shadow
The English version of the Public Search application constitutes an unofficial English translation and is provided for information purposes only.
No legal rights can therefore be derived from this translation. For the official application, please consult the Dutch, French or German versions of the Public Search application.


Attention! This establishment unit has been stopped. Therefore, the shown data reflect the situation at the moment of cessation of the establishment unit.

Establishment unit data

In general

Enterprise number:0719.814.333
Status of the entity:Stopped
Number of the establishment unit:2.285.354.147
Status of the establishment unit:Stopped
Since June 11, 2024
Start date:February 5, 2019
Name of the establishment unit: B.A.S. CONSTRUCT
Name in French, since February 5, 2019
Address of the establishment unit:
Chaussée de Bruxelles   207
6042   Charleroi
Since February 5, 2019
Phone number:No information found in the CBE.
Fax:No information found in the CBE.
Email address:No information found in the CBE.
Web address:No information found in the CBE.
 
 

Authorisations

No data included in CBE.
 
 

Version of Nacebel codes for activities 2008(1)

Main activity: 25.501 - Metal forging
Since May 21, 2019
Main activity: 28.25002 - Manufacture of refrigerated counters
Since May 21, 2019
Main activity: 41.20101 - Realisation of the main structure of individual houses
Since May 21, 2019
Main activity: 41.20111 - Realisation of the main structure of multi-cellular buildings (apartments, etc.)
Since May 21, 2019
Main activity: 41.20121 - Realisation of the structural work of buildings
Since May 21, 2019
Main activity: 41.202 - General construction of office buildings
Since May 21, 2019
Main activity: 41.203 - General construction of other non-residential buildings
Since May 21, 2019
Main activity: 42.21901 - Drilling and water well construction, shaft sinking
Since February 5, 2019
Main activity: 43.110 - Demolition works
Since May 21, 2019
Main activity: 43.120 - Site preparation works
Since February 5, 2019
Main activity: 43.130 - Test drilling and surveys
Since February 5, 2019
Main activity: 43.291 - Insulation works
Since February 5, 2019
Main activity: 43.29903 - Other installation works n.e.s., including installation of accessories
Since February 5, 2019
Main activity: 43.32001 - Assembly of exterior and interior joinery: doors, windows, staircases, fitted kitchen cupboards shop fittings, door and window frames, etc.
Since May 21, 2019
Main activity: 43.32002 - Assembly of wooden or plastic mobile walls; lining walls, ceilings etc.
Since May 21, 2019
Main activity: 43.32011 - Assembly of external and internal metal joinery: doors, windows, door and window frames, staircases, fitted kitchen cupboards, shop fittings, etc.
Since May 21, 2019
Main activity: 43.32012 - Assembly of metal mobile walls; lining walls, ceilings, etc.
Since May 21, 2019
Main activity: 43.32013 - Assembly of metal garage doors, shutters, blinds, fences, gates, etc.
Since May 21, 2019
Main activity: 43.32016 - Assembly of exterior and interior plastic joinery
Since May 21, 2019
Main activity: 43.332 - Fitting of wood coverings for floors and walls
Since May 21, 2019
Main activity: 43.390 - Other finishing work
Since February 5, 2019
Main activity: 43.910 - Roofing works
Since May 21, 2019
Main activity: 43.991 - Waterproofing of walls
Since May 21, 2019
Main activity: 43.992 - Restoration of façades
Since February 5, 2019
Main activity: 43.993 - Construction of decorative fireplaces and open fireplaces
Since February 5, 2019
Main activity: 43.994 - Masonry and repointing
Since May 21, 2019
Main activity: 43.99402 - Execution of repointing
Since February 5, 2019
Main activity: 43.99901 - Establishment of foundations, including pile driving
Since February 5, 2019
Main activity: 43.99902 - Formwork and rebar work
Since May 21, 2019
Main activity: 43.99903 - Construction of chimneys and industrial ovens
Since May 21, 2019
Main activity: 43.99904 - Installation of steel structure elements not manufactured by the unit carrying out the work
Since February 5, 2019
Main activity: 43.99906 - Assembly and disassembly of scaffolding and work platforms
Since February 5, 2019
Main activity: 43.99907 - Construction of cold rooms, vaults, etc.
Since May 21, 2019
Main activity: 71.11302 - Design of gardens, parks, etc.
Since February 5, 2019
Main activity: 81.30002 - Creation and maintenance of gardens, parks and green spaces for sports facilities
Since February 5, 2019
 
 

(1)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). There are different versions of these codes. Activities with a NACE-BEL code (version 2003) were stopped on 31/12/2007 and automatically converted to the new NACE-BEL codes (2008 version) starting on 01/01/2008. A new 2025 version of the codes will enter into force on 01/01/2025. During the first half of the year 2025, all activities with a 2008 version of the NACE-BEL code will be phased out with 31/12/2024 as end date and automatically converted to the 2025 version of the NACE-BEL codes, starting on 01/01/2025. Up until then, activities will continue to be registered using the 2008 NACE-BEL codes.