Attention! This establishment unit has been stopped. Therefore, the shown data reflect the situation at the moment of cessation of the establishment unit.
Establishment unit data
In general | |||
Enterprise number: | 0693.836.050 | ||
Status of the entity: | Stopped | ||
Number of the establishment unit: | 2.274.335.145 | ||
Status of the establishment unit: | Stopped Since November 1, 2021 | ||
Start date: | April 1, 2018 | ||
Name of the establishment unit: | No information found in the CBE. | ||
Address of the establishment unit: |
Ieperstraat(Wijtsch) 143
8953 Heuvelland Since January 1, 2019 | ||
Phone number: | No information found in the CBE. | ||
Fax: | No information found in the CBE. | ||
Email address: | No information found in the CBE. | ||
Web address: | No information found in the CBE. | ||
| |||
Authorisations | |||
No data included in CBE. | |||
| |||
Version of Nacebel codes for activities 2008(1) | |||
Main activity: 25.110 - Manufacture of metal structures and parts of structures Since April 1, 2018 | |||
Main activity: 25.120 - Manufacture of doors and windows of metal Since April 1, 2018 | |||
Main activity: 31.010 - Manufacture of office and shop furniture Since April 1, 2018 | |||
Main activity: 31.020 - Manufacture of kitchen furniture Since April 1, 2018 | |||
Main activity: 31.091 - Manufacture of dining rooms, lounges, bedrooms and bathrooms Since April 1, 2018 | |||
Main activity: 31.092 - Manufacture of garden and outdoor furniture Since April 1, 2018 | |||
Main activity: 31.099 - Manufacture of other furniture n.e.c. Since April 1, 2018 | |||
Main activity: 41.101 - Residential property development Since April 1, 2018 | |||
Main activity: 41.102 - Non-residential property development Since April 1, 2018 | |||
Main activity: 41.201 - General construction of residential buildings Since April 1, 2018 | |||
Main activity: 41.20101 - Realisation of the main structure of individual houses Since April 1, 2018 | |||
Main activity: 41.20102 - Construction of individual "turnkey" houses Since April 1, 2018 | |||
Main activity: 41.20111 - Realisation of the main structure of multi-cellular buildings (apartments, etc.) Since April 1, 2018 | |||
Main activity: 41.20112 - Realisation of "turnkey" apartments Since April 1, 2018 | |||
Main activity: 41.20121 - Realisation of the structural work of buildings Since April 1, 2018 | |||
Main activity: 41.20122 - General coordination on the construction site Since April 1, 2018 | |||
Main activity: 41.202 - General construction of office buildings Since April 1, 2018 | |||
Main activity: 41.203 - General construction of other non-residential buildings Since April 1, 2018 | |||
Main activity: 43.11001 - Demolition of buildings and other constructions Since April 1, 2018 | |||
Main activity: 43.120 - Site preparation works Since April 1, 2018 | |||
Main activity: 43.291 - Insulation works Since April 1, 2018 | |||
Main activity: 43.29901 - Installation of blinds and awnings Since April 1, 2018 | |||
Main activity: 43.29902 - Installation of signs, illuminated or not Since April 1, 2018 | |||
Main activity: 43.29903 - Other installation works n.e.s., including installation of accessories Since April 1, 2018 | |||
Main activity: 43.29904 - General installation work Since April 1, 2018 | |||
Main activity: 43.320 - Joinery works Since April 1, 2018 | |||
Main activity: 43.32005 - Assembly of wooden or plastic greenhouses, verandas etc. Since April 1, 2018 | |||
Main activity: 43.331 - Tiling of floors and walls Since April 1, 2018 | |||
Main activity: 43.332 - Fitting of wood coverings for floors and walls Since April 1, 2018 | |||
Main activity: 43.333 - Wallpapering and wall and floor coverings in other materials Since April 1, 2018 | |||
Main activity: 43.343 - Glaziery Since April 1, 2018 | |||
Main activity: 43.390 - Other finishing work Since April 1, 2018 | |||
Main activity: 43.910 - Roofing works Since April 1, 2018 | |||
Main activity: 43.991 - Waterproofing of walls Since April 1, 2018 | |||
Main activity: 43.994 - Masonry and repointing Since April 1, 2018 | |||
Main activity: 43.995 - Building restoration works Since April 1, 2018 | |||
Main activity: 43.99901 - Establishment of foundations, including pile driving Since April 1, 2018 | |||
Main activity: 43.99904 - Installation of steel structure elements not manufactured by the unit carrying out the work Since April 1, 2018 | |||
Main activity: 43.99905 - Execution of lifting work for third parties Since April 1, 2018 |
|
(1)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). There are different versions of these codes. Activities with a NACE-BEL code (version 2003) were stopped on 31/12/2007 and automatically converted to the new NACE-BEL codes (2008 version) starting on 01/01/2008. A new 2025 version of the codes will enter into force on 01/01/2025. During the first half of the year 2025, all activities with a 2008 version of the NACE-BEL code will be phased out with 31/12/2024 as end date and automatically converted to the 2025 version of the NACE-BEL codes, starting on 01/01/2025. Up until then, activities will continue to be registered using the 2008 NACE-BEL codes.