Establishment unit data
In general | |||
Enterprise number: | 0686.595.989 | ||
Status of the entity: | Active | ||
Number of the establishment unit: | 2.271.593.510 | ||
Status of the establishment unit: | Active | ||
Start date: | December 19, 2017 | ||
Name of the establishment unit: |
DANNYRAAM Name in Dutch, since December 19, 2017 | ||
Address of the establishment unit: |
Tolstraat 9
9320 Aalst Since March 1, 2022 | ||
Phone number: | No information found in the CBE. | ||
Fax: | No information found in the CBE. | ||
Email address: | No information found in the CBE. | ||
Web address: | No information found in the CBE. | ||
| |||
Authorisations | |||
No data included in CBE. | |||
| |||
Version of Nacebel codes for activities 2008(1) | |||
Main activity: 22.23001
- Manufacture of doors and windows and their frames, shutters, blinds, baseboards, mouldings, etc. Since March 12, 2024 | |||
Main activity: 23.120
- Shaping and processing of flat glass Since March 12, 2024 | |||
Main activity: 23.70001
- Cutting, shaping and finishing of stone for the construction of buildings or roads, coverage roofs, etc. Since March 12, 2024 | |||
Main activity: 25.120
- Manufacture of doors and windows of metal Since March 12, 2024 | |||
Main activity: 25.12001
- Manufacture of metal joinery: doors and windows, shutters, movable partitions, gates, garage doors, etc. Since March 12, 2024 | |||
Main activity: 25.501
- Metal forging Since March 12, 2024 | |||
Main activity: 25.50101
- Production of metal forgings for third parties Since March 12, 2024 | |||
Main activity: 25.50102
- Production and assembly of forged parts for construction: stair railings, balustrades, etc. Since March 12, 2024 | |||
Main activity: 25.610
- Treatment and coating of metals Since March 12, 2024 | |||
Main activity: 25.61001
- Plating, anodizing, and., of metals Since March 12, 2024 | |||
Main activity: 25.61002
- Coating of metals by electrolysis or immersion Since March 12, 2024 | |||
Main activity: 25.61003
- heat treatment of metals Since March 12, 2024 | |||
Main activity: 25.61004
- Deburring, sand blasting, sanding barrel, metal cleaning Since March 12, 2024 | |||
Main activity: 25.61005
- Colouring, engraving, printing of metal Since March 12, 2024 | |||
Main activity: 25.61006
- Non-metallic coating of metals: plasticising, enamelling, lacquering etc. Since March 12, 2024 | |||
Main activity: 25.61007
- Hardening and metal buffing Since March 12, 2024 | |||
Main activity: 25.62001
- Drilling, turning, milling, shaving, planing, lapping, broaching, dressage, sawing, grinding, sharpening, etc. of metal parts Since March 12, 2024 | |||
Main activity: 25.720
- Manufacture of locks and hinges Since March 12, 2024 | |||
Main activity: 25.72001
- Manufacture of locks, padlocks, locks, keys and locksmith similar articles for the building, furniture, vehicles, etc. Since March 12, 2024 | |||
Main activity: 25.72002
- Manufacture of hinges, hinge pins, Since March 12, 2024 | |||
Main activity: 31.020
- Manufacture of kitchen furniture Since March 12, 2024 | |||
Main activity: 31.02001
- Manufacture of modular furniture and components for kitchens Since March 12, 2024 | |||
Main activity: 31.09901
- Manufacturing cupboards, special furniture for television sets, accessory furniture, etc. Since March 12, 2024 | |||
Main activity: 42.21901
- Drilling and water well construction, shaft sinking Since December 19, 2017 | |||
Main activity: 43.110
- Demolition works Since March 12, 2024 | |||
Main activity: 43.11001
- Demolition of buildings and other constructions Since March 12, 2024 | |||
Main activity: 43.120
- Site preparation works Since December 19, 2017 | |||
Main activity: 43.12001
- Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc. Since March 12, 2024 | |||
Main activity: 43.12011
- Clearing of building sites Since March 12, 2024 | |||
Main activity: 43.130
- Test drilling and surveys Since December 19, 2017 | |||
Main activity: 43.13001
- Test surveys, test drilling and core sampling for construction as well as for geophysical or geological studies, or similar Since March 12, 2024 | |||
Main activity: 43.291
- Insulation works Since December 19, 2017 | |||
Main activity: 43.29101
- Implementation in buildings or other construction projects of: thermal insulation, acoustic and anti vibration insulation Since March 12, 2024 | |||
Main activity: 43.29901
- Installation of blinds and awnings Since March 12, 2024 | |||
Main activity: 43.29903
- Other installation works n.e.s., including installation of accessories Since December 19, 2017 | |||
Main activity: 43.320
- Joinery works Since March 12, 2024 | |||
Main activity: 43.32001
- Assembly of exterior and interior joinery: doors, windows, staircases, fitted kitchen cupboards shop fittings, door and window frames, etc. Since March 12, 2024 | |||
Main activity: 43.32002
- Assembly of wooden or plastic mobile walls; lining walls, ceilings etc. Since March 12, 2024 | |||
Main activity: 43.32003
- Assembly of wooden or plastic garage doors, shutters, blinds, fences, gates etc. Since March 12, 2024 | |||
Main activity: 43.32004
- Assembly of wooden or plastic armoured doors and firewall doors Since March 12, 2024 | |||
