Establishment unit data
In general | |||
Enterprise number: | 1010.056.149 | ||
Status of the entity: | Active | ||
Number of the establishment unit: | 2.361.968.014 | ||
Status of the establishment unit: | Active | ||
Start date: | June 5, 2024 | ||
Name of the establishment unit: |
SEDELE Group Name in Dutch, since June 5, 2024 | ||
Address of the establishment unit: |
Rooshaegenweg(M) 38
3630 Maasmechelen Since June 5, 2024 | ||
Phone number: | No information found in the CBE. | ||
Fax: | No information found in the CBE. | ||
Email address: | No information found in the CBE. | ||
Web address: | No information found in the CBE. | ||
| |||
Authorisations | |||
No data included in CBE. | |||
Licences registered with the Federal Agency for the Safety of the Food Chain (FASFC) Click here | |||
| |||
Version of Nacebel codes for activities 2025(1) | |||
Main activity: 43.221
- Sanitary work Since January 1, 2025 | |||
Main activity: 43.12005
- Clearing of building sites Since January 1, 2025 | |||
Main activity: 43.222
- Installation of heating, ventilating, air conditioning, refrigeration installations powered by electricity Since January 1, 2025 | |||
Main activity: 25.11001
- Manufacture of metal frameworks or skeletons for construction Since January 1, 2025 | |||
Main activity: 43.310
- Plastering Since January 1, 2025 | |||
Main activity: 43.32006
- Assembly of external and internal metal joinery: doors, windows, door and window frames, staircases, fitted kitchen cupboards, shop fittings, etc Since January 1, 2025 | |||
Main activity: 43.422
- Laying of screeds Since January 1, 2025 | |||
Main activity: 86.940
- Nursing and midwifery activities Since January 1, 2025 | |||
Main activity: 43.342
- Painting of civil engineering works Since January 1, 2025 | |||
Main activity: 43.12001
- Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc Since January 1, 2025 | |||
Main activity: 43.13002
- Execution of horizontal drilling for cable glands or ducts Since January 1, 2025 | |||
Main activity: 43.223
- Installation of heating, ventilating, air conditioning, refrigeration installations powered by energy sources other than electricity Since January 1, 2025 | |||
Main activity: 42.220
- Construction of utility projects for electricity and telecommunications Since January 1, 2025 | |||
Main activity: 43.24004
- General installation work Since January 1, 2025 | |||
Main activity: 43.212
- General work of electrical installation in industrial plants Since January 1, 2025 | |||
Main activity: 43.34301
- Fitting of glass, mirrors, etc Since January 1, 2025 | |||
Main activity: 43.35002
- Other building completion and finishing work nes Since January 1, 2025 | |||
Main activity: 43.332
- Floor and wall covering with wood Since January 1, 2025 | |||
Main activity: 43.34101
- Interior and exterior painting of buildings Since January 1, 2025 | |||
Main activity: 43.32002
- Assembly of wooden or plastic mobile walls; lining walls, ceilings etc Since January 1, 2025 | |||
Main activity: 43.32012
- Installation of glass interior doors, partition walls, etc Since January 1, 2025 | |||
Main activity: 43.32001
- Assembly of exterior and interior joinery: doors, windows, staircases, fitted kitchen cupboards shop fittings, door and window frames, etc Since January 1, 2025 | |||
Main activity: 43.211
- General work of electrical installation Since January 1, 2025 | |||
Main activity: 43.230
- Installation of insulation Since January 1, 2025 | |||
Main activity: 43.31001
- Application in buildings or other construction projects of plaster or stucco for interiors or exteriors, including related lathing materials Since January 1, 2025 | |||
Main activity: 43.41011
- Waterproofing of roofs and roof terraces Since January 1, 2025 | |||
Main activity: 43.91002
- Execution of repointing Since January 1, 2025 | |||
Main activity: 43.41001
- Framework assembly Since January 1, 2025 | |||
Main activity: 43.120
- Site preparation Since January 1, 2025 | |||
Main activity: 43.35001
