Establishment unit data
In general | |||
Enterprise number: | 0476.730.155 | ||
Status of the entity: | Active | ||
Number of the establishment unit: | 2.095.745.574 | ||
Status of the establishment unit: | Active | ||
Start date: | March 13, 2002 | ||
Name of the establishment unit: | No information found in the CBE. | ||
Address of the establishment unit: |
Gemeentestraat(HOM) 1
2811 Mechelen Since February 13, 2015 | ||
Phone number: | No information found in the CBE. | ||
Fax: | No information found in the CBE. | ||
Email address: | No information found in the CBE. | ||
Web address: | No information found in the CBE. | ||
| |||
Authorisations | |||
Licences registered with the Federal Agency for the Safety of the Food Chain (FASFC) Click here | |||
| |||
Version of Nacebel codes for activities 2008(1) | |||
Main activity: 33.20011 - Installation of back-up power systems (generators) Since January 1, 2008 | |||
Main activity: 41.20101 - Realisation of the main structure of individual houses Since January 1, 2008 | |||
Main activity: 41.20112 - Realisation of "turnkey" apartments Since January 1, 2008 | |||
Main activity: 41.20122 - General coordination on the construction site Since January 1, 2008 | |||
Main activity: 43.21101 - Installation of electrical wiring and fittings Since January 1, 2008 | |||
Main activity: 43.21102 - Installation of telecommunication systems and computer facilities Since January 1, 2008 | |||
Main activity: 43.22201 - Installation in buildings or other construction projects of: heating systems, electricity, gas and oil-fired boilers, ventilation and air conditioning material and ducting, etc. Since January 1, 2008 | |||
Main activity: 43.22211 - Installation of electrical heating systems Since January 1, 2008 | |||
Main activity: 43.32012 - Assembly of metal mobile walls; lining walls, ceilings, etc. Since January 1, 2008 | |||
Main activity: 43.32031 - Assembly of gypsum drywalls Since January 1, 2008 | |||
Main activity: 70.22003 - General audit activities Since January 1, 2008 | |||
Main activity: 71.11103 - Supervision of construction work (structural work, installation, finishing work, etc.) Since January 1, 2008 | |||
Main activity: 71.209 - Other technical control and analysis activities Since January 1, 2008 | |||
Main activity: 71.20901 - Tests and analyses relating to composition, physical characteristics, performance, compliance with regulatory texts and standards or specifications of materials, products, installation, etc. Since January 1, 2008 | |||
Main activity: 71.20903 - Implementation of measures concerning water and air purity, radioactivity measurements and other similar phenomena, analysis of potential sources of pollution (smoke, waste water, etc.) Since January 1, 2008 | |||
Main activity: 71.20905 - Control of calculations of building elements Since January 1, 2008 | |||
Main activity: 81.22003 - Chimney sweeping and cleaning of hearths, furnaces, boiler incinerators, ventilation ducts and smoke evacuation devices Since January 1, 2008 | |||
Show the activities for NACEBEL codification version 2003. |
| ||
No data included in CBE. |
(1)The EC-classification of the Nacebel codes has changed on 1/1/2008. Both the Nacebel codification of 2003 and 2008 are available in Public Search. The 2003 codes were valid until 31/12/2007. On 1/1/2008, the new codification became valid. This was a mere administrative conversion : no activities of the entity or establishment unit have thus been changed.