Establishment unit data
In general | |||
Enterprise number: | 0788.903.374 | ||
Status of the entity: | Active | ||
Number of the establishment unit: | 2.334.247.392 | ||
Status of the establishment unit: | Active | ||
Start date: | July 26, 2022 | ||
Name of the establishment unit: |
EAC Interieurbouw Name in Dutch, since July 26, 2022 | ||
Address of the establishment unit: |
Schransstraat 14
2560 Nijlen Since July 26, 2022 | ||
Phone number: | No information found in the CBE. | ||
Fax: | No information found in the CBE. | ||
Email address: | No information found in the CBE. | ||
Web address: | No information found in the CBE. | ||
| |||
Authorisations | |||
No data included in CBE. | |||
| |||
Version of Nacebel codes for activities 2008(1) | |||
Main activity: 16.230 - Manufacture of other builders' carpentry and joinery Since July 26, 2022 | |||
Main activity: 25.12001 - Manufacture of metal joinery: doors and windows, shutters, movable partitions, gates, garage doors, etc. Since July 26, 2022 | |||
Main activity: 31.020 - Manufacture of kitchen furniture Since July 26, 2022 | |||
Main activity: 31.091 - Manufacture of dining rooms, lounges, bedrooms and bathrooms Since July 26, 2022 | |||
Main activity: 31.092 - Manufacture of garden and outdoor furniture Since July 26, 2022 | |||
Main activity: 41.201 - General construction of residential buildings Since July 26, 2022 | |||
Main activity: 41.20121 - Realisation of the structural work of buildings Since July 26, 2022 | |||
Main activity: 43.211 - Electrotechnical installation work for buildings Since July 26, 2022 | |||
Main activity: 43.212 - Electrotechnical installation work other than buildings Since July 26, 2022 | |||
Main activity: 43.22101 - Installation in buildings or other structures of: plumbing and sanitary facilities, pipes, gas and water connections (except for heating), installation of automatic fire extinguishing systems, etc. Since July 26, 2022 | |||
Main activity: 43.222 - Installation of heating, ventilation and air conditioning Since July 26, 2022 | |||
Main activity: 43.22211 - Installation of electrical heating systems Since July 26, 2022 | |||
Main activity: 43.291 - Insulation works Since July 26, 2022 | |||
Main activity: 43.29901 - Installation of blinds and awnings Since July 26, 2022 | |||
Main activity: 43.29903 - Other installation works n.e.s., including installation of accessories Since July 26, 2022 | |||
Main activity: 43.310 - Plastering works Since July 26, 2022 | |||
Main activity: 43.31001 - Application in buildings or other construction projects of plaster or stucco for interiors or exteriors, including related lathing materials Since July 26, 2022 | |||
Main activity: 43.320 - Joinery works Since July 26, 2022 | |||
Main activity: 43.32001 - Assembly of exterior and interior joinery: doors, windows, staircases, fitted kitchen cupboards shop fittings, door and window frames, etc. Since July 26, 2022 | |||
Main activity: 43.32002 - Assembly of wooden or plastic mobile walls; lining walls, ceilings etc. Since July 26, 2022 | |||
Main activity: 43.32003 - Assembly of wooden or plastic garage doors, shutters, blinds, fences, gates etc. Since July 26, 2022 | |||
Main activity: 43.32004 - Assembly of wooden or plastic armoured doors and firewall doors Since July 26, 2022 | |||
Main activity: 43.32005 - Assembly of wooden or plastic greenhouses, verandas etc. Since July 26, 2022 | |||
Main activity: 43.32011 - Assembly of external and internal metal joinery: doors, windows, door and window frames, staircases, fitted kitchen cupboards, shop fittings, etc. Since July 26, 2022 | |||
Main activity: 43.32013 - Assembly of metal garage doors, shutters, blinds, fences, gates, etc. Since July 26, 2022 | |||
Main activity: 43.32016 - Assembly of exterior and interior plastic joinery Since July 26, 2022 | |||
Main activity: 43.32021 - Installation of glass interior doors, partition walls, etc. Since July 26, 2022 | |||
Main activity: 43.32031 - Assembly of gypsum drywalls Since July 26, 2022 | |||
Main activity: 43.331 - Tiling of floors and walls Since July 26, 2022 | |||
Main activity: 43.33101 - Fitting in buildings or other construction projects of: wall coverings or ceramic, concrete or stone tiles; granite flooring and wall coverings, etc. Since July 26, 2022 | |||
Main activity: 43.332 - Fitting of wood coverings for floors and walls Since July 26, 2022 | |||
Main activity: 43.33201 - Fitting in buildings or other construction projects of: parquet and other wood floors, wooden wall coverings Since July 26, 2022 | |||
Main activity: 43.333 - Wallpapering and wall and floor coverings in other materials Since July 26, 2022 | |||
Main activity: 43.33301 - Wallpapering Since July 26, 2022 | |||
Main activity: 43.341 - Painting of buildings Since July 26, 2022 | |||
Main activity: 43.34101 - Interior and exterior painting of buildings Since July 26, 2022 | |||
Main activity: 43.390 - Other finishing work Since July 26, 2022 | |||
Main activity: 43.39002 - Other building completion and finishing work n.e.s. Since July 26, 2022 | |||
Main activity: 43.910 - Roofing works Since July 26, 2022 | |||
Main activity: 43.91002 - Covering work using all materials Since July 26, 2022 | |||
Main activity: 43.91003 - Installation of draining elements for rainwater Since July 26, 2022 | |||
Main activity: 43.994 - Masonry and repointing Since July 26, 2022 | |||
Main activity: 43.99401 - Masonry Since July 26, 2022 | |||
Main activity: 43.99402 - Execution of repointing Since July 26, 2022 | |||
Main activity: 43.999 - Other specialised construction activities Since July 26, 2022 |
|
(1)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). There are different versions of these codes. Activities with a NACE-BEL code (version 2003) were stopped on 31/12/2007 and automatically converted to the new NACE-BEL codes (2008 version) starting on 01/01/2008. A new 2025 version of the codes will enter into force on 01/01/2025. During the first half of the year 2025, all activities with a 2008 version of the NACE-BEL code will be phased out with 31/12/2024 as end date and automatically converted to the 2025 version of the NACE-BEL codes, starting on 01/01/2025. Up until then, activities will continue to be registered using the 2008 NACE-BEL codes.