Establishment unit data
In general | |||
Enterprise number: | 0534.892.048 | ||
Status of the entity: | Active | ||
Number of the establishment unit: | 2.219.505.401 | ||
Status of the establishment unit: | Active | ||
Start date: | June 3, 2013 | ||
Name of the establishment unit: |
CHAUFFAGE POURTOIS Name in French, since December 20, 2023 | ||
Address of the establishment unit: |
Rue Bois des Faulx(CAR) 184
7141 Morlanwelz Since January 1, 2019(1) | ||
Phone number: | No information found in the CBE. | ||
Fax: | No information found in the CBE. | ||
Email address: | No information found in the CBE. | ||
Web address: | No information found in the CBE. | ||
| |||
Authorisations | |||
No data included in CBE. | |||
| |||
Version of Nacebel codes for activities 2008(2) | |||
Main activity: 43.222 - Installation of heating, ventilation and air conditioning Since June 3, 2013 | |||
Additional activity: 42.21911 - Construction of water supply, distribution and drainage networks Since June 3, 2013 | |||
Additional activity: 42.21912 - Construction of networks to transport gas, petroleum products, etc. Since June 3, 2013 | |||
Additional activity: 42.22001 - Construction of electrical energy transmission and distribution lines Since June 3, 2013 | |||
Additional activity: 42.22002 - Construction of telecommunication lines and networks Since June 3, 2013 | |||
Additional activity: 42.99001 - Construction of playgrounds and sports fields, swimming pools, etc. Since June 3, 2013 | |||
Additional activity: 43.120 - Site preparation works Since June 3, 2013 | |||
Additional activity: 43.12001 - Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc. Since June 3, 2013 | |||
Additional activity: 43.12003 - Lowering of the water table and drainage of construction sites Since June 3, 2013 | |||
Additional activity: 43.12004 - Drainage of agricultural or forestry land Since June 3, 2013 | |||
Additional activity: 43.12011 - Clearing of building sites Since June 3, 2013 | |||
Additional activity: 43.13002 - Execution of horizontal drilling for cable glands or ducts Since June 3, 2013 | |||
Additional activity: 43.21103 - Installation of surveillance and alarm systems against intruders Since June 3, 2013 | |||
Additional activity: 43.221 - Plumbing works Since June 3, 2013 | |||
Additional activity: 43.291 - Insulation works Since June 3, 2013 | |||
Additional activity: 43.29901 - Installation of blinds and awnings Since June 3, 2013 | |||
Additional activity: 43.320 - Joinery works Since June 3, 2013 | |||
Additional activity: 43.32011 - Assembly of external and internal metal joinery: doors, windows, door and window frames, staircases, fitted kitchen cupboards, shop fittings, etc. Since June 3, 2013 | |||
Additional activity: 43.32012 - Assembly of metal mobile walls; lining walls, ceilings, etc. Since June 3, 2013 | |||
Additional activity: 43.32013 - Assembly of metal garage doors, shutters, blinds, fences, gates, etc. Since June 3, 2013 | |||
Additional activity: 43.32014 - Assembly of metal armoured doors and fire doors Since June 3, 2013 | |||
Additional activity: 43.32031 - Assembly of gypsum drywalls Since June 3, 2013 | |||
Additional activity: 43.99201 - Steam cleaning, sand blasting and similar activities for building exteriors Since June 3, 2013 | |||
Additional activity: 43.99402 - Execution of repointing Since June 3, 2013 | |||
Additional activity: 43.99601 - Screed laying Since June 3, 2013 | |||
Additional activity: 43.99902 - Formwork and rebar work Since June 3, 2013 | |||
Additional activity: 43.99903 - Construction of chimneys and industrial ovens Since June 3, 2013 | |||
Additional activity: 43.99904 - Installation of steel structure elements not manufactured by the unit carrying out the work Since June 3, 2013 | |||
Additional activity: 43.99906 - Assembly and disassembly of scaffolding and work platforms Since June 3, 2013 | |||
| |||
Version of the Nacebel codes for the NSSO-activities 2008(2) | |||
Main activity: 43.222 - Installation of heating, ventilation and air conditioning Since October 1, 2013 | |||
| |||
Version of the Nacebel codes for the NSSO-activities 2025(2) | |||
Main activity: 43.222
- Installation of heating, ventilating, air conditioning, refrigeration installations powered by electricity Since January 1, 2025 |
|
(1) The modification made to the address is of a technical nature. It is related to the modification of a code used in the address data.
(2)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). There are different versions of these codes. Activities with a NACE-BEL code (version 2003) were stopped on 31/12/2007 and automatically converted to the new NACE-BEL codes (2008 version) starting on 01/01/2008. A new 2025 version of the codes will enter into force on 01/01/2025. During the first half of the year 2025, all activities with a 2008 version of the NACE-BEL code will be phased out with 31/12/2024 as end date and automatically converted to the 2025 version of the NACE-BEL codes, starting on 01/01/2025. Up until then, activities will continue to be registered using the 2008 NACE-BEL codes.