Establishment unit data
In general | |||
Enterprise number: | 0783.930.838 | ||
Status of the entity: | Active | ||
Number of the establishment unit: | 2.329.663.054 | ||
Status of the establishment unit: | Active | ||
Start date: | April 1, 2022 | ||
Name of the establishment unit: |
Erdem Tech Name in French, since September 1, 2024 | ||
Address of the establishment unit: |
Nieuwe Gentsesteenweg 3
1702 Dilbeek Since April 1, 2022 | ||
Phone number: | No information found in the CBE. | ||
Fax: | No information found in the CBE. | ||
Email address: | No information found in the CBE. | ||
Web address: | No information found in the CBE. | ||
| |||
Authorisations | |||
No data included in CBE. | |||
| |||
Version of Nacebel codes for activities 2008(1) | |||
Main activity: 41.201 - General construction of residential buildings Since April 1, 2022 | |||
Main activity: 41.20101 - Realisation of the main structure of individual houses Since April 1, 2022 | |||
Main activity: 41.20102 - Construction of individual "turnkey" houses Since April 1, 2022 | |||
Main activity: 41.20111 - Realisation of the main structure of multi-cellular buildings (apartments, etc.) Since April 1, 2022 | |||
Main activity: 41.20112 - Realisation of "turnkey" apartments Since April 1, 2022 | |||
Main activity: 41.20121 - Realisation of the structural work of buildings Since April 1, 2022 | |||
Main activity: 41.20122 - General coordination on the construction site Since April 1, 2022 | |||
Main activity: 41.202 - General construction of office buildings Since April 1, 2022 | |||
Main activity: 41.203 - General construction of other non-residential buildings Since April 1, 2022 | |||
Main activity: 41.20301 - Realisation of structural work on buildings and industrial or commercial structures, vehicle depots, warehouses, schools, clinics, buildings for the practice of worship, etc. Since April 1, 2022 | |||
Main activity: 41.20302 - Assembly of hangars, barns, silos, etc., for agricultural use Since April 1, 2022 | |||
Main activity: 43.110 - Demolition works Since April 1, 2022 | |||
Main activity: 43.120 - Site preparation works Since April 1, 2022 | |||
Main activity: 43.130 - Test drilling and surveys Since April 1, 2022 | |||
Main activity: 43.211 - Electrotechnical installation work for buildings Since April 1, 2022 | |||
Main activity: 43.21101 - Installation of electrical wiring and fittings Since April 1, 2022 | |||
Main activity: 43.21102 - Installation of telecommunication systems and computer facilities Since April 1, 2022 | |||
Main activity: 43.21103 - Installation of surveillance and alarm systems against intruders Since April 1, 2022 | |||
Main activity: 43.212 - Electrotechnical installation work other than buildings Since April 1, 2022 | |||
Main activity: 43.21201 - Installation of illumination and signalling systems for roads, railways, airports and port facilities (including the installation of traffic signs) Since April 1, 2022 | |||
Main activity: 43.221 - Plumbing works Since April 1, 2022 | |||
Main activity: 43.22101 - Installation in buildings or other structures of: plumbing and sanitary facilities, pipes, gas and water connections (except for heating), installation of automatic fire extinguishing systems, etc. Since April 1, 2022 | |||
Main activity: 43.222 - Installation of heating, ventilation and air conditioning Since April 1, 2022 | |||
Main activity: 43.22201 - Installation in buildings or other construction projects of: heating systems, electricity, gas and oil-fired boilers, ventilation and air conditioning material and ducting, etc. Since April 1, 2022 | |||
Main activity: 43.22202 - Installation of heating, cooling and ventilation systems (except heating) Since April 1, 2022 | |||
Main activity: 43.22211 - Installation of electrical heating systems Since April 1, 2022 | |||
Main activity: 43.291 - Insulation works Since April 1, 2022 | |||
Main activity: 43.29101 - Implementation in buildings or other construction projects of: thermal insulation, acoustic and anti vibration insulation Since April 1, 2022 | |||
Main activity: 43.29102 - Insulation work for heating or cooling pipes Since April 1, 2022 | |||
Main activity: 43.29103 - Insulation work for cold storage or refrigerated warehouses Since April 1, 2022 | |||
