Establishment unit data
In general | |||
Enterprise number: | 0786.328.817 | ||
Status of the entity: | Active | ||
Number of the establishment unit: | 2.331.434.392 | ||
Status of the establishment unit: | Active | ||
Start date: | May 18, 2022 | ||
Name of the establishment unit: |
BATISMART Name in French, since May 18, 2022 | ||
Address of the establishment unit: |
Avenue Duc Jean Ier 21
1300 Wavre Since May 18, 2022 | ||
Phone number: | No information found in the CBE. | ||
Fax: | No information found in the CBE. | ||
Email address: | No information found in the CBE. | ||
Web address: | No information found in the CBE. | ||
| |||
Authorisations | |||
No data included in CBE. | |||
| |||
Version of Nacebel codes for activities 2008(1) | |||
Main activity: 33.11001 - Repair and maintenance of domestic boilers Since May 18, 2022 | |||
Main activity: 33.20011 - Installation of back-up power systems (generators) Since May 18, 2022 | |||
Main activity: 41.201 - General construction of residential buildings Since May 18, 2022 | |||
Main activity: 41.20101 - Realisation of the main structure of individual houses Since May 18, 2022 | |||
Main activity: 41.20102 - Construction of individual "turnkey" houses Since May 18, 2022 | |||
Main activity: 41.20111 - Realisation of the main structure of multi-cellular buildings (apartments, etc.) Since May 18, 2022 | |||
Main activity: 41.20112 - Realisation of "turnkey" apartments Since May 18, 2022 | |||
Main activity: 41.20121 - Realisation of the structural work of buildings Since May 18, 2022 | |||
Main activity: 41.20122 - General coordination on the construction site Since May 18, 2022 | |||
Main activity: 41.202 - General construction of office buildings Since May 18, 2022 | |||
Main activity: 41.203 - General construction of other non-residential buildings Since May 18, 2022 | |||
Main activity: 41.20301 - Realisation of structural work on buildings and industrial or commercial structures, vehicle depots, warehouses, schools, clinics, buildings for the practice of worship, etc. Since May 18, 2022 | |||
Main activity: 41.20302 - Assembly of hangars, barns, silos, etc., for agricultural use Since May 18, 2022 | |||
Main activity: 42.21901 - Drilling and water well construction, shaft sinking Since May 18, 2022 | |||
Main activity: 43.110 - Demolition works Since May 18, 2022 | |||
Main activity: 43.11001 - Demolition of buildings and other constructions Since May 18, 2022 | |||
Main activity: 43.12011 - Clearing of building sites Since May 18, 2022 | |||
Main activity: 43.211 - Electrotechnical installation work for buildings Since May 18, 2022 | |||
Main activity: 43.21101 - Installation of electrical wiring and fittings Since May 18, 2022 | |||
Main activity: 43.21102 - Installation of telecommunication systems and computer facilities Since May 18, 2022 | |||
Main activity: 43.21103 - Installation of surveillance and alarm systems against intruders Since May 18, 2022 | |||
Main activity: 43.221 - Plumbing works Since May 18, 2022 | |||
Main activity: 43.22101 - Installation in buildings or other structures of: plumbing and sanitary facilities, pipes, gas and water connections (except for heating), installation of automatic fire extinguishing systems, etc. Since May 18, 2022 | |||
Main activity: 43.222 - Installation of heating, ventilation and air conditioning Since May 18, 2022 | |||
Main activity: 43.22201 - Installation in buildings or other construction projects of: heating systems, electricity, gas and oil-fired boilers, ventilation and air conditioning material and ducting, etc. Since May 18, 2022 | |||
Main activity: 43.22202 - Installation of heating, cooling and ventilation systems (except heating) Since May 18, 2022 | |||
Main activity: 43.22211 - Installation of electrical heating systems Since May 18, 2022 | |||
Main activity: 43.299 - Other installation works n.e.c. Since May 18, 2022 | |||
Main activity: 43.29903 - Other installation works n.e.s., including installation of accessories Since May 18, 2022 | |||
Main activity: 43.29904 - General installation work Since May 18, 2022 | |||
Main activity: 43.29911 - Installation of lifts and escalators Since May 18, 2022 | |||
Main activity: 43.29912 - Installation of building aerials and lightning rods Since May 18, 2022 | |||
Main activity: 43.310 - Plastering works Since May 18, 2022 | |||
Main activity: 43.31001 - Application in buildings or other construction projects of plaster or stucco for interiors or exteriors, including related lathing materials Since May 18, 2022 | |||
Main activity: 43.320 - Joinery works Since May 18, 2022 | |||
Main activity: 43.32001 - Assembly of exterior and interior joinery: doors, windows, staircases, fitted kitchen cupboards shop fittings, door and window frames, etc. Since May 18, 2022 | |||
Main activity: 43.32002 - Assembly of wooden or plastic mobile walls; lining walls, ceilings etc. Since May 18, 2022 | |||
Main activity: 43.32003 - Assembly of wooden or plastic garage doors, shutters, blinds, fences, gates etc. Since May 18, 2022 | |||
Main activity: 43.32004 - Assembly of wooden or plastic armoured doors and firewall doors Since May 18, 2022 | |||
Main activity: 43.32005 - Assembly of wooden or plastic greenhouses, verandas etc. Since May 18, 2022 | |||
Main activity: 43.32011 - Assembly of external and internal metal joinery: doors, windows, door and window frames, staircases, fitted kitchen cupboards, shop fittings, etc. Since May 18, 2022 | |||
Main activity: 43.32012 - Assembly of metal mobile walls; lining walls, ceilings, etc. Since May 18, 2022 | |||
Main activity: 43.32013 - Assembly of metal garage doors, shutters, blinds, fences, gates, etc. Since May 18, 2022 | |||
Main activity: 43.32014 - Assembly of metal armoured doors and fire doors Since May 18, 2022 | |||
Main activity: 43.32015 - Assembly of metal greenhouses, verandas, etc. Since May 18, 2022 | |||
Main activity: 43.32016 - Assembly of exterior and interior plastic joinery Since May 18, 2022 | |||
Main activity: 43.32021 - Installation of glass interior doors, partition walls, etc. Since May 18, 2022 | |||
Main activity: 43.32031 - Assembly of gypsum drywalls Since May 18, 2022 | |||
Main activity: 43.331 - Tiling of floors and walls Since May 18, 2022 | |||
Main activity: 71.11103 - Supervision of construction work (structural work, installation, finishing work, etc.) Since May 18, 2022 | |||
Main activity: 71.11104 - Operation of major maintenance of buildings Since May 18, 2022 |
|
(1)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). There are different versions of these codes. Activities with a NACE-BEL code (version 2003) were stopped on 31/12/2007 and automatically converted to the new NACE-BEL codes (2008 version) starting on 01/01/2008. A new 2025 version of the codes will enter into force on 01/01/2025. During the first half of the year 2025, all activities with a 2008 version of the NACE-BEL code will be phased out with 31/12/2024 as end date and automatically converted to the 2025 version of the NACE-BEL codes, starting on 01/01/2025. Up until then, activities will continue to be registered using the 2008 NACE-BEL codes.