Attention! This establishment unit has been stopped. Therefore, the shown data reflect the situation at the moment of cessation of the establishment unit.
Establishment unit data
In general | |||
Enterprise number: | 0717.738.137 | ||
Status of the entity: | Stopped | ||
Number of the establishment unit: | 2.284.119.079 | ||
Status of the establishment unit: | Stopped Since September 22, 2021 | ||
Start date: | February 1, 2019 | ||
Name of the establishment unit: | No information found in the CBE. | ||
Address of the establishment unit: |
Willem Eekelersstraat 25
2020 Antwerpen Since February 1, 2019 | ||
Phone number: | No information found in the CBE. | ||
Fax: | No information found in the CBE. | ||
Email address: | No information found in the CBE. | ||
Web address: | No information found in the CBE. | ||
| |||
Authorisations | |||
No data included in CBE. | |||
| |||
Version of Nacebel codes for activities 2008(1) | |||
Main activity: 23.20001 - Manufacture of refractory mortars, concretes, etc. Since June 2, 2020 | |||
Main activity: 23.61001 - Manufacture of precast concrete used in construction: tiles, flagstones, bricks, hollow slabs, sheets, panels, pipes, pillars, etc. Since June 2, 2020 | |||
Main activity: 23.63001 - Manufacturing concrete and mortar ready for use Since June 2, 2020 | |||
Main activity: 41.201 - General construction of residential buildings Since February 1, 2019 | |||
Main activity: 41.202 - General construction of office buildings Since February 1, 2019 | |||
Main activity: 41.203 - General construction of other non-residential buildings Since February 1, 2019 | |||
Main activity: 42.212 - Construction of drainage systems for waste water Since June 2, 2020 | |||
Main activity: 43.11001 - Demolition of buildings and other constructions Since June 2, 2020 | |||
Main activity: 43.120 - Site preparation works Since February 1, 2019 | |||
Main activity: 43.12001 - Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc. Since June 2, 2020 | |||
Main activity: 43.12003 - Lowering of the water table and drainage of construction sites Since June 2, 2020 | |||
Main activity: 43.12011 - Clearing of building sites Since February 1, 2019 | |||
Main activity: 43.130 - Test drilling and surveys Since June 2, 2020 | |||
Main activity: 43.291 - Insulation works Since June 2, 2020 | |||
Main activity: 43.310 - Plastering works Since February 1, 2019 | |||
Main activity: 43.320 - Joinery works Since June 2, 2020 | |||
Main activity: 43.32012 - Assembly of metal mobile walls; lining walls, ceilings, etc. Since February 1, 2019 | |||
Main activity: 43.32031 - Assembly of gypsum drywalls Since February 1, 2019 | |||
Main activity: 43.99301 - Construction of decorative fireplaces and open fireplaces Since February 1, 2019 | |||
Main activity: 43.99402 - Execution of repointing Since February 1, 2019 | |||
Main activity: 43.99601 - Screed laying Since February 1, 2019 |
|
(1)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). There are different versions of these codes. Activities with a NACE-BEL code (version 2003) were stopped on 31/12/2007 and automatically converted to the new NACE-BEL codes (2008 version) starting on 01/01/2008. A new 2025 version of the codes will enter into force on 01/01/2025. During the first half of the year 2025, all activities with a 2008 version of the NACE-BEL code will be phased out with 31/12/2024 as end date and automatically converted to the 2025 version of the NACE-BEL codes, starting on 01/01/2025. Up until then, activities will continue to be registered using the 2008 NACE-BEL codes.