Main activity: 43.299 - Other installation works n.e.c. Since April 1, 2022 | |||
Main activity: 43.29901 - Installation of blinds and awnings Since April 1, 2022 | |||
Main activity: 43.29902 - Installation of signs, illuminated or not Since April 1, 2022 | |||
Main activity: 43.29903 - Other installation works n.e.s., including installation of accessories Since April 1, 2022 | |||
Main activity: 43.29904 - General installation work Since April 1, 2022 | |||
Main activity: 43.29911 - Installation of lifts and escalators Since April 1, 2022 | |||
Main activity: 43.29912 - Installation of building aerials and lightning rods Since April 1, 2022 | |||
Main activity: 43.310 - Plastering works Since April 1, 2022 | |||
Main activity: 43.31001 - Application in buildings or other construction projects of plaster or stucco for interiors or exteriors, including related lathing materials Since April 1, 2022 | |||
Main activity: 43.320 - Joinery works Since April 1, 2022 | |||
Main activity: 43.32001 - Assembly of exterior and interior joinery: doors, windows, staircases, fitted kitchen cupboards shop fittings, door and window frames, etc. Since April 1, 2022 | |||
Main activity: 43.32002 - Assembly of wooden or plastic mobile walls; lining walls, ceilings etc. Since April 1, 2022 | |||
Main activity: 43.32003 - Assembly of wooden or plastic garage doors, shutters, blinds, fences, gates etc. Since April 1, 2022 | |||
Main activity: 43.32004 - Assembly of wooden or plastic armoured doors and firewall doors Since April 1, 2022 | |||
Main activity: 43.32005 - Assembly of wooden or plastic greenhouses, verandas etc. Since April 1, 2022 | |||
Main activity: 43.32011 - Assembly of external and internal metal joinery: doors, windows, door and window frames, staircases, fitted kitchen cupboards, shop fittings, etc. Since April 1, 2022 | |||
Main activity: 43.32012 - Assembly of metal mobile walls; lining walls, ceilings, etc. Since April 1, 2022 | |||
Main activity: 43.32013 - Assembly of metal garage doors, shutters, blinds, fences, gates, etc. Since April 1, 2022 | |||
Main activity: 43.32014 - Assembly of metal armoured doors and fire doors Since April 1, 2022 | |||
Main activity: 43.32015 - Assembly of metal greenhouses, verandas, etc. Since April 1, 2022 | |||
Main activity: 43.32016 - Assembly of exterior and interior plastic joinery Since April 1, 2022 | |||
Main activity: 43.32021 - Installation of glass interior doors, partition walls, etc. Since April 1, 2022 | |||
Main activity: 43.32031 - Assembly of gypsum drywalls Since April 1, 2022 | |||
Main activity: 43.331 - Tiling of floors and walls Since April 1, 2022 | |||
Main activity: 43.33101 - Fitting in buildings or other construction projects of: wall coverings or ceramic, concrete or stone tiles; granite flooring and wall coverings, etc. Since April 1, 2022 | |||
Main activity: 43.332 - Fitting of wood coverings for floors and walls Since April 1, 2022 | |||
Main activity: 43.33201 - Fitting in buildings or other construction projects of: parquet and other wood floors, wooden wall coverings Since April 1, 2022 | |||
Main activity: 43.333 - Wallpapering and wall and floor coverings in other materials Since April 1, 2022 | |||
Main activity: 43.33301 - Wallpapering Since April 1, 2022 | |||
Main activity: 43.341 - Painting of buildings Since April 1, 2022 | |||
Main activity: 43.34101 - Interior and exterior painting of buildings Since April 1, 2022 | |||
Main activity: 43.342 - Painting of civil engineering works Since April 1, 2022 | |||
Main activity: 43.34201 - Painting of metal frames Since April 1, 2022 | |||
Main activity: 43.34202 - Painting of ships and boats by non-specialised units Since April 1, 2022 | |||
Main activity: 43.343 - Glaziery Since April 1, 2022 | |||
Main activity: 43.34301 - Fitting of glass, mirrors, etc. Since April 1, 2022 | |||
Main activity: 43.390 - Other finishing work Since April 1, 2022 | |||
Main activity: 43.39001 - Cleaning of new buildings and rehabilitation of sites after work Since April 1, 2022 | |||
Main activity: 43.39002 - Other building completion and finishing work n.e.s. Since April 1, 2022 | |||
