Establishment unit data
In general | |||
Enterprise number: | 0783.195.123 | ||
Status of the entity: | Active | ||
Number of the establishment unit: | 2.329.605.250 | ||
Status of the establishment unit: | Active | ||
Start date: | March 8, 2022 | ||
Name of the establishment unit: |
Steegmans nieuwbouw & renovatie Name in Dutch, since March 8, 2022 | ||
Address of the establishment unit: |
Putvennestraat 66A
3500 Hasselt Since March 8, 2022 | ||
Phone number: | No information found in the CBE. | ||
Fax: | No information found in the CBE. | ||
Email address: | No information found in the CBE. | ||
Web address: | No information found in the CBE. | ||
| |||
Authorisations | |||
No data included in CBE. | |||
| |||
Version of Nacebel codes for activities 2008(1) | |||
Main activity: 41.20101 - Realisation of the main structure of individual houses Since March 8, 2022 | |||
Main activity: 41.20111 - Realisation of the main structure of multi-cellular buildings (apartments, etc.) Since March 8, 2022 | |||
Main activity: 42.11001 - Construction of motorways, roads, streets, pavements and other vehicular and pedestrian roads (including the installation of crash barriers) Since March 8, 2022 | |||
Main activity: 42.21911 - Construction of water supply, distribution and drainage networks Since March 8, 2022 | |||
Main activity: 43.11001 - Demolition of buildings and other constructions Since March 8, 2022 | |||
Main activity: 43.12001 - Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc. Since March 8, 2022 | |||
Main activity: 43.12003 - Lowering of the water table and drainage of construction sites Since March 8, 2022 | |||
Main activity: 43.12011 - Clearing of building sites Since March 8, 2022 | |||
Main activity: 43.22201 - Installation in buildings or other construction projects of: heating systems, electricity, gas and oil-fired boilers, ventilation and air conditioning material and ducting, etc. Since March 8, 2022 | |||
Main activity: 43.22211 - Installation of electrical heating systems Since March 8, 2022 | |||
Main activity: 43.291 - Insulation works Since March 8, 2022 | |||
Main activity: 43.310 - Plastering works Since March 8, 2022 | |||
Main activity: 43.31001 - Application in buildings or other construction projects of plaster or stucco for interiors or exteriors, including related lathing materials Since March 8, 2022 | |||
Main activity: 43.32001 - Assembly of exterior and interior joinery: doors, windows, staircases, fitted kitchen cupboards shop fittings, door and window frames, etc. Since March 8, 2022 | |||
Main activity: 43.32002 - Assembly of wooden or plastic mobile walls; lining walls, ceilings etc. Since March 8, 2022 | |||
Main activity: 43.32003 - Assembly of wooden or plastic garage doors, shutters, blinds, fences, gates etc. Since March 8, 2022 | |||
Main activity: 43.32004 - Assembly of wooden or plastic armoured doors and firewall doors Since March 8, 2022 | |||
Main activity: 43.32005 - Assembly of wooden or plastic greenhouses, verandas etc. Since March 8, 2022 | |||
Main activity: 43.32013 - Assembly of metal garage doors, shutters, blinds, fences, gates, etc. Since March 8, 2022 | |||
Main activity: 43.32016 - Assembly of exterior and interior plastic joinery Since March 8, 2022 | |||
Main activity: 43.32021 - Installation of glass interior doors, partition walls, etc. Since March 8, 2022 | |||
Main activity: 43.32031 - Assembly of gypsum drywalls Since March 8, 2022 | |||
Main activity: 43.33101 - Fitting in buildings or other construction projects of: wall coverings or ceramic, concrete or stone tiles; granite flooring and wall coverings, etc. Since March 8, 2022 | |||
Main activity: 43.333 - Wallpapering and wall and floor coverings in other materials Since March 8, 2022 | |||
Main activity: 43.343 - Glaziery Since March 8, 2022 | |||
Main activity: 43.390 - Other finishing work Since March 8, 2022 | |||
Main activity: 43.39001 - Cleaning of new buildings and rehabilitation of sites after work Since March 8, 2022 | |||
Main activity: 43.39002 - Other building completion and finishing work n.e.s. Since March 8, 2022 | |||
Main activity: 43.910 - Roofing works Since March 8, 2022 | |||
Main activity: 43.992 - Restoration of façades Since March 8, 2022 | |||
Main activity: 43.994 - Masonry and repointing Since March 8, 2022 | |||
Main activity: 43.996 - Screed laying Since March 8, 2022 | |||
Main activity: 43.999 - Other specialised construction activities Since March 8, 2022 | |||
Main activity: 43.99901 - Establishment of foundations, including pile driving Since March 8, 2022 | |||
Main activity: 43.99902 - Formwork and rebar work Since March 8, 2022 | |||
Main activity: 43.99906 - Assembly and disassembly of scaffolding and work platforms Since March 8, 2022 | |||
Main activity: 64.20011 - Holding management activities: intervention in day-to-day management, representation of companies on the basis of ownership or control of the share capital, etc. Since March 8, 2022 | |||
Main activity: 64.20012 - Long-term holding of shares issued by several other companies classified in different economic sectors Since March 8, 2022 | |||
Main activity: 68.100 - Buying and selling of own real estate Since March 8, 2022 |
|
(1)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). There are different versions of these codes. Activities with a NACE-BEL code (version 2003) were stopped on 31/12/2007 and automatically converted to the new NACE-BEL codes (2008 version) starting on 01/01/2008. A new 2025 version of the codes will enter into force on 01/01/2025. During the first half of the year 2025, all activities with a 2008 version of the NACE-BEL code will be phased out with 31/12/2024 as end date and automatically converted to the 2025 version of the NACE-BEL codes, starting on 01/01/2025. Up until then, activities will continue to be registered using the 2008 NACE-BEL codes.