Establishment unit data
In general | |||
Enterprise number: | 0695.897.202 | ||
Status of the entity: | Active | ||
Number of the establishment unit: | 2.275.765.104 | ||
Status of the establishment unit: | Active | ||
Start date: | May 14, 2018 | ||
Name of the establishment unit: |
STUDIO ALTO Name in French, since May 14, 2018 | ||
Address of the establishment unit: |
Avenue Louise 523
1050 Ixelles Since September 1, 2023 | ||
Phone number: | No information found in the CBE. | ||
Fax: | No information found in the CBE. | ||
Email address: | No information found in the CBE. | ||
Web address: | No information found in the CBE. | ||
| |||
Authorisations | |||
Licences registered with the Federal Agency for the Safety of the Food Chain (FASFC) Click here | |||
| |||
Version of Nacebel codes for activities 2008(1) | |||
Main activity: 16.230 - Manufacture of other builders' carpentry and joinery Since July 1, 2020 | |||
Main activity: 16.291 - Manufacture of other products of wood Since July 1, 2020 | |||
Main activity: 23.120 - Shaping and processing of flat glass Since July 1, 2020 | |||
Main activity: 23.700 - Cutting, shaping and finishing of stone Since July 1, 2020 | |||
Main activity: 25.720 - Manufacture of locks and hinges Since July 1, 2020 | |||
Main activity: 25.99914 - Manufacture of metal roofing elements: gutters, roof capping, etc. Since July 1, 2020 | |||
Main activity: 27.40203 - Manufacturing illuminated billboards, neon signs, bright placards, etc. Since July 1, 2020 | |||
Main activity: 31.010 - Manufacture of office and shop furniture Since July 1, 2020 | |||
Main activity: 31.020 - Manufacture of kitchen furniture Since July 1, 2020 | |||
Main activity: 31.091 - Manufacture of dining rooms, lounges, bedrooms and bathrooms Since July 1, 2020 | |||
Main activity: 31.092 - Manufacture of garden and outdoor furniture Since July 1, 2020 | |||
Main activity: 31.099 - Manufacture of other furniture n.e.c. Since July 1, 2020 | |||
Main activity: 33.11001 - Repair and maintenance of domestic boilers Since July 1, 2020 | |||
Main activity: 33.140 - Repair of electrical equipment Since July 1, 2020 | |||
Main activity: 33.200 - Installation of industrial machinery and equipment Since July 1, 2020 | |||
Main activity: 41.201 - General construction of residential buildings Since July 1, 2020 | |||
Main activity: 41.20102 - Construction of individual "turnkey" houses Since July 1, 2020 | |||
Main activity: 41.20112 - Realisation of "turnkey" apartments Since July 1, 2020 | |||
Main activity: 41.20122 - General coordination on the construction site Since July 1, 2020 | |||
Main activity: 41.202 - General construction of office buildings Since July 1, 2020 | |||
Main activity: 41.203 - General construction of other non-residential buildings Since July 1, 2020 | |||
Main activity: 42.212 - Construction of drainage systems for waste water Since July 1, 2020 | |||
Main activity: 42.21901 - Drilling and water well construction, shaft sinking Since July 1, 2020 | |||
Main activity: 42.21911 - Construction of water supply, distribution and drainage networks Since July 1, 2020 | |||
Main activity: 42.220 - Construction of electricity and telecommunications networks Since July 1, 2020 | |||
Main activity: 42.990 - Construction of other civil engineering projects n.e.c. Since July 1, 2020 | |||
Main activity: 43.110 - Demolition works Since July 1, 2020 | |||
Main activity: 43.130 - Test drilling and surveys Since July 1, 2020 | |||
Main activity: 43.211 - Electrotechnical installation work for buildings Since July 1, 2020 | |||
Main activity: 43.212 - Electrotechnical installation work other than buildings Since July 1, 2020 | |||
Main activity: 43.221 - Plumbing works Since July 1, 2020 | |||
Main activity: 43.22101 - Installation in buildings or other structures of: plumbing and sanitary facilities, pipes, gas and water connections (except for heating), installation of automatic fire extinguishing systems, etc. Since July 1, 2020 | |||
Main activity: 43.222 - Installation of heating, ventilation and air conditioning Since July 1, 2020 | |||
Main activity: 43.22211 - Installation of electrical heating systems Since July 1, 2020 | |||
Main activity: 43.291 - Insulation works Since July 1, 2020 | |||
Main activity: 43.29902 - Installation of signs, illuminated or not Since July 1, 2020 | |||
Main activity: 43.29903 - Other installation works n.e.s., including installation of accessories Since July 1, 2020 | |||
Main activity: 43.310 - Plastering works Since July 1, 2020 | |||
Main activity: 43.31001 - Application in buildings or other construction projects of plaster or stucco for interiors or exteriors, including related lathing materials Since July 1, 2020 | |||
Main activity: 43.320 - Joinery works Since July 1, 2020 | |||
Main activity: 43.32004 - Assembly of wooden or plastic armoured doors and firewall doors Since July 1, 2020 | |||
Main activity: 43.32005 - Assembly of wooden or plastic greenhouses, verandas etc. Since July 1, 2020 | |||
Main activity: 43.32012 - Assembly of metal mobile walls; lining walls, ceilings, etc. Since July 1, 2020 | |||
Main activity: 43.32014 - Assembly of metal armoured doors and fire doors Since July 1, 2020 | |||
