Establishment unit data
In general | |||||
Enterprise number: | 0787.875.273 | ||||
Status of the entity: | Active | ||||
Number of the establishment unit: | 2.333.143.176 | ||||
Status of the establishment unit: | Active | ||||
Start date: | June 30, 2022 | ||||
Name of the establishment unit: |
KG Construct Company Name in French, since June 30, 2022 | ||||
Address of the establishment unit: |
Rue du Paradis(LEE) 134
6142 Fontaine-l'Evêque Since June 30, 2022 | ||||
Phone number: |
| ||||
Fax: | No information found in the CBE. | ||||
Email address: | No information found in the CBE. | ||||
Web address: | No information found in the CBE. | ||||
| |||||
Authorisations | |||||
No data included in CBE. | |||||
| |||||
Version of Nacebel codes for activities 2008(1) | |||||
Main activity: 42.11003 - Paint marking of pavements and lay-bys or car parks Since June 30, 2022 | |||||
Main activity: 42.91101 - Realisation of dredging works Since June 30, 2022 | |||||
Main activity: 42.91102 - Cleaning of rivers, ditches, etc. Since June 30, 2022 | |||||
Main activity: 43.12001 - Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc. Since June 30, 2022 | |||||
Main activity: 43.12002 - Site preparation for mining: overburden removal and other development and preparation of land and mining sites Since June 30, 2022 | |||||
Main activity: 43.12003 - Lowering of the water table and drainage of construction sites Since June 30, 2022 | |||||
Main activity: 43.12004 - Drainage of agricultural or forestry land Since June 30, 2022 | |||||
Main activity: 43.12011 - Clearing of building sites Since June 30, 2022 | |||||
Main activity: 43.13001 - Test surveys, test drilling and core sampling for construction as well as for geophysical or geological studies, or similar Since June 30, 2022 | |||||
Main activity: 43.13002 - Execution of horizontal drilling for cable glands or ducts Since June 30, 2022 | |||||
Main activity: 43.291 - Insulation works Since June 30, 2022 | |||||
Main activity: 43.29101 - Implementation in buildings or other construction projects of: thermal insulation, acoustic and anti vibration insulation Since June 30, 2022 | |||||
Main activity: 43.29102 - Insulation work for heating or cooling pipes Since June 30, 2022 | |||||
Main activity: 43.29903 - Other installation works n.e.s., including installation of accessories Since June 30, 2022 | |||||
Main activity: 43.29904 - General installation work Since June 30, 2022 | |||||
Main activity: 43.310 - Plastering works Since June 30, 2022 | |||||
Main activity: 43.320 - Joinery works Since June 30, 2022 | |||||
Main activity: 43.32012 - Assembly of metal mobile walls; lining walls, ceilings, etc. Since June 30, 2022 | |||||
Main activity: 43.32014 - Assembly of metal armoured doors and fire doors Since June 30, 2022 | |||||
Main activity: 43.32031 - Assembly of gypsum drywalls Since June 30, 2022 | |||||
Main activity: 43.33301 - Wallpapering Since June 30, 2022 | |||||
Main activity: 43.341 - Painting of buildings Since June 30, 2022 | |||||
Main activity: 43.34101 - Interior and exterior painting of buildings Since June 30, 2022 | |||||
Main activity: 43.342 - Painting of civil engineering works Since June 30, 2022 | |||||
Main activity: 43.34201 - Painting of metal frames Since June 30, 2022 | |||||
Main activity: 43.343 - Glaziery Since June 30, 2022 | |||||
Main activity: 43.39002 - Other building completion and finishing work n.e.s. Since June 30, 2022 | |||||
Main activity: 43.99201 - Steam cleaning, sand blasting and similar activities for building exteriors Since June 30, 2022 | |||||
Main activity: 43.99402 - Execution of repointing Since June 30, 2022 | |||||
Main activity: 43.996 - Screed laying Since June 30, 2022 | |||||
Main activity: 43.999 - Other specialised construction activities Since June 30, 2022 | |||||
Main activity: 43.99901 - Establishment of foundations, including pile driving Since June 30, 2022 | |||||
Main activity: 43.99904 - Installation of steel structure elements not manufactured by the unit carrying out the work Since June 30, 2022 | |||||
Main activity: 43.99905 - Execution of lifting work for third parties Since June 30, 2022 | |||||
Main activity: 43.99906 - Assembly and disassembly of scaffolding and work platforms Since June 30, 2022 | |||||
Main activity: 81.290 - Other cleaning activities Since June 30, 2022 |
|
(1)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). There are different versions of these codes. Activities with a NACE-BEL code (version 2003) were stopped on 31/12/2007 and automatically converted to the new NACE-BEL codes (2008 version) starting on 01/01/2008. A new 2025 version of the codes will enter into force on 01/01/2025. During the first half of the year 2025, all activities with a 2008 version of the NACE-BEL code will be phased out with 31/12/2024 as end date and automatically converted to the 2025 version of the NACE-BEL codes, starting on 01/01/2025. Up until then, activities will continue to be registered using the 2008 NACE-BEL codes.