Establishment unit data
In general | |||
Enterprise number: | 0785.341.791 | ||
Status of the entity: | Active | ||
Number of the establishment unit: | 2.330.704.914 | ||
Status of the establishment unit: | Active | ||
Start date: | April 23, 2022 | ||
Name of the establishment unit: |
Devon Kockx Name in Dutch, since April 23, 2022 | ||
Address of the establishment unit: |
Oostveld 67
9940 Evergem Since April 23, 2022 | ||
Phone number: | No information found in the CBE. | ||
Fax: | No information found in the CBE. | ||
Email address: | No information found in the CBE. | ||
Web address: | No information found in the CBE. | ||
| |||
Authorisations | |||
No data included in CBE. | |||
| |||
Version of Nacebel codes for activities 2008(1) | |||
Main activity: 16.230 - Manufacture of other builders' carpentry and joinery Since April 23, 2022 | |||
Main activity: 22.23001 - Manufacture of doors and windows and their frames, shutters, blinds, baseboards, mouldings, etc. Since April 23, 2022 | |||
Main activity: 31.01021 - Manufacture of office and workshop seats Since April 23, 2022 | |||
Main activity: 31.091 - Manufacture of dining rooms, lounges, bedrooms and bathrooms Since April 23, 2022 | |||
Main activity: 31.09101 - Manufacture of seats and seat parts: chairs, benches, chairs, sofas, stools, etc. Since April 23, 2022 | |||
Main activity: 31.09102 - Finishing of seats through operations such as padding Since April 23, 2022 | |||
Main activity: 31.09111 - Manufacturing and finishing (including cushioning, painting, varnishing, etc.) of furniture of the kind used in bedrooms and dining rooms and living rooms Since April 23, 2022 | |||
Main activity: 31.09901 - Manufacturing cupboards, special furniture for television sets, accessory furniture, etc. Since April 23, 2022 | |||
Main activity: 43.110 - Demolition works Since April 23, 2022 | |||
Main activity: 43.12001 - Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc. Since April 23, 2022 | |||
Main activity: 43.211 - Electrotechnical installation work for buildings Since April 23, 2022 | |||
Main activity: 43.221 - Plumbing works Since April 23, 2022 | |||
Main activity: 43.222 - Installation of heating, ventilation and air conditioning Since April 23, 2022 | |||
Main activity: 43.291 - Insulation works Since April 23, 2022 | |||
Main activity: 43.29101 - Implementation in buildings or other construction projects of: thermal insulation, acoustic and anti vibration insulation Since April 23, 2022 | |||
Main activity: 43.29901 - Installation of blinds and awnings Since April 23, 2022 | |||
Main activity: 43.29903 - Other installation works n.e.s., including installation of accessories Since April 23, 2022 | |||
Main activity: 43.29904 - General installation work Since April 23, 2022 | |||
Main activity: 43.310 - Plastering works Since April 23, 2022 | |||
Main activity: 43.320 - Joinery works Since April 23, 2022 | |||
Main activity: 43.32001 - Assembly of exterior and interior joinery: doors, windows, staircases, fitted kitchen cupboards shop fittings, door and window frames, etc. Since April 23, 2022 | |||
Main activity: 43.32002 - Assembly of wooden or plastic mobile walls; lining walls, ceilings etc. Since April 23, 2022 | |||
Main activity: 43.32003 - Assembly of wooden or plastic garage doors, shutters, blinds, fences, gates etc. Since April 23, 2022 | |||
Main activity: 43.32004 - Assembly of wooden or plastic armoured doors and firewall doors Since April 23, 2022 | |||
Main activity: 43.32005 - Assembly of wooden or plastic greenhouses, verandas etc. Since April 23, 2022 | |||
Main activity: 43.32011 - Assembly of external and internal metal joinery: doors, windows, door and window frames, staircases, fitted kitchen cupboards, shop fittings, etc. Since April 23, 2022 | |||
Main activity: 43.32012 - Assembly of metal mobile walls; lining walls, ceilings, etc. Since April 23, 2022 | |||
Main activity: 43.32013 - Assembly of metal garage doors, shutters, blinds, fences, gates, etc. Since April 23, 2022 | |||
Main activity: 43.32014 - Assembly of metal armoured doors and fire doors Since April 23, 2022 | |||
Main activity: 43.32031 - Assembly of gypsum drywalls Since April 23, 2022 | |||
Main activity: 43.331 - Tiling of floors and walls Since April 23, 2022 | |||
Main activity: 43.332 - Fitting of wood coverings for floors and walls Since April 23, 2022 | |||
Main activity: 43.390 - Other finishing work Since April 23, 2022 | |||
Main activity: 43.39002 - Other building completion and finishing work n.e.s. Since April 23, 2022 | |||
Main activity: 43.994 - Masonry and repointing Since April 23, 2022 | |||
Main activity: 43.99402 - Execution of repointing Since April 23, 2022 | |||
Main activity: 43.999 - Other specialised construction activities Since April 23, 2022 | |||
Main activity: 43.99904 - Installation of steel structure elements not manufactured by the unit carrying out the work Since April 23, 2022 |
|
(1)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). There are different versions of these codes. Activities with a NACE-BEL code (version 2003) were stopped on 31/12/2007 and automatically converted to the new NACE-BEL codes (2008 version) starting on 01/01/2008. A new 2025 version of the codes will enter into force on 01/01/2025. During the first half of the year 2025, all activities with a 2008 version of the NACE-BEL code will be phased out with 31/12/2024 as end date and automatically converted to the 2025 version of the NACE-BEL codes, starting on 01/01/2025. Up until then, activities will continue to be registered using the 2008 NACE-BEL codes.