Attention! This establishment unit has been stopped. Therefore, the shown data reflect the situation at the moment of cessation of the establishment unit.
Establishment unit data
In general | |||
| Enterprise number: | 0676.434.547 | ||
| Status of the entity: | Stopped | ||
| Number of the establishment unit: | 2.265.637.611 | ||
| Status of the establishment unit: | Stopped Since March 4, 2025 | ||
| Start date: | May 31, 2017 | ||
| Name of the establishment unit: |
Vloerwerken Millecam Name in Dutch, since May 31, 2017 | ||
| Address of the establishment unit: |
Portweg(V) 8
8600 Diksmuide Since December 4, 2017 | ||
| Phone number: | No information found in the CBE. | ||
| Fax: | No information found in the CBE. | ||
| Email address: | No information found in the CBE. | ||
| Web address: | No information found in the CBE. | ||
| | |||
Authorisations | |||
| No data included in CBE. | |||
| Licences registered with the Federal Agency for the Safety of the Food Chain (FASFC) Click here | |||
| | |||
Version of Nacebel codes for activities 2025(1) | |||
| Main activity: 81.30002
- Creation and maintenance of gardens, parks and green spaces for sports facilities Since January 1, 2025 | |||
| Main activity: 43.120
- Site preparation Since January 1, 2025 | |||
| Main activity: 43.91002
- Execution of repointing Since January 1, 2025 | |||
| Main activity: 41.00101
- Realisation of the main structure of individual houses Since January 1, 2025 | |||
| Main activity: 43.91001
- Masonry Since January 1, 2025 | |||
| Main activity: 43.12002
- Site preparation for mining: overburden removal and other development and preparation of land and mining sites Since January 1, 2025 | |||
| Main activity: 41.00105
- Realisation of the structural work of buildings Since January 1, 2025 | |||
| Main activity: 43.12004
- Drainage of agricultural or forestry land Since January 1, 2025 | |||
| Main activity: 43.35002
- Other building completion and finishing work nes Since January 1, 2025 | |||
| Main activity: 43.12001
- Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc Since January 1, 2025 | |||
| Main activity: 43.332
- Floor and wall covering with wood Since January 1, 2025 | |||
| Main activity: 43.33101
- Fitting in buildings or other construction projects of: wall coverings or ceramic, concrete or stone tiles; granite flooring and wall coverings, etc Since January 1, 2025 | |||
| Main activity: 43.331
- Floor and wall covering with tiles Since January 1, 2025 | |||
| Main activity: 43.12003
- Lowering of the water table and drainage of construction sites Since January 1, 2025 | |||
| Main activity: 43.910
- Masonry and bricklaying activities Since January 1, 2025 | |||
| |
(1)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). Activities registered of the NACE-BEL codes (version 2003) were stopped on 31/12/2007, automatically converted to the NACE-BEL codes (version 2008) and registered with a start date of 01/01/2008. This was a mere administrative conversion and no modification of the activity itself.

