Attention! This establishment unit has been stopped. Therefore, the shown data reflect the situation at the moment of cessation of the establishment unit.
Establishment unit data
In general | |||
Enterprise number: | 0730.704.661 | ||
Status of the entity: | Stopped | ||
Number of the establishment unit: | 2.291.091.795 | ||
Status of the establishment unit: | Stopped Since September 30, 2021 | ||
Start date: | July 15, 2019 | ||
Name of the establishment unit: |
BZ Chassis Name in French, since July 15, 2019 | ||
Address of the establishment unit: |
Rue des Châssis à Molettes 18
6030 Charleroi Since July 15, 2019 | ||
Phone number: | No information found in the CBE. | ||
Fax: | No information found in the CBE. | ||
Email address: | No information found in the CBE. | ||
Web address: | No information found in the CBE. | ||
| |||
Authorisations | |||
No data included in CBE. | |||
| |||
Version of Nacebel codes for activities 2008(1) | |||
Main activity: 43.12001 - Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc. Since July 15, 2019 | |||
Main activity: 43.12002 - Site preparation for mining: overburden removal and other development and preparation of land and mining sites Since July 15, 2019 | |||
Main activity: 43.12003 - Lowering of the water table and drainage of construction sites Since July 15, 2019 | |||
Main activity: 43.12004 - Drainage of agricultural or forestry land Since July 15, 2019 | |||
Main activity: 43.12011 - Clearing of building sites Since July 15, 2019 | |||
Main activity: 43.13001 - Test surveys, test drilling and core sampling for construction as well as for geophysical or geological studies, or similar Since July 15, 2019 | |||
Main activity: 43.13002 - Execution of horizontal drilling for cable glands or ducts Since July 15, 2019 | |||
Main activity: 43.291 - Insulation works Since July 15, 2019 | |||
Main activity: 43.29901 - Installation of blinds and awnings Since July 15, 2019 | |||
Main activity: 43.29903 - Other installation works n.e.s., including installation of accessories Since July 15, 2019 | |||
Main activity: 43.29904 - General installation work Since July 15, 2019 | |||
Main activity: 43.32001 - Assembly of exterior and interior joinery: doors, windows, staircases, fitted kitchen cupboards shop fittings, door and window frames, etc. Since July 15, 2019 | |||
Main activity: 43.32002 - Assembly of wooden or plastic mobile walls; lining walls, ceilings etc. Since July 15, 2019 | |||
Main activity: 43.32003 - Assembly of wooden or plastic garage doors, shutters, blinds, fences, gates etc. Since July 15, 2019 | |||
Main activity: 43.32004 - Assembly of wooden or plastic armoured doors and firewall doors Since July 15, 2019 | |||
Main activity: 43.32005 - Assembly of wooden or plastic greenhouses, verandas etc. Since July 15, 2019 | |||
Main activity: 43.32011 - Assembly of external and internal metal joinery: doors, windows, door and window frames, staircases, fitted kitchen cupboards, shop fittings, etc. Since July 15, 2019 | |||
Main activity: 43.32012 - Assembly of metal mobile walls; lining walls, ceilings, etc. Since July 15, 2019 | |||
Main activity: 43.32013 - Assembly of metal garage doors, shutters, blinds, fences, gates, etc. Since July 15, 2019 | |||
Main activity: 43.32014 - Assembly of metal armoured doors and fire doors Since July 15, 2019 | |||
Main activity: 43.32015 - Assembly of metal greenhouses, verandas, etc. Since July 15, 2019 | |||
Main activity: 43.32016 - Assembly of exterior and interior plastic joinery Since July 15, 2019 | |||
Main activity: 43.32021 - Installation of glass interior doors, partition walls, etc. Since July 15, 2019 | |||
Main activity: 43.34301 - Fitting of glass, mirrors, etc. Since July 15, 2019 | |||
Main activity: 43.39001 - Cleaning of new buildings and rehabilitation of sites after work Since July 15, 2019 | |||
Main activity: 43.39002 - Other building completion and finishing work n.e.s. Since July 15, 2019 | |||
Main activity: 43.99201 - Steam cleaning, sand blasting and similar activities for building exteriors Since July 15, 2019 | |||
Main activity: 43.99402 - Execution of repointing Since July 15, 2019 | |||
Main activity: 43.99901 - Establishment of foundations, including pile driving Since July 15, 2019 | |||
Main activity: 43.99904 - Installation of steel structure elements not manufactured by the unit carrying out the work Since July 15, 2019 | |||
Main activity: 43.99905 - Execution of lifting work for third parties Since July 15, 2019 | |||
Main activity: 43.99906 - Assembly and disassembly of scaffolding and work platforms Since July 15, 2019 | |||
Main activity: 71.11302 - Design of gardens, parks, etc. Since July 15, 2019 | |||
Main activity: 81.300 - Landscape service activities Since July 15, 2019 | |||
Main activity: 81.30001 - Pruning of trees and hedges Since July 15, 2019 | |||
Main activity: 81.30002 - Creation and maintenance of gardens, parks and green spaces for sports facilities Since July 15, 2019 | |||
Additional activity: 43.32031 - Assembly of gypsum drywalls Since July 15, 2019 | |||
| |||
Version of the Nacebel codes for the NSSO-activities 2008(1) | |||
Main activity: 43.320 - Joinery works Since February 8, 2021 |
|
(1)The EC-classification of the Nacebel codes has changed on 1/1/2008. Both the Nacebel codification of 2003 and 2008 are available in Public Search. The 2003 codes were valid until 31/12/2007. On 1/1/2008, the new codification became valid. This was a mere administrative conversion : no activities of the entity or establishment unit have thus been changed.