Establishment unit data
In general | |||
Enterprise number: | 0720.522.829 | ||
Status of the entity: | Active | ||
Number of the establishment unit: | 2.285.868.940 | ||
Status of the establishment unit: | Active | ||
Start date: | February 8, 2019 | ||
Name of the establishment unit: | No information found in the CBE. | ||
Address of the establishment unit: |
Rue du Tultay 6
4140 Sprimont Since February 8, 2019 | ||
Phone number: | No information found in the CBE. | ||
Fax: | No information found in the CBE. | ||
Email address: | No information found in the CBE. | ||
Web address: | No information found in the CBE. | ||
| |||
Authorisations | |||
No data included in CBE. | |||
| |||
Version of Nacebel codes for activities 2008(1) | |||
Main activity: 25.30003 - Design, construction and installation of piping systems, comprising further processing of tubes generally to make pipes or pressurized networks Since February 8, 2019 | |||
Main activity: 42.110 - Construction of roads and motorways Since February 8, 2019 | |||
Main activity: 42.11001 - Construction of motorways, roads, streets, pavements and other vehicular and pedestrian roads (including the installation of crash barriers) Since February 8, 2019 | |||
Main activity: 42.11003 - Paint marking of pavements and lay-bys or car parks Since February 8, 2019 | |||
Main activity: 42.13002 - Construction of road and rail tunnels and other underground passages Since February 8, 2019 | |||
Main activity: 42.21911 - Construction of water supply, distribution and drainage networks Since February 8, 2019 | |||
Main activity: 42.21912 - Construction of networks to transport gas, petroleum products, etc. Since February 8, 2019 | |||
Main activity: 42.91102 - Cleaning of rivers, ditches, etc. Since February 8, 2019 | |||
Main activity: 42.91905 - Construction of settling ponds and other structures for waste water treatment Since February 8, 2019 | |||
Main activity: 43.120 - Site preparation works Since February 8, 2019 | |||
Main activity: 43.12001 - Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc. Since February 8, 2019 | |||
Main activity: 43.12003 - Lowering of the water table and drainage of construction sites Since February 8, 2019 | |||
Main activity: 43.12004 - Drainage of agricultural or forestry land Since February 8, 2019 | |||
Main activity: 43.130 - Test drilling and surveys Since February 8, 2019 | |||
Main activity: 43.13001 - Test surveys, test drilling and core sampling for construction as well as for geophysical or geological studies, or similar Since February 8, 2019 | |||
Main activity: 43.13002 - Execution of horizontal drilling for cable glands or ducts Since February 8, 2019 | |||
Main activity: 81.30002 - Creation and maintenance of gardens, parks and green spaces for sports facilities Since February 8, 2019 | |||
Additional activity: 42.22002 - Construction of telecommunication lines and networks Since February 8, 2019 | |||
Additional activity: 42.99012 - Development and consolidation of rural areas Since February 8, 2019 | |||
| |||
Version of the Nacebel codes for the NSSO-activities 2008(1) | |||
Main activity: 43.120 - Site preparation works Since April 1, 2019 |
|
(1)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). There are different versions of these codes. Activities with a NACE-BEL code (version 2003) were stopped on 31/12/2007 and automatically converted to the new NACE-BEL codes (2008 version) starting on 01/01/2008. A new 2025 version of the codes will enter into force on 01/01/2025. During the first half of the year 2025, all activities with a 2008 version of the NACE-BEL code will be phased out with 31/12/2024 as end date and automatically converted to the 2025 version of the NACE-BEL codes, starting on 01/01/2025. Up until then, activities will continue to be registered using the 2008 NACE-BEL codes.