Establishment unit data
In general | |||
Enterprise number: | 0723.834.487 | ||
Status of the entity: | Active | ||
Number of the establishment unit: | 2.288.215.845 | ||
Status of the establishment unit: | Active | ||
Start date: | March 29, 2019 | ||
Name of the establishment unit: |
RM CARRIERO Name in French, since March 29, 2019 | ||
Address of the establishment unit: |
Rue Paul Pastur(CO) 113A
6180 Courcelles Since January 29, 2024 | ||
Phone number: | No information found in the CBE. | ||
Fax: | No information found in the CBE. | ||
Email address: | No information found in the CBE. | ||
Web address: | No information found in the CBE. | ||
| |||
Authorisations | |||
No data included in CBE. | |||
| |||
Version of Nacebel codes for activities 2008(1) | |||
Main activity: 43.120 - Site preparation works Since March 29, 2019 | |||
Main activity: 43.130 - Test drilling and surveys Since March 29, 2019 | |||
Main activity: 43.291 - Insulation works Since March 29, 2019 | |||
Main activity: 43.29101 - Implementation in buildings or other construction projects of: thermal insulation, acoustic and anti vibration insulation Since March 29, 2019 | |||
Main activity: 43.29102 - Insulation work for heating or cooling pipes Since March 29, 2019 | |||
Main activity: 43.29103 - Insulation work for cold storage or refrigerated warehouses Since March 29, 2019 | |||
Main activity: 43.32001 - Assembly of exterior and interior joinery: doors, windows, staircases, fitted kitchen cupboards shop fittings, door and window frames, etc. Since March 29, 2019 | |||
Main activity: 43.32002 - Assembly of wooden or plastic mobile walls; lining walls, ceilings etc. Since March 29, 2019 | |||
Main activity: 43.32003 - Assembly of wooden or plastic garage doors, shutters, blinds, fences, gates etc. Since March 29, 2019 | |||
Main activity: 43.32004 - Assembly of wooden or plastic armoured doors and firewall doors Since March 29, 2019 | |||
Main activity: 43.32005 - Assembly of wooden or plastic greenhouses, verandas etc. Since March 29, 2019 | |||
Main activity: 43.32011 - Assembly of external and internal metal joinery: doors, windows, door and window frames, staircases, fitted kitchen cupboards, shop fittings, etc. Since March 29, 2019 | |||
Main activity: 43.32012 - Assembly of metal mobile walls; lining walls, ceilings, etc. Since March 29, 2019 | |||
Main activity: 43.32013 - Assembly of metal garage doors, shutters, blinds, fences, gates, etc. Since March 29, 2019 | |||
Main activity: 43.32014 - Assembly of metal armoured doors and fire doors Since March 29, 2019 | |||
Main activity: 43.32015 - Assembly of metal greenhouses, verandas, etc. Since March 29, 2019 | |||
Main activity: 43.32016 - Assembly of exterior and interior plastic joinery Since March 29, 2019 | |||
Main activity: 43.32021 - Installation of glass interior doors, partition walls, etc. Since March 29, 2019 | |||
Main activity: 43.331 - Tiling of floors and walls Since March 29, 2019 | |||
Main activity: 43.33101 - Fitting in buildings or other construction projects of: wall coverings or ceramic, concrete or stone tiles; granite flooring and wall coverings, etc. Since March 29, 2019 | |||
Main activity: 43.332 - Fitting of wood coverings for floors and walls Since March 29, 2019 | |||
Main activity: 43.33201 - Fitting in buildings or other construction projects of: parquet and other wood floors, wooden wall coverings Since March 29, 2019 | |||
Main activity: 43.343 - Glaziery Since March 29, 2019 | |||
Main activity: 43.34301 - Fitting of glass, mirrors, etc. Since March 29, 2019 | |||
Main activity: 43.390 - Other finishing work Since March 29, 2019 | |||
Main activity: 43.39001 - Cleaning of new buildings and rehabilitation of sites after work Since March 29, 2019 | |||
Main activity: 43.39002 - Other building completion and finishing work n.e.s. Since March 29, 2019 | |||
Main activity: 43.910 - Roofing works Since March 29, 2019 | |||
Main activity: 43.91001 - Framework assembly Since March 29, 2019 | |||
Main activity: 43.91002 - Covering work using all materials Since March 29, 2019 | |||
Main activity: 43.91003 - Installation of draining elements for rainwater Since March 29, 2019 | |||
Main activity: 43.991 - Waterproofing of walls Since March 29, 2019 | |||
Main activity: 43.99101 - Waterproofing of roofs and roof terraces Since March 29, 2019 | |||
Main activity: 43.99111 - Treatment of walls with water repellent products Since March 29, 2019 | |||
Main activity: 43.992 - Restoration of façades Since March 29, 2019 | |||
Main activity: 43.99201 - Steam cleaning, sand blasting and similar activities for building exteriors Since March 29, 2019 | |||
Main activity: 43.99402 - Execution of repointing Since March 29, 2019 | |||
Main activity: 82.990 - Other business support service activities n.e.c. Since March 29, 2019 | |||
Additional activity: 43.32031 - Assembly of gypsum drywalls Since March 29, 2019 | |||
Additional activity: 43.996 - Screed laying Since March 29, 2019 | |||
| |||
Version of the Nacebel codes for the NSSO-activities 2008(1) | |||
Main activity: 43.910 - Roofing works Since June 2, 2020 |
|
(1)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). There are different versions of these codes. Activities with a NACE-BEL code (version 2003) were stopped on 31/12/2007 and automatically converted to the new NACE-BEL codes (2008 version) starting on 01/01/2008. A new 2025 version of the codes will enter into force on 01/01/2025. During the first half of the year 2025, all activities with a 2008 version of the NACE-BEL code will be phased out with 31/12/2024 as end date and automatically converted to the 2025 version of the NACE-BEL codes, starting on 01/01/2025. Up until then, activities will continue to be registered using the 2008 NACE-BEL codes.