- Cleaning of new buildings and rehabilitation of sites after work Since January 1, 2025 | |||
Main activity: 43.33201
- Fitting in buildings or other construction projects of: parquet and other wood floors, wooden wall coverings Since January 1, 2025 | |||
Main activity: 43.22203
- Installation of electrical heating systems Since January 1, 2025 | |||
Main activity: 43.24003
- Other installation works nes, including installation of accessories Since January 1, 2025 | |||
Main activity: 33.200
- Installation of industrial machinery and equipment Since January 1, 2025 | |||
Main activity: 43.110
- Demolition Since January 1, 2025 | |||
Main activity: 43.34201
- Painting of metal frames Since January 1, 2025 | |||
Main activity: 43.910
- Masonry and bricklaying activities Since January 1, 2025 | |||
Main activity: 43.421
- Waterproofing of walls Since January 1, 2025 | |||
Main activity: 43.23002
- Insulation work for heating or cooling pipes Since January 1, 2025 | |||
Main activity: 43.24001
- Installation of blinds and awnings Since January 1, 2025 | |||
Main activity: 81.22011
- Steam cleaning, sand blasting and similar activities for building exteriors Since January 1, 2025 | |||
Main activity: 43.99002
- Execution of lifting work for third parties Since January 1, 2025 | |||
Main activity: 43.23001
- Implementation in buildings or other construction projects of: thermal insulation, acoustic and anti vibration insulation Since January 1, 2025 | |||
Main activity: 43.343
- Glazing Since January 1, 2025 | |||
Main activity: 43.32011
- Assembly of exterior and interior plastic joinery Since January 1, 2025 | |||
Main activity: 43.91001
- Masonry Since January 1, 2025 | |||
Main activity: 43.341
- Painting of buildings Since January 1, 2025 | |||
Main activity: 43.32013
- Assembly of gypsum drywalls Since January 1, 2025 | |||
Main activity: 33.140
- Repair and maintenance of electrical equipment Since January 1, 2025 | |||
Main activity: 43.32007
- Assembly of metal mobile walls; lining walls, ceilings, etc Since January 1, 2025 | |||
Main activity: 43.33101
- Fitting in buildings or other construction projects of: wall coverings or ceramic, concrete or stone tiles; granite flooring and wall coverings, etc Since January 1, 2025 | |||
Main activity: 43.22101
- Installation in buildings or other structures of: plumbing and sanitary facilities, pipes, gas and water connections (except for heating), installation of automatic fire extinguishing systems, etc Since January 1, 2025 | |||
Main activity: 43.331
- Floor and wall covering with tiles Since January 1, 2025 | |||
Main activity: 43.990
- Other specialised construction activities nec Since January 1, 2025 | |||
Main activity: 43.11001
- Demolition of buildings and other constructions Since January 1, 2025 | |||
Main activity: 43.42903
- Installation of steel structure elements not manufactured by the unit carrying out the work Since January 1, 2025 | |||
Main activity: 81.220
- Other building and industrial cleaning activities Since January 1, 2025 | |||
Show the NACE-BEL codes activities version 2008. |
|
(1)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). Activities registered of the NACE-BEL codes (version 2003) were stopped on 31/12/2007, automatically converted to the NACE-BEL codes (version 2008) and registered with a start date of 01/01/2008. This was a mere administrative conversion and no modification of the activity itself.
(2)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). Following a conversion of activities with a NACE-BEL code (2003 version) to NACE-BEL codes (2008 version), the start date of activities (2008 version) is 1/01/2008. Activities with a NACE-BEL code (2008 version) were then stopped on 31/12/2024 and automatically converted to NACE-BEL codes (2025 version). These were mere administrative conversion and no modification of the activity itself. The 2003 activities can be accessed by clicking on the link : "Show the NACE-BEL codes activities version 2003".