shadow
The English version of the Public Search application constitutes an unofficial English translation and is provided for information purposes only.
No legal rights can therefore be derived from this translation. For the official application, please consult the Dutch, French or German versions of the Public Search application.


Establishment unit data

In general

Enterprise number:0740.546.104
Status of the entity:Active
Number of the establishment unit:2.297.742.433
Status of the establishment unit:Active
Start date:December 27, 2019
Name of the establishment unit: B&B GRONDWERKEN
Name in Dutch, since December 27, 2019
Address of the establishment unit:
Grote Baan   128
3454   Geetbets
Since December 27, 2019
Phone number:
0472662371 Since December 27, 2020
Fax:No information found in the CBE.
Email address:
info@bbgrondwerken.beSince December 27, 2020
Web address:No information found in the CBE.
 
 

Authorisations

Licences registered with the Federal Agency for the Safety of the Food Chain (FASFC)  Click here
 
 

Version of Nacebel codes for activities 2008(1)

Main activity: 01.11004 - Production of cereal seeds
Since December 27, 2019
Main activity: 01.11005 - Crops n.e.c.
Since December 27, 2019
Main activity: 02.100 - Sylviculture and other forestry activities
Since December 27, 2019
Main activity: 25.110 - Manufacture of metal structures and parts of structures
Since December 27, 2019
Main activity: 25.620 - Machining
Since December 27, 2019
Main activity: 42.110 - Construction of roads and motorways
Since December 27, 2019
Main activity: 42.11001 - Construction of motorways, roads, streets, pavements and other vehicular and pedestrian roads (including the installation of crash barriers)
Since December 27, 2019
Main activity: 42.212 - Construction of drainage systems for waste water
Since December 27, 2019
Main activity: 42.21901 - Drilling and water well construction, shaft sinking
Since December 27, 2019
Main activity: 42.21911 - Construction of water supply, distribution and drainage networks
Since December 27, 2019
Main activity: 42.21912 - Construction of networks to transport gas, petroleum products, etc.
Since December 27, 2019
Main activity: 42.22002 - Construction of telecommunication lines and networks
Since December 27, 2019
Main activity: 42.911 - Dredging works
Since December 27, 2019
Main activity: 42.91102 - Cleaning of rivers, ditches, etc.
Since December 27, 2019
Main activity: 43.11001 - Demolition of buildings and other constructions
Since December 27, 2019
Main activity: 43.120 - Site preparation works
Since December 27, 2019
Main activity: 43.12001 - Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc.
Since December 27, 2019
Main activity: 43.12002 - Site preparation for mining: overburden removal and other development and preparation of land and mining sites
Since December 27, 2019
Main activity: 43.12003 - Lowering of the water table and drainage of construction sites
Since December 27, 2019
Main activity: 43.12004 - Drainage of agricultural or forestry land
Since December 27, 2019
Main activity: 43.12011 - Clearing of building sites
Since December 27, 2019
Main activity: 43.130 - Test drilling and surveys
Since December 27, 2019
Main activity: 43.13001 - Test surveys, test drilling and core sampling for construction as well as for geophysical or geological studies, or similar
Since December 27, 2019
Main activity: 43.13002 - Execution of horizontal drilling for cable glands or ducts
Since December 27, 2019
Main activity: 43.21101 - Installation of electrical wiring and fittings
Since December 27, 2019
Main activity: 43.21102 - Installation of telecommunication systems and computer facilities
Since December 27, 2019
Main activity: 43.291 - Insulation works
Since December 27, 2019
Main activity: 43.32001 - Assembly of exterior and interior joinery: doors, windows, staircases, fitted kitchen cupboards shop fittings, door and window frames, etc.
Since December 27, 2019
Main activity: 43.32003 - Assembly of wooden or plastic garage doors, shutters, blinds, fences, gates etc.
Since December 27, 2019
Main activity: 43.32011 - Assembly of external and internal metal joinery: doors, windows, door and window frames, staircases, fitted kitchen cupboards, shop fittings, etc.
Since December 27, 2019
Main activity: 43.32013 - Assembly of metal garage doors, shutters, blinds, fences, gates, etc.
Since December 27, 2019
Main activity: 43.390 - Other finishing work
Since December 27, 2019
Main activity: 43.39001 - Cleaning of new buildings and rehabilitation of sites after work
Since December 27, 2019
Main activity: 43.39002 - Other building completion and finishing work n.e.s.
Since December 27, 2019
Main activity: 43.99201 - Steam cleaning, sand blasting and similar activities for building exteriors
Since December 27, 2019
Main activity: 43.999 - Other specialised construction activities
Since December 27, 2019
Main activity: 43.99901 - Establishment of foundations, including pile driving
Since December 27, 2019
Main activity: 43.99904 - Installation of steel structure elements not manufactured by the unit carrying out the work
Since December 27, 2019
Main activity: 81.220 - Other building and industrial cleaning activities
Since December 27, 2019
Main activity: 81.300 - Landscape service activities
Since December 27, 2019
Main activity: 81.30001 - Pruning of trees and hedges
Since December 27, 2019
Main activity: 81.30002 - Creation and maintenance of gardens, parks and green spaces for sports facilities
Since December 27, 2019
 
 

Version of the Nacebel codes for the NSSO-activities 2008(1)

Main activity: 43.120 - Site preparation works
Since February 8, 2021
 
 
No data included in CBE.

(1)The EC-classification of the Nacebel codes has changed on 1/1/2008. Both the Nacebel codification of 2003 and 2008 are available in Public Search. The 2003 codes were valid until 31/12/2007. On 1/1/2008, the new codification became valid. This was a mere administrative conversion : no activities of the entity or establishment unit have thus been changed.