shadow
The English version of the Public Search application constitutes an unofficial English translation and is provided for information purposes only.
No legal rights can therefore be derived from this translation. For the official application, please consult the Dutch, French or German versions of the Public Search application.


Attention! This establishment unit has been stopped. Therefore, the shown data reflect the situation at the moment of cessation of the establishment unit.

Establishment unit data

In general

Enterprise number:0459.995.180
Status of the entity:Stopped
Number of the establishment unit:2.080.620.603
Status of the establishment unit:Stopped
Since January 4, 2024
Start date:July 12, 2002
Name of the establishment unit:No information found in the CBE.
Address of the establishment unit:
Rue de Namur   70
5600   Philippeville
Since January 11, 2018
Phone number:No information found in the CBE.
Fax:No information found in the CBE.
Email address:No information found in the CBE.
Web address:No information found in the CBE.
 
 

Authorisations

No data included in CBE.
Licences registered with the Federal Agency for the Safety of the Food Chain (FASFC)  Click here
 
 

Version of Nacebel codes for activities 2008(1)

Main activity: 25.120  - Manufacture of doors and windows of metal
Since January 11, 2018
Main activity: 43.99601  - Screed laying
Since January 11, 2018
Main activity: 43.32031  - Assembly of gypsum drywalls
Since January 11, 2018
Main activity: 43.999  - Other specialised construction activities
Since January 11, 2018
Main activity: 16.230  - Manufacture of other builders' carpentry and joinery
Since January 11, 2018
Main activity: 73.11002  - Creation and placement of advertisements: posters, billboards, luminous newspapers, neon signs, display on buses, etc.
Since January 1, 2008
Main activity: 43.99101  - Waterproofing of roofs and roof terraces
Since January 11, 2018
Main activity: 81.290  - Other cleaning activities
Since September 30, 2008
Main activity: 43.32002  - Assembly of wooden or plastic mobile walls; lining walls, ceilings etc.
Since January 11, 2018
Main activity: 43.12011  - Clearing of building sites
Since January 11, 2018
Main activity: 43.320  - Joinery works
Since January 11, 2018
Main activity: 43.222  - Installation of heating, ventilation and air conditioning
Since January 11, 2018
Main activity: 43.32001  - Assembly of exterior and interior joinery: doors, windows, staircases, fitted kitchen cupboards shop fittings, door and window frames, etc.
Since January 11, 2018
Main activity: 43.332  - Fitting of wood coverings for floors and walls
Since January 11, 2018
 
 

Version of the Nacebel codes for the NSSO-activities 2008(1)

Main activity: 43.910  - Roofing works
Since June 25, 2018
 
 

(1)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). Following a conversion of activities with a NACE-BEL code (2003 version) to NACE-BEL codes (2008 version), the start date of activities (2008 version) is 1/01/2008. Activities with a NACE-BEL code (2008 version) were then stopped on 31/12/2024 and automatically converted to NACE-BEL codes (2025 version). These were mere administrative conversion and no modification of the activity itself. The 2003 activities can be accessed by clicking on the link : "Show the NACE-BEL codes activities version 2003".