Establishment unit data
In general | |||
Enterprise number: | 0782.576.697 | ||
Status of the entity: | Active | ||
Number of the establishment unit: | 2.328.620.503 | ||
Status of the establishment unit: | Active | ||
Start date: | February 24, 2022 | ||
Name of the establishment unit: |
ORY-GAUTHY ETABLISSEMENT Name in French, since February 24, 2022 | ||
Address of the establishment unit: |
Rue Jean Jaurès 174
box 2
4430 Ans Since January 4, 2024 | ||
Phone number: | No information found in the CBE. | ||
Fax: | No information found in the CBE. | ||
Email address: | No information found in the CBE. | ||
Web address: | No information found in the CBE. | ||
| |||
Authorisations | |||
No data included in CBE. | |||
Licences registered with the Federal Agency for the Safety of the Food Chain (FASFC) Click here | |||
| |||
Version of Nacebel codes for activities 2025(1) | |||
Main activity: 43.12005
- Clearing of building sites Since January 1, 2025 | |||
Main activity: 43.32006
- Assembly of external and internal metal joinery: doors, windows, door and window frames, staircases, fitted kitchen cupboards, shop fittings, etc Since January 1, 2025 | |||
Main activity: 16.240
- Manufacture of wooden containers Since January 1, 2025 | |||
Main activity: 16.281
- Manufacture of other products of wood Since January 1, 2025 | |||
Main activity: 16.210
- Manufacture of veneer sheets and wood-based panels Since January 1, 2025 | |||
Main activity: 43.12001
- Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc Since January 1, 2025 | |||
Main activity: 43.13002
- Execution of horizontal drilling for cable glands or ducts Since January 1, 2025 | |||
Main activity: 81.300
- Landscape service activities Since January 1, 2025 | |||
Main activity: 43.24006
- Installation of building aerials and lightning rods Since January 1, 2025 | |||
Main activity: 31.009
- Manufacture of other furniture nec Since January 1, 2025 | |||
Main activity: 31.002
- Manufacture of kitchen furniture Since January 1, 2025 | |||
Main activity: 25.110
- Manufacture of metal structures and parts of structures Since January 1, 2025 | |||
Main activity: 16.282
- Manufacture of products of cork, straw and plaiting materials Since January 1, 2025 | |||
Main activity: 25.120
- Manufacture of doors and windows of metal Since January 1, 2025 | |||
Main activity: 43.21102
- Installation of telecommunication systems and computer facilities Since January 1, 2025 | |||
Main activity: 43.41002
- Covering work using all materials Since January 1, 2025 | |||
Main activity: 43.350
- Other building completion and finishing Since January 1, 2025 | |||
Main activity: 43.32002
- Assembly of wooden or plastic mobile walls; lining walls, ceilings etc Since January 1, 2025 | |||
Main activity: 43.32005
- Assembly of wooden or plastic greenhouses, verandas etc Since January 1, 2025 | |||
Main activity: 43.32012
- Installation of glass interior doors, partition walls, etc Since January 1, 2025 | |||
Main activity: 43.32001
- Assembly of exterior and interior joinery: doors, windows, staircases, fitted kitchen cupboards shop fittings, door and window frames, etc Since January 1, 2025 | |||
Main activity: 43.230
- Installation of insulation Since January 1, 2025 | |||
Main activity: 41.00101
- Realisation of the main structure of individual houses Since January 1, 2025 | |||
Main activity: 43.91002
- Execution of repointing Since January 1, 2025 | |||
Main activity: 43.41001
- Framework assembly Since January 1, 2025 | |||
Main activity: 41.00103
- Realisation of the main structure of multi-cellular buildings (apartments, etc) Since January 1, 2025 | |||
Main activity: 31.004
- Manufacture of furniture for dining room, living room, bedroom and bathroom Since January 1, 2025 | |||
Main activity: 43.24003
- Other installation works nes, including installation of accessories Since January 1, 2025 | |||
Main activity: 43.32008
- Assembly of metal garage doors, shutters, blinds, fences, gates, etc Since January 1, 2025 | |||
Main activity: 43.130
- Test drilling and boring Since January 1, 2025 | |||
Main activity: 43.32010
- Assembly of metal greenhouses, verandas, etc Since January 1, 2025 | |||
Main activity: 42.21901
- Drilling and water well construction, shaft sinking Since January 1, 2025 | |||
Main activity: 43.32004
- Assembly of wooden or plastic armoured doors and firewall doors Since January 1, 2025 | |||
Main activity: 42.21903
- Construction of networks to transport gas, petroleum products, etc Since January 1, 2025 | |||
Main activity: 43.32003
- Assembly of wooden or plastic garage doors, shutters, blinds, fences, gates etc Since January 1, 2025 | |||
Main activity: 43.421
- Waterproofing of walls Since January 1, 2025 | |||
Main activity: 43.99003
- Assembly and disassembly of scaffolding and work platforms Since January 1, 2025 | |||
Main activity: 81.230
- Other cleaning activities Since January 1, 2025 | |||
Main activity: 16.220
- Manufacture of assembled parquet floors Since January 1, 2025 | |||
Main activity: 43.32009
- Assembly of metal armoured doors and fire doors Since January 1, 2025 | |||
Main activity: 43.24001
- Installation of blinds and awnings Since January 1, 2025 | |||
Main activity: 81.22011
- Steam cleaning, sand blasting and similar activities for building exteriors Since January 1, 2025 | |||
Main activity: 43.99002
- Execution of lifting work for third parties Since January 1, 2025 | |||
Main activity: 31.001
- Manufacture of office and shop furniture Since January 1, 2025 | |||
Main activity: 43.343
- Glazing Since January 1, 2025 | |||
Main activity: 43.32011
- Assembly of exterior and interior plastic joinery Since January 1, 2025 | |||
Main activity: 16.230
- Manufacture of other builders’ carpentry and joinery Since January 1, 2025 | |||
Main activity: 43.41003
- Installation of draining elements for rainwater Since January 1, 2025 | |||
Main activity: 43.32013
- Assembly of gypsum drywalls Since January 1, 2025 | |||
Main activity: 43.410
- Roofing activities Since January 1, 2025 | |||
Main activity: 43.32007
- Assembly of metal mobile walls; lining walls, ceilings, etc Since January 1, 2025 | |||
Main activity: 42.22002
- Construction of telecommunication lines and networks Since January 1, 2025 | |||
Main activity: 43.12003
- Lowering of the water table and drainage of construction sites Since January 1, 2025 | |||
Main activity: 81.220
- Other building and industrial cleaning activities Since January 1, 2025 | |||
| |||
Version of the Nacebel codes for the NSSO-activities 2025(1) | |||
Main activity: 43.410
- Roofing activities Since April 22, 2025 | |||
Show the NACE-BEL codes activities version 2008. |
|
(1)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). Activities registered of the NACE-BEL codes (version 2003) were stopped on 31/12/2007, automatically converted to the NACE-BEL codes (version 2008) and registered with a start date of 01/01/2008. This was a mere administrative conversion and no modification of the activity itself.
(2)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). Following a conversion of activities with a NACE-BEL code (2003 version) to NACE-BEL codes (2008 version), the start date of activities (2008 version) is 1/01/2008. Activities with a NACE-BEL code (2008 version) were then stopped on 31/12/2024 and automatically converted to NACE-BEL codes (2025 version). These were mere administrative conversion and no modification of the activity itself. The 2003 activities can be accessed by clicking on the link : "Show the NACE-BEL codes activities version 2003".