Establishment unit data
In general | |||
Enterprise number: | 0681.997.201 | ||
Status of the entity: | Active | ||
Number of the establishment unit: | 2.268.552.559 | ||
Status of the establishment unit: | Active | ||
Start date: | October 2, 2017 | ||
Name of the establishment unit: |
ECOSTABIL Name in French, since October 2, 2017 | ||
Address of the establishment unit: |
Chemin de la Carrière 85
1420 Braine-l'Alleud Since October 2, 2017 | ||
Phone number: | No information found in the CBE. | ||
Fax: | No information found in the CBE. | ||
Email address: | No information found in the CBE. | ||
Web address: | No information found in the CBE. | ||
| |||
Authorisations | |||
Licences registered with the Federal Agency for the Safety of the Food Chain (FASFC) Click here | |||
| |||
Version of Nacebel codes for activities 2008(1) | |||
Main activity: 02.10001
- Growing of standing timber: planting, replanting, transplanting, thinning and conserving of forests and timber tracts Since October 2, 2017 | |||
Main activity: 42.110
- Construction of roads and motorways Since October 2, 2017 | |||
Main activity: 42.11001
- Construction of motorways, roads, streets, pavements and other vehicular and pedestrian roads (including the installation of crash barriers) Since October 2, 2017 | |||
Main activity: 42.11002
- Construction of airstrips Since October 2, 2017 | |||
Main activity: 42.12001
- Construction of railways: laying ballast and rails, restoration and repair of tracks Since October 2, 2017 | |||
Main activity: 42.211
- Construction of water and gas distribution networks Since October 2, 2017 | |||
Main activity: 42.212
- Construction of drainage systems for waste water Since October 2, 2017 | |||
Main activity: 42.911
- Dredging works Since October 2, 2017 | |||
Main activity: 42.91102
- Cleaning of rivers, ditches, etc. Since October 2, 2017 | |||
Main activity: 43.12001
- Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc. Since October 2, 2017 | |||
Main activity: 43.12004
- Drainage of agricultural or forestry land Since October 2, 2017 | |||
Main activity: 43.12011
- Clearing of building sites Since October 2, 2017 | |||
Main activity: 43.390
- Other finishing work Since October 2, 2017 | |||
Main activity: 43.39002
- Other building completion and finishing work n.e.s. Since October 2, 2017 | |||
Main activity: 81.30001
- Pruning of trees and hedges Since October 2, 2017 | |||
Main activity: 81.30002
- Creation and maintenance of gardens, parks and green spaces for sports facilities Since October 2, 2017 |
| ||
No data included in CBE. |
(1)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). There are different versions of these codes. Activities with a NACE-BEL code (version 2003) were stopped on 31/12/2007 and automatically converted to the new NACE-BEL codes (2008 version) starting on 01/01/2008. A new 2025 version of the codes will enter into force on 01/01/2025. During the first half of the year 2025, all activities with a 2008 version of the NACE-BEL code will be phased out with 31/12/2024 as end date and automatically converted to the 2025 version of the NACE-BEL codes, starting on 01/01/2025. Up until then, activities will continue to be registered using the 2008 NACE-BEL codes.