Establishment unit data
In general | |||||
Enterprise number: | 0766.989.886 | ||||
Status of the entity: | Active | ||||
Number of the establishment unit: | 2.316.279.430 | ||||
Status of the establishment unit: | Active | ||||
Start date: | April 21, 2021 | ||||
Name of the establishment unit: |
ZENDELI CONSTRUCT Name in French, since April 21, 2021 | ||||
Address of the establishment unit: |
Rue Auguste De Boeck 64
1140 Evere Since April 21, 2021 | ||||
Phone number: | No information found in the CBE. | ||||
Fax: | No information found in the CBE. | ||||
Email address: |
| ||||
Web address: | No information found in the CBE. | ||||
| |||||
Authorisations | |||||
No data included in CBE. | |||||
| |||||
Version of Nacebel codes for activities 2008(1) | |||||
Main activity: 41.201 - General construction of residential buildings Since April 21, 2021 | |||||
Main activity: 41.203 - General construction of other non-residential buildings Since April 21, 2021 | |||||
Main activity: 42.11001 - Construction of motorways, roads, streets, pavements and other vehicular and pedestrian roads (including the installation of crash barriers) Since April 21, 2021 | |||||
Main activity: 42.21901 - Drilling and water well construction, shaft sinking Since April 21, 2021 | |||||
Main activity: 42.22002 - Construction of telecommunication lines and networks Since April 21, 2021 | |||||
Main activity: 43.12001 - Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc. Since April 21, 2021 | |||||
Main activity: 43.12011 - Clearing of building sites Since April 21, 2021 | |||||
Main activity: 43.211 - Electrotechnical installation work for buildings Since April 21, 2021 | |||||
Main activity: 43.221 - Plumbing works Since April 21, 2021 | |||||
Main activity: 43.222 - Installation of heating, ventilation and air conditioning Since April 21, 2021 | |||||
Main activity: 43.291 - Insulation works Since April 21, 2021 | |||||
Main activity: 43.310 - Plastering works Since April 21, 2021 | |||||
Main activity: 43.31001 - Application in buildings or other construction projects of plaster or stucco for interiors or exteriors, including related lathing materials Since April 21, 2021 | |||||
Main activity: 43.320 - Joinery works Since April 21, 2021 | |||||
Main activity: 43.32001 - Assembly of exterior and interior joinery: doors, windows, staircases, fitted kitchen cupboards shop fittings, door and window frames, etc. Since April 21, 2021 | |||||
Main activity: 43.32002 - Assembly of wooden or plastic mobile walls; lining walls, ceilings etc. Since April 21, 2021 | |||||
Main activity: 43.32003 - Assembly of wooden or plastic garage doors, shutters, blinds, fences, gates etc. Since April 21, 2021 | |||||
Main activity: 43.32004 - Assembly of wooden or plastic armoured doors and firewall doors Since April 21, 2021 | |||||
Main activity: 43.32005 - Assembly of wooden or plastic greenhouses, verandas etc. Since April 21, 2021 | |||||
Main activity: 43.32011 - Assembly of external and internal metal joinery: doors, windows, door and window frames, staircases, fitted kitchen cupboards, shop fittings, etc. Since April 21, 2021 | |||||
Main activity: 43.32012 - Assembly of metal mobile walls; lining walls, ceilings, etc. Since April 21, 2021 | |||||
Main activity: 43.32013 - Assembly of metal garage doors, shutters, blinds, fences, gates, etc. Since April 21, 2021 | |||||
Main activity: 43.32014 - Assembly of metal armoured doors and fire doors Since April 21, 2021 | |||||
Main activity: 43.32015 - Assembly of metal greenhouses, verandas, etc. Since April 21, 2021 | |||||
Main activity: 43.32016 - Assembly of exterior and interior plastic joinery Since April 21, 2021 | |||||
Main activity: 43.32021 - Installation of glass interior doors, partition walls, etc. Since April 21, 2021 | |||||
Main activity: 43.32031 - Assembly of gypsum drywalls Since April 21, 2021 | |||||
Main activity: 43.331 - Tiling of floors and walls Since April 21, 2021 | |||||
Main activity: 43.33101 - Fitting in buildings or other construction projects of: wall coverings or ceramic, concrete or stone tiles; granite flooring and wall coverings, etc. Since April 21, 2021 | |||||
Main activity: 43.332 - Fitting of wood coverings for floors and walls Since April 21, 2021 | |||||
Main activity: 43.33201 - Fitting in buildings or other construction projects of: parquet and other wood floors, wooden wall coverings Since April 21, 2021 | |||||
Main activity: 43.333 - Wallpapering and wall and floor coverings in other materials Since April 21, 2021 | |||||
Main activity: 43.33301 - Wallpapering Since April 21, 2021 | |||||
Main activity: 43.341 - Painting of buildings Since April 21, 2021 | |||||
Main activity: 43.34101 - Interior and exterior painting of buildings Since April 21, 2021 | |||||
Main activity: 43.342 - Painting of civil engineering works Since April 21, 2021 | |||||
Main activity: 43.34201 - Painting of metal frames Since April 21, 2021 | |||||
Main activity: 43.343 - Glaziery Since April 21, 2021 | |||||
Main activity: 43.34301 - Fitting of glass, mirrors, etc. Since April 21, 2021 | |||||
Main activity: 43.390 - Other finishing work Since April 21, 2021 | |||||
Main activity: 43.910 - Roofing works Since April 21, 2021 | |||||
Main activity: 43.994 - Masonry and repointing Since April 21, 2021 |
|
(1)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). There are different versions of these codes. Activities with a NACE-BEL code (version 2003) were stopped on 31/12/2007 and automatically converted to the new NACE-BEL codes (2008 version) starting on 01/01/2008. A new 2025 version of the codes will enter into force on 01/01/2025. During the first half of the year 2025, all activities with a 2008 version of the NACE-BEL code will be phased out with 31/12/2024 as end date and automatically converted to the 2025 version of the NACE-BEL codes, starting on 01/01/2025. Up until then, activities will continue to be registered using the 2008 NACE-BEL codes.