Main activity: 43.32005
- Assembly of wooden or plastic greenhouses, verandas etc. Since March 12, 2024 | |||
Main activity: 43.32011
- Assembly of external and internal metal joinery: doors, windows, door and window frames, staircases, fitted kitchen cupboards, shop fittings, etc. Since March 12, 2024 | |||
Main activity: 43.32012
- Assembly of metal mobile walls; lining walls, ceilings, etc. Since March 12, 2024 | |||
Main activity: 43.32013
- Assembly of metal garage doors, shutters, blinds, fences, gates, etc. Since March 12, 2024 | |||
Main activity: 43.32014
- Assembly of metal armoured doors and fire doors Since March 12, 2024 | |||
Main activity: 43.32015
- Assembly of metal greenhouses, verandas, etc. Since March 12, 2024 | |||
Main activity: 43.32016
- Assembly of exterior and interior plastic joinery Since March 12, 2024 | |||
Main activity: 43.32021
- Installation of glass interior doors, partition walls, etc. Since March 12, 2024 | |||
Main activity: 43.32031
- Assembly of gypsum drywalls Since March 12, 2024 | |||
Main activity: 43.331
- Tiling of floors and walls Since March 12, 2024 | |||
Main activity: 43.332
- Fitting of wood coverings for floors and walls Since March 12, 2024 | |||
Main activity: 43.33201
- Fitting in buildings or other construction projects of: parquet and other wood floors, wooden wall coverings Since March 12, 2024 | |||
Main activity: 43.333
- Wallpapering and wall and floor coverings in other materials Since March 12, 2024 | |||
Main activity: 43.33301
- Wallpapering Since March 12, 2024 | |||
Main activity: 43.341
- Painting of buildings Since March 12, 2024 | |||
Main activity: 43.34101
- Interior and exterior painting of buildings Since March 12, 2024 | |||
Main activity: 43.34201
- Painting of metal frames Since March 12, 2024 | |||
Main activity: 43.343
- Glaziery Since March 12, 2024 | |||
Main activity: 43.34301
- Fitting of glass, mirrors, etc. Since March 12, 2024 | |||
Main activity: 43.390
- Other finishing work Since December 19, 2017 | |||
Main activity: 43.39001
- Cleaning of new buildings and rehabilitation of sites after work Since March 12, 2024 | |||
Main activity: 43.39002
- Other building completion and finishing work n.e.s. Since March 12, 2024 | |||
Main activity: 43.910
- Roofing works Since March 12, 2024 | |||
Main activity: 43.91001
- Framework assembly Since March 12, 2024 | |||
Main activity: 43.91002
- Covering work using all materials Since March 12, 2024 | |||
Main activity: 43.91003
- Installation of draining elements for rainwater Since March 12, 2024 | |||
Main activity: 43.99101
- Waterproofing of roofs and roof terraces Since March 12, 2024 | |||
Main activity: 43.992
- Restoration of façades Since December 19, 2017 | |||
Main activity: 43.99201
- Steam cleaning, sand blasting and similar activities for building exteriors Since March 12, 2024 | |||
Main activity: 43.993
- Construction of decorative fireplaces and open fireplaces Since December 19, 2017 | |||
Main activity: 43.99301
- Construction of decorative fireplaces and open fireplaces Since March 12, 2024 | |||
Main activity: 43.994
- Masonry and repointing Since March 12, 2024 | |||
Main activity: 43.99401
- Masonry Since March 12, 2024 | |||
Main activity: 43.99402
- Execution of repointing Since December 19, 2017 | |||
Main activity: 43.995
- Building restoration works Since December 19, 2017 | |||
Main activity: 43.996
- Screed laying Since March 12, 2024 | |||
Main activity: 43.99601
- Screed laying Since March 12, 2024 | |||
Main activity: 43.999
- Other specialised construction activities Since March 12, 2024 | |||
Main activity: 43.99901
- Establishment of foundations, including pile driving Since December 19, 2017 | |||
Main activity: 43.99902
- Formwork and rebar work Since March 12, 2024 | |||
Main activity: 43.99903
- Construction of chimneys and industrial ovens Since March 12, 2024 | |||
Main activity: 43.99904
- Installation of steel structure elements not manufactured by the unit carrying out the work Since December 19, 2017 | |||
Main activity: 43.99906
- Assembly and disassembly of scaffolding and work platforms Since December 19, 2017 | |||
Main activity: 71.11103
- Supervision of construction work (structural work, installation, finishing work, etc.) Since March 12, 2024 | |||
Main activity: 71.11104
- Operation of major maintenance of buildings Since March 12, 2024 | |||
Main activity: 81.210
- General cleaning of buildings Since March 12, 2024 | |||
Main activity: 81.22002
- Window cleaning Since March 12, 2024 |
|
(1)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). There are different versions of these codes. Activities with a NACE-BEL code (version 2003) were stopped on 31/12/2007 and automatically converted to the new NACE-BEL codes (2008 version) starting on 01/01/2008. A new 2025 version of the codes will enter into force on 01/01/2025. During the first half of the year 2025, all activities with a 2008 version of the NACE-BEL code will be phased out with 31/12/2024 as end date and automatically converted to the 2025 version of the NACE-BEL codes, starting on 01/01/2025. Up until then, activities will continue to be registered using the 2008 NACE-BEL codes.