Establishment unit data
In general | |||||
Enterprise number: | 0688.678.620 | ||||
Status of the entity: | Active | ||||
Number of the establishment unit: | 2.272.089.297 | ||||
Status of the establishment unit: | Active | ||||
Start date: | January 19, 2018 | ||||
Name of the establishment unit: |
DG CONSTRUCT Name in Dutch, since January 19, 2018 | ||||
Address of the establishment unit: |
Wingerstraat 52
3390 Tielt-Winge Since January 19, 2018 | ||||
Phone number: | No information found in the CBE. | ||||
Fax: | No information found in the CBE. | ||||
Email address: |
| ||||
Web address: | No information found in the CBE. | ||||
| |||||
Authorisations | |||||
No data included in CBE. | |||||
| |||||
Version of Nacebel codes for activities 2008(2) | |||||
Main activity: 23.700 - Cutting, shaping and finishing of stone Since January 19, 2018 | |||||
Main activity: 25.11003 - Manufacture of prefabricated buildings mainly of metal: site huts, modular exhibition elements, telephone booths, etc .. Since January 19, 2018 | |||||
Main activity: 31.010 - Manufacture of office and shop furniture Since January 19, 2018 | |||||
Main activity: 31.020 - Manufacture of kitchen furniture Since January 19, 2018 | |||||
Main activity: 31.091 - Manufacture of dining rooms, lounges, bedrooms and bathrooms Since January 19, 2018 | |||||
Main activity: 31.092 - Manufacture of garden and outdoor furniture Since January 19, 2018 | |||||
Main activity: 31.099 - Manufacture of other furniture n.e.c. Since January 19, 2018 | |||||
Main activity: 33.12011 - Mechanical maintenance and repairs for third parties Since January 19, 2018 | |||||
Main activity: 42.11001 - Construction of motorways, roads, streets, pavements and other vehicular and pedestrian roads (including the installation of crash barriers) Since January 19, 2018 | |||||
Main activity: 42.21901 - Drilling and water well construction, shaft sinking Since January 19, 2018 | |||||
Main activity: 42.22002 - Construction of telecommunication lines and networks Since January 19, 2018 | |||||
Main activity: 43.110 - Demolition works Since April 30, 2019 | |||||
Main activity: 43.12001 - Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc. Since January 19, 2018 | |||||
Main activity: 43.12011 - Clearing of building sites Since January 19, 2018 | |||||
Main activity: 43.130 - Test drilling and surveys Since January 19, 2018 | |||||
Main activity: 43.21101 - Installation of electrical wiring and fittings Since April 30, 2019 | |||||
Main activity: 43.21102 - Installation of telecommunication systems and computer facilities Since January 19, 2018 | |||||
Main activity: 43.221 - Plumbing works Since April 30, 2019 | |||||
Main activity: 43.222 - Installation of heating, ventilation and air conditioning Since April 30, 2019 | |||||
Main activity: 43.291 - Insulation works Since January 19, 2018 | |||||
Main activity: 43.29101 - Implementation in buildings or other construction projects of: thermal insulation, acoustic and anti vibration insulation Since January 19, 2018 | |||||
Main activity: 43.29102 - Insulation work for heating or cooling pipes Since January 19, 2018 | |||||
Main activity: 43.29103 - Insulation work for cold storage or refrigerated warehouses Since January 19, 2018 | |||||
Main activity: 43.299 - Other installation works n.e.c. Since April 30, 2019 | |||||
Main activity: 43.29901 - Installation of blinds and awnings Since January 19, 2018 | |||||
Main activity: 43.29912 - Installation of building aerials and lightning rods Since January 19, 2018 | |||||
Main activity: 43.310 - Plastering works Since April 30, 2019 | |||||
Main activity: 43.320 - Joinery works Since April 30, 2019 | |||||
Main activity: 43.331 - Tiling of floors and walls Since January 19, 2018 | |||||
Main activity: 43.33101 - Fitting in buildings or other construction projects of: wall coverings or ceramic, concrete or stone tiles; granite flooring and wall coverings, etc. Since January 19, 2018 | |||||
Main activity: 43.332 - Fitting of wood coverings for floors and walls Since April 30, 2019 | |||||
Main activity: 43.333 - Wallpapering and wall and floor coverings in other materials Since April 30, 2019 | |||||
Main activity: 43.341 - Painting of buildings Since April 30, 2019 | |||||
Main activity: 43.34202 - Painting of ships and boats by non-specialised units Since January 19, 2018 | |||||
Main activity: 43.343 - Glaziery Since April 30, 2019 | |||||
Main activity: 43.39001 - Cleaning of new buildings and rehabilitation of sites after work Since January 19, 2018 | |||||
Main activity: 43.39002 - Other building completion and finishing work n.e.s. Since January 19, 2018 | |||||
Main activity: 43.910 - Roofing works Since April 30, 2019 | |||||
Main activity: 43.991 - Waterproofing of walls Since April 30, 2019 | |||||
Main activity: 43.992 - Restoration of façades Since January 19, 2018 | |||||
Main activity: 43.99201 - Steam cleaning, sand blasting and similar activities for building exteriors Since January 19, 2018 | |||||
Main activity: 43.994 - Masonry and repointing Since April 30, 2019 | |||||
Main activity: 43.99402 - Execution of repointing Since January 19, 2018 | |||||
Main activity: 43.995 - Building restoration works Since April 30, 2019 | |||||
Main activity: 43.996 - Screed laying Since April 30, 2019 | |||||
Main activity: 43.999 - Other specialised construction activities Since April 30, 2019 | |||||
Main activity: 43.99901 - Establishment of foundations, including pile driving Since January 19, 2018 | |||||
Main activity: 43.99904 - Installation of steel structure elements not manufactured by the unit carrying out the work Since January 19, 2018 | |||||
Main activity: 43.99905 - Execution of lifting work for third parties Since January 19, 2018 | |||||
Main activity: 43.99906 - Assembly and disassembly of scaffolding and work platforms Since January 19, 2018 | |||||
Main activity: 81.210 - General cleaning of buildings Since January 19, 2018 | |||||
Main activity: 81.220 - Other building and industrial cleaning activities Since January 19, 2018 | |||||
Main activity: 81.22001 - Interior cleaning of buildings of all types: offices, factories, workshops, premises of institutions and other premises for commercial or professional use, apartment buildings, etc. Since January 19, 2018 | |||||
Main activity: 81.22002 - Window cleaning Since January 19, 2018 | |||||
Main activity: 81.22003 - Chimney sweeping and cleaning of hearths, furnaces, boiler incinerators, ventilation ducts and smoke evacuation devices Since January 19, 2018 |
|
(1)Address data and contact data have been divided from each other. Due to this change it is possible that the start date of the contact data is not correct. For more information, click here.
(2)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). There are different versions of these codes. Activities with a NACE-BEL code (version 2003) were stopped on 31/12/2007 and automatically converted to the new NACE-BEL codes (2008 version) starting on 01/01/2008. A new 2025 version of the codes will enter into force on 01/01/2025. During the first half of the year 2025, all activities with a 2008 version of the NACE-BEL code will be phased out with 31/12/2024 as end date and automatically converted to the 2025 version of the NACE-BEL codes, starting on 01/01/2025. Up until then, activities will continue to be registered using the 2008 NACE-BEL codes.