooden or plastic garage doors, shutters, blinds, fences, gates etc. Since July 19, 2016 | |||
Main activity: 43.32004 - Assembly of wooden or plastic armoured doors and firewall doors Since July 19, 2016 | |||
Main activity: 43.32005 - Assembly of wooden or plastic greenhouses, verandas etc. Since July 19, 2016 | |||
Main activity: 43.32011 - Assembly of external and internal metal joinery: doors, windows, door and window frames, staircases, fitted kitchen cupboards, shop fittings, etc. Since July 19, 2016 | |||
Main activity: 43.32012 - Assembly of metal mobile walls; lining walls, ceilings, etc. Since July 19, 2016 | |||
Main activity: 43.32013 - Assembly of metal garage doors, shutters, blinds, fences, gates, etc. Since July 19, 2016 | |||
Main activity: 43.32014 - Assembly of metal armoured doors and fire doors Since July 19, 2016 | |||
Main activity: 43.32015 - Assembly of metal greenhouses, verandas, etc. Since July 19, 2016 | |||
Main activity: 43.32016 - Assembly of exterior and interior plastic joinery Since July 19, 2016 | |||
Main activity: 43.32021 - Installation of glass interior doors, partition walls, etc. Since July 19, 2016 | |||
Main activity: 43.332 - Fitting of wood coverings for floors and walls Since July 23, 2018 | |||
Main activity: 43.343 - Glaziery Since July 19, 2016 | |||
Main activity: 43.39002 - Other building completion and finishing work n.e.s. Since July 19, 2016 | |||
Main activity: 43.996 - Screed laying Since July 23, 2018 |
|
(1)When an address is ex officio striked off, this indicates that the entity, the establishment unit or the branch is not longer situated at the registered address.
(2)The EC-classification of the Nacebel codes has changed on 1/1/2008. Both the Nacebel codification of 2003 and 2008 are available in Public Search. The 2003 codes were valid until 31/12/2007. On 1/1/2008, the new codification became valid. This was a mere administrative conversion : no activities of the entity or establishment unit have thus been changed.