shadow
The English version of the Public Search application constitutes an unofficial English translation and is provided for information purposes only.
No legal rights can therefore be derived from this translation. For the official application, please consult the Dutch, French or German versions of the Public Search application.


Establishment unit data

In general

Enterprise number:1007.947.289
Status of the entity:Active
Number of the establishment unit:2.357.989.727
Status of the establishment unit:Active
Start date:April 3, 2024
Name of the establishment unit:No information found in the CBE.
Address of the establishment unit:
Rue Fosty   5
1470   Genappe
Since April 3, 2024
Phone number:No information found in the CBE.
Fax:No information found in the CBE.
Email address:No information found in the CBE.
Web address:No information found in the CBE.
 
 

Authorisations

No data included in CBE.
 
 

Version of Nacebel codes for activities 2008(1)

Main activity: 01.62011 - Farriers activities
Since April 3, 2024
Main activity: 25.50101 - Production of metal forgings for third parties
Since April 3, 2024
Main activity: 25.50102 - Production and assembly of forged parts for construction: stair railings, balustrades, etc.
Since April 3, 2024
Main activity: 25.61003 - heat treatment of metals
Since April 3, 2024
Main activity: 25.61004 - Deburring, sand blasting, sanding barrel, metal cleaning
Since April 3, 2024
Main activity: 25.62001 - Drilling, turning, milling, shaving, planing, lapping, broaching, dressage, sawing, grinding, sharpening, etc. of metal parts
Since April 3, 2024
Main activity: 41.10212 - Development or renovation of urban areas by promotion
Since April 3, 2024
Main activity: 41.201 - General construction of residential buildings
Since April 3, 2024
Main activity: 41.20101 - Realisation of the main structure of individual houses
Since April 3, 2024
Main activity: 41.20102 - Construction of individual "turnkey" houses
Since April 3, 2024
Main activity: 41.20111 - Realisation of the main structure of multi-cellular buildings (apartments, etc.)
Since April 3, 2024
Main activity: 41.20112 - Realisation of "turnkey" apartments
Since April 3, 2024
Main activity: 41.20122 - General coordination on the construction site
Since April 3, 2024
Main activity: 41.20301 - Realisation of structural work on buildings and industrial or commercial structures, vehicle depots, warehouses, schools, clinics, buildings for the practice of worship, etc.
Since April 3, 2024
Main activity: 41.20302 - Assembly of hangars, barns, silos, etc., for agricultural use
Since April 3, 2024
Main activity: 42.22001 - Construction of electrical energy transmission and distribution lines
Since April 3, 2024
Main activity: 43.11001 - Demolition of buildings and other constructions
Since April 3, 2024
Main activity: 43.120 - Site preparation works
Since April 3, 2024
Main activity: 43.21101 - Installation of electrical wiring and fittings
Since April 3, 2024
Main activity: 43.21102 - Installation of telecommunication systems and computer facilities
Since April 3, 2024
Main activity: 43.21103 - Installation of surveillance and alarm systems against intruders
Since April 3, 2024
Main activity: 43.221 - Plumbing works
Since April 3, 2024
Main activity: 43.222 - Installation of heating, ventilation and air conditioning
Since April 3, 2024
Main activity: 43.22202 - Installation of heating, cooling and ventilation systems (except heating)
Since April 3, 2024
Main activity: 43.22211 - Installation of electrical heating systems
Since April 3, 2024
Main activity: 43.29102 - Insulation work for heating or cooling pipes
Since April 3, 2024
Main activity: 43.29901 - Installation of blinds and awnings
Since April 3, 2024
Main activity: 43.29903 - Other installation works n.e.s., including installation of accessories
Since April 3, 2024
Main activity: 43.29911 - Installation of lifts and escalators
Since April 3, 2024
Main activity: 43.31001 - Application in buildings or other construction projects of plaster or stucco for interiors or exteriors, including related lathing materials
Since April 3, 2024
Main activity: 43.320 - Joinery works
Since April 3, 2024
Main activity: 43.32001 - Assembly of exterior and interior joinery: doors, windows, staircases, fitted kitchen cupboards shop fittings, door and window frames, etc.
Since April 3, 2024
Main activity: 43.32002 - Assembly of wooden or plastic mobile walls; lining walls, ceilings etc.
