shadow
The English version of the Public Search application constitutes an unofficial English translation and is provided for information purposes only.
No legal rights can therefore be derived from this translation. For the official application, please consult the Dutch, French or German versions of the Public Search application.


Establishment unit data

In general

Enterprise number:0745.566.744
Status of the entity:Active
Number of the establishment unit:2.303.105.345
Status of the establishment unit:Active
Start date:May 1, 2020
Name of the establishment unit: HM Concept
Name in French, since May 1, 2020
Address of the establishment unit:
Viville, rue de Metzert   19
6700   Arlon
Since May 1, 2020
Phone number:No information found in the CBE.
Fax:No information found in the CBE.
Email address:No information found in the CBE.
Web address:No information found in the CBE.
 
 

Authorisations

No data included in CBE.
 
 

Version of Nacebel codes for activities 2008(1)

Main activity: 16.210 - Manufacture of veneer sheets and wood-based panels
Since May 1, 2020
Main activity: 16.230 - Manufacture of other builders' carpentry and joinery
Since May 1, 2020
Main activity: 25.11001 - Manufacture of metal frameworks or skeletons for construction
Since May 1, 2020
Main activity: 25.11003 - Manufacture of prefabricated buildings mainly of metal: site huts, modular exhibition elements, telephone booths, etc ..
Since May 1, 2020
Main activity: 33.12011 - Mechanical maintenance and repairs for third parties
Since May 1, 2020
Main activity: 41.20101 - Realisation of the main structure of individual houses
Since May 1, 2020
Main activity: 41.203 - General construction of other non-residential buildings
Since May 1, 2020
Main activity: 41.20302 - Assembly of hangars, barns, silos, etc., for agricultural use
Since May 1, 2020
Main activity: 42.11001 - Construction of motorways, roads, streets, pavements and other vehicular and pedestrian roads (including the installation of crash barriers)
Since May 1, 2020
Main activity: 42.212 - Construction of drainage systems for waste water
Since May 1, 2020
Main activity: 42.21901 - Drilling and water well construction, shaft sinking
Since May 1, 2020
Main activity: 42.22002 - Construction of telecommunication lines and networks
Since May 1, 2020
Main activity: 43.110 - Demolition works
Since May 1, 2020
Main activity: 43.120 - Site preparation works
Since May 1, 2020
Main activity: 43.12001 - Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc.
Since May 1, 2020
Main activity: 43.12011 - Clearing of building sites
Since May 1, 2020
Main activity: 43.130 - Test drilling and surveys
Since May 1, 2020
Main activity: 43.211 - Electrotechnical installation work for buildings
Since May 1, 2020
Main activity: 43.21102 - Installation of telecommunication systems and computer facilities
Since May 1, 2020
Main activity: 43.291 - Insulation works
Since May 1, 2020
Main activity: 43.29101 - Implementation in buildings or other construction projects of: thermal insulation, acoustic and anti vibration insulation
Since May 1, 2020
Main activity: 43.29102 - Insulation work for heating or cooling pipes
Since May 1, 2020
Main activity: 43.29103 - Insulation work for cold storage or refrigerated warehouses
Since May 1, 2020
Main activity: 43.29901 - Installation of blinds and awnings
Since May 1, 2020
Main activity: 43.29912 - Installation of building aerials and lightning rods
Since May 1, 2020
Main activity: 43.320 - Joinery works
Since May 1, 2020
Main activity: 43.32001 - Assembly of exterior and interior joinery: doors, windows, staircases, fitted kitchen cupboards shop fittings, door and window frames, etc.
Since May 1, 2020
Main activity: 43.32002 - Assembly of wooden or plastic mobile walls; lining walls, ceilings etc.
Since May 1, 2020
Main activity: 43.32003 - Assembly of wooden or plastic garage doors, shutters, blinds, fences, gates etc.
Since May 1, 2020
Main activity: 43.32004 - Assembly of wooden or plastic armoured doors and firewall doors
Since May 1, 2020
Main activity: 43.32005 - Assembly of wooden or plastic greenhouses, verandas etc.
Since May 1, 2020
Main activity: 43.32011 - Assembly of external and internal metal joinery: doors, windows, door and window frames, staircases, fitted kitchen cupboards, shop fittings, etc.
Since May 1, 2020
Main activity: 43.32012 - Assembly of metal mobile walls; lining walls, ceilings, etc.
Since May 1, 2020
Main activity: 43.32013 - Assembly of metal garage doors, shutters, blinds, fences, gates, etc.
Since May 1, 2020
Main activity: 43.32014 - Assembly of metal armoured doors and fire doors
Since May 1, 2020
Main activity: 43.32015 - Assembly of metal greenhouses, verandas, etc.
Since May 1, 2020
Main activity: 43.32016 - Assembly of exterior and interior plastic joinery
Since May 1, 2020
Main activity: 43.32021 - Installation of glass interior doors, partition walls, etc.
Since May 1, 2020
Main activity: 43.331 - Tiling of floors and walls
Since May 1, 2020
Main activity: 43.332 - Fitting of wood coverings for floors and walls
Since May 1, 2020
Main activity: 43.343 - Glaziery
Since May 1, 2020
Main activity: 43.390 - Other finishing work
Since May 1, 2020
Main activity: 43.39001 - Cleaning of new buildings and rehabilitation of sites after work
Since May 1, 2020
Main activity: 43.39002 - Other building completion and finishing work n.e.s.
Since May 1, 2020
Main activity: 43.910 - Roofing works
Since May 1, 2020
Main activity: 43.991 - Waterproofing of walls
Since May 1, 2020
Main activity: 43.992 - Restoration of façades
Since May 1, 2020
Main activity: 43.99201 - Steam cleaning, sand blasting and similar activities for building exteriors
Since May 1, 2020
Main activity: 43.99402 - Execution of repointing
Since May 1, 2020
Main activity: 43.99901 - Establishment of foundations, including pile driving
Since May 1, 2020
Main activity: 43.99904 - Installation of steel structure elements not manufactured by the unit carrying out the work
Since May 1, 2020
Main activity: 43.99905 - Execution of lifting work for third parties
Since May 1, 2020
Main activity: 43.99906 - Assembly and disassembly of scaffolding and work platforms
Since May 1, 2020
Main activity: 46.731 - Wholesale trade of construction materials, general assortment
Since May 1, 2020
Main activity: 47.521 - Retail trade of specialised stores of building materials, general assortment in specialised stores
Since May 1, 2020
Main activity: 71.11103 - Supervision of construction work (structural work, installation, finishing work, etc.)
Since May 1, 2020
Main activity: 71.121 - Engineering and technical consultancy activities, except surveying activities
Since May 1, 2020
Main activity: 81.210 - General cleaning of buildings
Since May 1, 2020
Main activity: 81.300 - Landscape service activities
Since May 1, 2020
Main activity: 81.30001 - Pruning of trees and hedges
Since May 1, 2020
Main activity: 81.30002 - Creation and maintenance of gardens, parks and green spaces for sports facilities
Since May 1, 2020
 
 

Version of the Nacebel codes for the NSSO-activities 2008(1)

Main activity: 43.320 - Joinery works
Since October 1, 2020
 
 

(1)The EC-classification of the Nacebel codes has changed on 1/1/2008. Both the Nacebel codification of 2003 and 2008 are available in Public Search. The 2003 codes were valid until 31/12/2007. On 1/1/2008, the new codification became valid. This was a mere administrative conversion : no activities of the entity or establishment unit have thus been changed.