Main activity: 43.32015 - Assembly of metal greenhouses, verandas, etc. Since July 1, 2020 | |||
Main activity: 43.32021 - Installation of glass interior doors, partition walls, etc. Since July 1, 2020 | |||
Main activity: 43.32031 - Assembly of gypsum drywalls Since July 1, 2020 | |||
Main activity: 43.331 - Tiling of floors and walls Since July 1, 2020 | |||
Main activity: 43.33101 - Fitting in buildings or other construction projects of: wall coverings or ceramic, concrete or stone tiles; granite flooring and wall coverings, etc. Since July 1, 2020 | |||
Main activity: 43.332 - Fitting of wood coverings for floors and walls Since July 1, 2020 | |||
Main activity: 43.33201 - Fitting in buildings or other construction projects of: parquet and other wood floors, wooden wall coverings Since July 1, 2020 | |||
Main activity: 43.333 - Wallpapering and wall and floor coverings in other materials Since July 1, 2020 | |||
Main activity: 43.33301 - Wallpapering Since July 1, 2020 | |||
Main activity: 43.341 - Painting of buildings Since July 1, 2020 | |||
Main activity: 43.342 - Painting of civil engineering works Since July 1, 2020 | |||
Main activity: 43.343 - Glaziery Since July 1, 2020 | |||
Main activity: 43.34301 - Fitting of glass, mirrors, etc. Since July 1, 2020 | |||
Main activity: 43.390 - Other finishing work Since July 1, 2020 | |||
Main activity: 43.910 - Roofing works Since July 1, 2020 | |||
Main activity: 43.91001 - Framework assembly Since July 1, 2020 | |||
Main activity: 43.91002 - Covering work using all materials Since July 1, 2020 | |||
Main activity: 43.91003 - Installation of draining elements for rainwater Since July 1, 2020 | |||
Main activity: 43.99101 - Waterproofing of roofs and roof terraces Since July 1, 2020 | |||
Main activity: 43.99111 - Treatment of walls with water repellent products Since July 1, 2020 | |||
Main activity: 43.992 - Restoration of façades Since July 1, 2020 | |||
Main activity: 43.993 - Construction of decorative fireplaces and open fireplaces Since July 1, 2020 | |||
Main activity: 43.994 - Masonry and repointing Since July 1, 2020 | |||
Main activity: 43.99402 - Execution of repointing Since July 1, 2020 | |||
Main activity: 43.995 - Building restoration works Since July 1, 2020 | |||
Main activity: 43.996 - Screed laying Since July 1, 2020 | |||
Main activity: 43.999 - Other specialised construction activities Since July 1, 2020 | |||
Main activity: 43.99901 - Establishment of foundations, including pile driving Since July 1, 2020 | |||
Main activity: 43.99902 - Formwork and rebar work Since July 1, 2020 | |||
Main activity: 43.99904 - Installation of steel structure elements not manufactured by the unit carrying out the work Since July 1, 2020 | |||
Main activity: 43.99906 - Assembly and disassembly of scaffolding and work platforms Since July 1, 2020 | |||
Main activity: 46.14005 - Commission trade of electrical and electronic equipment, including installation material for industrial use Since July 1, 2020 | |||
Main activity: 47.521 - Retail trade of specialised stores of building materials, general assortment in specialised stores Since July 1, 2020 | |||
Main activity: 71.11103 - Supervision of construction work (structural work, installation, finishing work, etc.) Since July 1, 2020 | |||
Main activity: 71.112 - Interior architecture Since May 14, 2018 | |||
Main activity: 71.11301 - Studies and advice on urban planning and landscape architecture Since July 1, 2020 | |||
Main activity: 73.11002 - Creation and placement of advertisements: posters, billboards, luminous newspapers, neon signs, display on buses, etc. Since July 1, 2020 | |||
Main activity: 74.104 - Interior decoration Since July 1, 2020 | |||
Main activity: 81.300 - Landscape service activities Since July 1, 2020 | |||
Main activity: 81.30001 - Pruning of trees and hedges Since July 1, 2020 | |||
Main activity: 81.30002 - Creation and maintenance of gardens, parks and green spaces for sports facilities Since July 1, 2020 | |||
Main activity: 95.110 - Repair of computers and peripheral equipment Since July 1, 2020 | |||
Main activity: 95.120 - Repair of communication equipment Since July 1, 2020 | |||
Main activity: 95.210 - Repair of consumer electronics Since July 1, 2020 | |||
Main activity: 95.220 - Repair of household appliances and home and garden equipment Since July 1, 2020 | |||
Main activity: 95.240 - Repair of furniture and home furnishings Since July 1, 2020 | |||
Main activity: 95.29005 - Repair of miscellaneous items (keys, locks, heels, etc.), including urgent home repairs Since July 1, 2020 |
| ||
No data included in CBE. |
(1)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). There are different versions of these codes. Activities with a NACE-BEL code (version 2003) were stopped on 31/12/2007 and automatically converted to the new NACE-BEL codes (2008 version) starting on 01/01/2008. A new 2025 version of the codes will enter into force on 01/01/2025. During the first half of the year 2025, all activities with a 2008 version of the NACE-BEL code will be phased out with 31/12/2024 as end date and automatically converted to the 2025 version of the NACE-BEL codes, starting on 01/01/2025. Up until then, activities will continue to be registered using the 2008 NACE-BEL codes.