Since April 3, 2024
Main activity: 43.32003 - Assembly of wooden or plastic garage doors, shutters, blinds, fences, gates etc.
Since April 3, 2024
Main activity: 43.32004 - Assembly of wooden or plastic armoured doors and firewall doors
Since April 3, 2024
Main activity: 43.32005 - Assembly of wooden or plastic greenhouses, verandas etc.
Since April 3, 2024
Main activity: 43.32015 - Assembly of metal greenhouses, verandas, etc.
Since April 3, 2024
Main activity: 43.32021 - Installation of glass interior doors, partition walls, etc.
Since April 3, 2024
Main activity: 43.32031 - Assembly of gypsum drywalls
Since April 3, 2024
Main activity: 43.331 - Tiling of floors and walls
Since April 3, 2024
Main activity: 43.332 - Fitting of wood coverings for floors and walls
Since April 3, 2024
Main activity: 43.333 - Wallpapering and wall and floor coverings in other materials
Since April 3, 2024
Main activity: 43.34101 - Interior and exterior painting of buildings
Since April 3, 2024
Main activity: 43.34201 - Painting of metal frames
Since April 3, 2024
Main activity: 43.34301 - Fitting of glass, mirrors, etc.
Since April 3, 2024
Main activity: 43.390 - Other finishing work
Since April 3, 2024
Main activity: 43.39001 - Cleaning of new buildings and rehabilitation of sites after work
Since April 3, 2024
Main activity: 43.39002 - Other building completion and finishing work n.e.s.
Since April 3, 2024
Main activity: 43.91001 - Framework assembly
Since April 3, 2024
Main activity: 43.91002 - Covering work using all materials
Since April 3, 2024
Main activity: 43.91003 - Installation of draining elements for rainwater
Since April 3, 2024
Main activity: 43.99101 - Waterproofing of roofs and roof terraces
Since April 3, 2024
Main activity: 43.99111 - Treatment of walls with water repellent products
Since April 3, 2024
Main activity: 43.994 - Masonry and repointing
Since April 3, 2024
Main activity: 43.99401 - Masonry
Since April 3, 2024
Main activity: 43.996 - Screed laying
Since April 3, 2024
Main activity: 43.99601 - Screed laying
Since April 3, 2024
Main activity: 43.99901 - Establishment of foundations, including pile driving
Since April 3, 2024
Main activity: 43.99902 - Formwork and rebar work
Since April 3, 2024
Main activity: 43.99903 - Construction of chimneys and industrial ovens
Since April 3, 2024
Main activity: 43.99904 - Installation of steel structure elements not manufactured by the unit carrying out the work
Since April 3, 2024
Main activity: 43.99905 - Execution of lifting work for third parties
Since April 3, 2024
Main activity: 43.99906 - Assembly and disassembly of scaffolding and work platforms
Since April 3, 2024
Main activity: 43.99907 - Construction of cold rooms, vaults, etc.
Since April 3, 2024
Main activity: 71.11302 - Design of gardens, parks, etc.
Since April 3, 2024
Main activity: 81.220 - Other building and industrial cleaning activities
Since April 3, 2024
Main activity: 81.22001 - Interior cleaning of buildings of all types: offices, factories, workshops, premises of institutions and other premises for commercial or professional use, apartment buildings, etc.
Since April 3, 2024
Main activity: 81.22002 - Window cleaning
Since April 3, 2024
Main activity: 81.22003 - Chimney sweeping and cleaning of hearths, furnaces, boiler incinerators, ventilation ducts and smoke evacuation devices
Since April 3, 2024
Main activity: 81.30002 - Creation and maintenance of gardens, parks and green spaces for sports facilities
Since April 3, 2024
 
 

Version of the Nacebel codes for the NSSO-activities 2008(1)

Main activity: 71.111 - Architectural activities
Since April 3, 2024
 
 

Version of the Nacebel codes for the NSSO-activities 2025(1)

Main activity: 71.111  - Activities of building architects
Since January 1, 2025
 
 

(1)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). There are different versions of these codes. Activities with a NACE-BEL code (version 2003) were stopped on 31/12/2007 and automatically converted to the new NACE-BEL codes (2008 version) starting on 01/01/2008. A new 2025 version of the codes will enter into force on 01/01/2025. During the first half of the year 2025, all activities with a 2008 version of the NACE-BEL code will be phased out with 31/12/2024 as end date and automatically converted to the 2025 version of the NACE-BEL codes, starting on 01/01/2025. Up until then, activities will continue to be registered using the 2008 NACE-BEL codes.