Establishment unit data
In general | |||||
Enterprise number: | 0713.683.042 | ||||
Status of the entity: | Active | ||||
Number of the establishment unit: | 2.287.310.280 | ||||
Status of the establishment unit: | Active | ||||
Start date: | November 19, 2018 | ||||
Name of the establishment unit: |
OGPAR Name in French, since November 19, 2018 | ||||
Address of the establishment unit: |
Imperiastraat 8
box 1
1930 Zaventem Since November 9, 2021 Ex officio striked off address since September 15, 2023(1) | ||||
Phone number: |
| ||||
Fax: | No information found in the CBE. | ||||
Email address: | No information found in the CBE. | ||||
Web address: | No information found in the CBE. | ||||
| |||||
Authorisations | |||||
No data included in CBE. | |||||
Licences registered with the Federal Agency for the Safety of the Food Chain (FASFC) Click here | |||||
| |||||
Version of Nacebel codes for activities 2025(2) | |||||
Main activity: 43.12005
- Clearing of building sites Since January 1, 2025 | |||||
Main activity: 43.222
- Installation of heating, ventilating, air conditioning, refrigeration installations powered by electricity Since January 1, 2025 | |||||
Main activity: 43.230
- Installation of insulation Since January 1, 2025 | |||||
Main activity: 43.240
- Other construction installation Since January 1, 2025 | |||||
Main activity: 43.41011
- Waterproofing of roofs and roof terraces Since January 1, 2025 | |||||
Main activity: 43.91002
- Execution of repointing Since January 1, 2025 | |||||
Main activity: 43.35001
- Cleaning of new buildings and rehabilitation of sites after work Since January 1, 2025 | |||||
Main activity: 43.422
- Laying of screeds Since January 1, 2025 | |||||
Main activity: 43.24003
- Other installation works nes, including installation of accessories Since January 1, 2025 | |||||
Main activity: 43.342
- Painting of civil engineering works Since January 1, 2025 | |||||
Main activity: 43.130
- Test drilling and boring Since January 1, 2025 | |||||
Main activity: 43.12001
- Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc Since January 1, 2025 | |||||
Main activity: 43.110
- Demolition Since January 1, 2025 | |||||
Main activity: 43.910
- Masonry and bricklaying activities Since January 1, 2025 | |||||
Main activity: 43.34202
- Painting of interior surfaces of ships and boats by non-specialised units Since January 1, 2025 | |||||
Main activity: 43.99003
- Assembly and disassembly of scaffolding and work platforms Since January 1, 2025 | |||||
Main activity: 43.24006
- Installation of building aerials and lightning rods Since January 1, 2025 | |||||
Main activity: 43.24004
- General installation work Since January 1, 2025 | |||||
Main activity: 43.23002
- Insulation work for heating or cooling pipes Since January 1, 2025 | |||||
Main activity: 43.24001
- Installation of blinds and awnings Since January 1, 2025 | |||||
Main activity: 81.22011
- Steam cleaning, sand blasting and similar activities for building exteriors Since January 1, 2025 | |||||
Main activity: 43.23001
- Implementation in buildings or other construction projects of: thermal insulation, acoustic and anti vibration insulation Since January 1, 2025 | |||||
Main activity: 43.99002
- Execution of lifting work for third parties Since January 1, 2025 | |||||
Main activity: 43.343
- Glazing Since January 1, 2025 | |||||
Main activity: 43.320
- Joinery installation Since January 1, 2025 | |||||
Main activity: 43.34301
- Fitting of glass, mirrors, etc Since January 1, 2025 | |||||
Main activity: 43.32011
- Assembly of exterior and interior plastic joinery Since January 1, 2025 | |||||
Main activity: 43.91001
- Masonry Since January 1, 2025 | |||||
Main activity: 43.341
- Painting of buildings Since January 1, 2025 | |||||
Main activity: 43.35002
- Other building completion and finishing work nes Since January 1, 2025 | |||||
Main activity: 43.32013
- Assembly of gypsum drywalls Since January 1, 2025 | |||||
Main activity: 43.21102
- Installation of telecommunication systems and computer facilities Since January 1, 2025 | |||||
Main activity: 43.23003
- Insulation work for cold storage or refrigerated warehouses Since January 1, 2025 | |||||
Main activity: 43.350
- Other building completion and finishing Since January 1, 2025 | |||||
Main activity: 42.22002
- Construction of telecommunication lines and networks Since January 1, 2025 | |||||
Main activity: 81.210
- General cleaning of buildings Since January 1, 2025 | |||||
Main activity: 43.42903
- Installation of steel structure elements not manufactured by the unit carrying out the work Since January 1, 2025 | |||||
Main activity: 81.220
- Other building and industrial cleaning activities Since January 1, 2025 | |||||
Show the NACE-BEL codes activities version 2008. |
|
(1)When an address is ex officio striked off, this indicates that the entity, the establishment unit or the branch is not longer situated at the registered address.
(2)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). Activities registered of the NACE-BEL codes (version 2003) were stopped on 31/12/2007, automatically converted to the NACE-BEL codes (version 2008) and registered with a start date of 01/01/2008. This was a mere administrative conversion and no modification of the activity itself.
(3)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). Following a conversion of activities with a NACE-BEL code (2003 version) to NACE-BEL codes (2008 version), the start date of activities (2008 version) is 1/01/2008. Activities with a NACE-BEL code (2008 version) were then stopped on 31/12/2024 and automatically converted to NACE-BEL codes (2025 version). These were mere administrative conversion and no modification of the activity itself. The 2003 activities can be accessed by clicking on the link : "Show the NACE-BEL codes activities version 2003".