Main activity: 43.910 - Roofing works Since April 1, 2022 | |||
Main activity: 43.91001 - Framework assembly Since April 1, 2022 | |||
Main activity: 43.91002 - Covering work using all materials Since April 1, 2022 | |||
Main activity: 43.91003 - Installation of draining elements for rainwater Since April 1, 2022 | |||
Main activity: 43.991 - Waterproofing of walls Since April 1, 2022 | |||
Main activity: 43.99101 - Waterproofing of roofs and roof terraces Since April 1, 2022 | |||
Main activity: 43.99111 - Treatment of walls with water repellent products Since April 1, 2022 | |||
Main activity: 43.992 - Restoration of façades Since April 1, 2022 | |||
Main activity: 43.99201 - Steam cleaning, sand blasting and similar activities for building exteriors Since April 1, 2022 | |||
Main activity: 43.993 - Construction of decorative fireplaces and open fireplaces Since April 1, 2022 | |||
Main activity: 43.99301 - Construction of decorative fireplaces and open fireplaces Since April 1, 2022 | |||
Main activity: 43.994 - Masonry and repointing Since April 1, 2022 | |||
Main activity: 43.99401 - Masonry Since April 1, 2022 | |||
Main activity: 43.99402 - Execution of repointing Since April 1, 2022 | |||
Main activity: 43.995 - Building restoration works Since April 1, 2022 | |||
Main activity: 43.99601 - Screed laying Since April 1, 2022 | |||
Main activity: 43.999 - Other specialised construction activities Since April 1, 2022 | |||
Main activity: 43.99901 - Establishment of foundations, including pile driving Since April 1, 2022 | |||
Main activity: 43.99902 - Formwork and rebar work Since April 1, 2022 | |||
Main activity: 43.99903 - Construction of chimneys and industrial ovens Since April 1, 2022 | |||
Main activity: 43.99904 - Installation of steel structure elements not manufactured by the unit carrying out the work Since April 1, 2022 | |||
Main activity: 43.99905 - Execution of lifting work for third parties Since April 1, 2022 | |||
Main activity: 43.99906 - Assembly and disassembly of scaffolding and work platforms Since April 1, 2022 | |||
Main activity: 43.99907 - Construction of cold rooms, vaults, etc. Since April 1, 2022 | |||
Main activity: 43.99911 - Rental of construction equipment with operator Since April 1, 2022 | |||
Main activity: 43.99921 - Execution of underwater work of all kinds Since April 1, 2022 | |||
Main activity: 43.99931 - Installation of private swimming pools Since April 1, 2022 | |||
Main activity: 66.300 - Fund management activities Since April 1, 2022 | |||
Main activity: 68.100 - Buying and selling of own real estate Since April 1, 2022 | |||
Main activity: 68.10001 - Real estate transactions such as: residential buildings and dwelling houses, non-residential buildings, land and grounds Since April 1, 2022 | |||
Main activity: 68.10002 - Transactions on own assets such as goodwill, leaseholds and key money (takeover) Since April 1, 2022 | |||
Main activity: 68.201 - Renting and operating of own or leased real estate, excluding social housing Since April 1, 2022 | |||
Main activity: 68.202 - Rental and operation of social housing Since April 1, 2022 | |||
Main activity: 68.203 - Rental and operating of own or leased real estate, except land Since April 1, 2022 | |||
Main activity: 68.204 - Land rental and operation Since April 1, 2022 | |||
Main activity: 82.990 - Other business support service activities n.e.c. Since April 1, 2022 | |||
| |||
Version of the Nacebel codes for the NSSO-activities 2008(1) | |||
Main activity: 43.211 - Electrotechnical installation work for buildings Since October 5, 2023 |
|
(1)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). There are different versions of these codes. Activities with a NACE-BEL code (version 2003) were stopped on 31/12/2007 and automatically converted to the new NACE-BEL codes (2008 version) starting on 01/01/2008. A new 2025 version of the codes will enter into force on 01/01/2025. During the first half of the year 2025, all activities with a 2008 version of the NACE-BEL code will be phased out with 31/12/2024 as end date and automatically converted to the 2025 version of the NACE-BEL codes, starting on 01/01/2025. Up until then, activities will continue to be registered using the 2008 NACE-BEL codes.