Establishment unit data
In general | |||
Enterprise number: | 0698.771.271 | ||
Status of the entity: | Active | ||
Number of the establishment unit: | 2.284.034.848 | ||
Status of the establishment unit: | Active | ||
Start date: | January 21, 2019 | ||
Name of the establishment unit: |
Universal Team Name in French, since January 21, 2019 | ||
Address of the establishment unit: |
Brusselsestraat 17
1750 Lennik Since January 21, 2019 Ex officio striked off address since November 18, 2022(1) | ||
Phone number: | No information found in the CBE. | ||
Fax: | No information found in the CBE. | ||
Email address: | No information found in the CBE. | ||
Web address: | No information found in the CBE. | ||
| |||
Authorisations | |||
No data included in CBE. | |||
| |||
Version of Nacebel codes for activities 2008(2) | |||
Main activity: 41.20101 - Realisation of the main structure of individual houses Since January 21, 2019 | |||
Main activity: 41.20111 - Realisation of the main structure of multi-cellular buildings (apartments, etc.) Since January 21, 2019 | |||
Main activity: 41.20121 - Realisation of the structural work of buildings Since January 21, 2019 | |||
Main activity: 41.20122 - General coordination on the construction site Since January 21, 2019 | |||
Main activity: 41.20302 - Assembly of hangars, barns, silos, etc., for agricultural use Since January 21, 2019 | |||
Main activity: 43.211 - Electrotechnical installation work for buildings Since January 21, 2019 | |||
Main activity: 43.212 - Electrotechnical installation work other than buildings Since January 21, 2019 | |||
Main activity: 43.221 - Plumbing works Since January 21, 2019 | |||
Main activity: 43.222 - Installation of heating, ventilation and air conditioning Since January 21, 2019 | |||
Main activity: 43.22201 - Installation in buildings or other construction projects of: heating systems, electricity, gas and oil-fired boilers, ventilation and air conditioning material and ducting, etc. Since January 21, 2019 | |||
Main activity: 43.22202 - Installation of heating, cooling and ventilation systems (except heating) Since January 21, 2019 | |||
Main activity: 43.22211 - Installation of electrical heating systems Since January 21, 2019 | |||
Main activity: 43.29902 - Installation of signs, illuminated or not Since January 21, 2019 | |||
Main activity: 43.29911 - Installation of lifts and escalators Since January 21, 2019 | |||
Main activity: 43.310 - Plastering works Since January 21, 2019 | |||
Main activity: 43.31001 - Application in buildings or other construction projects of plaster or stucco for interiors or exteriors, including related lathing materials Since January 21, 2019 | |||
Main activity: 43.320 - Joinery works Since January 21, 2019 | |||
Main activity: 43.32001 - Assembly of exterior and interior joinery: doors, windows, staircases, fitted kitchen cupboards shop fittings, door and window frames, etc. Since January 21, 2019 | |||
Main activity: 43.32002 - Assembly of wooden or plastic mobile walls; lining walls, ceilings etc. Since January 21, 2019 | |||
Main activity: 43.32003 - Assembly of wooden or plastic garage doors, shutters, blinds, fences, gates etc. Since January 21, 2019 | |||
Main activity: 43.32004 - Assembly of wooden or plastic armoured doors and firewall doors Since January 21, 2019 | |||
Main activity: 43.32005 - Assembly of wooden or plastic greenhouses, verandas etc. Since January 21, 2019 | |||
Main activity: 43.32011 - Assembly of external and internal metal joinery: doors, windows, door and window frames, staircases, fitted kitchen cupboards, shop fittings, etc. Since January 21, 2019 | |||
Main activity: 43.32012 - Assembly of metal mobile walls; lining walls, ceilings, etc. Since January 21, 2019 | |||
Main activity: 43.32013 - Assembly of metal garage doors, shutters, blinds, fences, gates, etc. Since January 21, 2019 | |||
Main activity: 43.32014 - Assembly of metal armoured doors and fire doors Since January 21, 2019 | |||
Main activity: 43.32015 - Assembly of metal greenhouses, verandas, etc. Since January 21, 2019 | |||
Main activity: 43.32016 - Assembly of exterior and interior plastic joinery Since January 21, 2019 | |||
Main activity: 43.32021 - Installation of glass interior doors, partition walls, etc. Since January 21, 2019 | |||
Main activity: 43.32031 - Assembly of gypsum drywalls Since January 21, 2019 | |||
Main activity: 43.331 - Tiling of floors and walls Since January 21, 2019 | |||
Main activity: 43.333 - Wallpapering and wall and floor coverings in other materials Since January 21, 2019 | |||
Main activity: 43.33301 - Wallpapering Since January 21, 2019 | |||
Main activity: 43.341 - Painting of buildings Since January 21, 2019 | |||
Main activity: 43.342 - Painting of civil engineering works Since January 21, 2019 | |||
Main activity: 43.343 - Glaziery Since January 21, 2019 | |||
Main activity: 43.34301 - Fitting of glass, mirrors, etc. Since January 21, 2019 | |||
Main activity: 43.390 - Other finishing work Since January 21, 2019 | |||
Main activity: 43.39001 - Cleaning of new buildings and rehabilitation of sites after work Since January 21, 2019 | |||
Main activity: 43.39002 - Other building completion and finishing work n.e.s. Since January 21, 2019 | |||
Main activity: 43.910 - Roofing works Since January 21, 2019 | |||
Main activity: 43.91001 - Framework assembly Since January 21, 2019 | |||
Main activity: 43.91002 - Covering work using all materials Since January 21, 2019 | |||
Main activity: 43.91003 - Installation of draining elements for rainwater Since January 21, 2019 | |||
Main activity: 43.991 - Waterproofing of walls Since January 21, 2019 | |||
Main activity: 43.99101 - Waterproofing of roofs and roof terraces Since January 21, 2019 | |||
Main activity: 43.99111 - Treatment of walls with water repellent products Since January 21, 2019 | |||
Main activity: 43.992 - Restoration of façades Since January 21, 2019 | |||
Main activity: 43.993 - Construction of decorative fireplaces and open fireplaces Since January 21, 2019 | |||
Main activity: 43.994 - Masonry and repointing Since January 21, 2019 | |||
Main activity: 43.99401 - Masonry Since January 21, 2019 | |||
Main activity: 43.996 - Screed laying Since January 21, 2019 | |||
Main activity: 43.99902 - Formwork and rebar work Since January 21, 2019 | |||
Main activity: 43.99904 - Installation of steel structure elements not manufactured by the unit carrying out the work Since January 21, 2019 | |||
Main activity: 43.99905 - Execution of lifting work for third parties Since January 21, 2019 | |||
Main activity: 43.99906 - Assembly and disassembly of scaffolding and work platforms Since January 21, 2019 |
|
(1)When an address is ex officio striked off, this indicates that the entity, the establishment unit or the branch is not longer situated at the registered address.
(2)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). There are different versions of these codes. Activities with a NACE-BEL code (version 2003) were stopped on 31/12/2007 and automatically converted to the new NACE-BEL codes (2008 version) starting on 01/01/2008. A new 2025 version of the codes will enter into force on 01/01/2025. During the first half of the year 2025, all activities with a 2008 version of the NACE-BEL code will be phased out with 31/12/2024 as end date and automatically converted to the 2025 version of the NACE-BEL codes, starting on 01/01/2025. Up until then, activities will continue to be registered using the 2008 NACE-BEL codes.