shadow
The English version of the Public Search application constitutes an unofficial English translation and is provided for information purposes only.
No legal rights can therefore be derived from this translation. For the official application, please consult the Dutch, French or German versions of the Public Search application.


Establishment unit data

In general

Enterprise number:0794.965.082
Status of the entity:Active
Number of the establishment unit:2.339.273.873
Status of the establishment unit:Active
Start date:January 1, 2023
Name of the establishment unit: THAIRET TOITURES FRERES
Name in French, since January 1, 2023
Address of the establishment unit:
Route de Hamoir   4B
4500   Huy
Since January 1, 2023
Phone number:
+32477680745 Since January 1, 2023
Fax:No information found in the CBE.
Email address:
info.toituresthairet@gmail.comSince January 1, 2023
Web address:No information found in the CBE.
 
 

Authorisations

No data included in CBE.
 
 

Version of Nacebel codes for activities 2008(1)

Main activity: 25.50102 - Production and assembly of forged parts for construction: stair railings, balustrades, etc.
Since January 1, 2023
Main activity: 41.101 - Residential property development
Since January 1, 2023
Main activity: 41.102 - Non-residential property development
Since January 1, 2023
Main activity: 41.201 - General construction of residential buildings
Since January 1, 2023
Main activity: 41.20101 - Realisation of the main structure of individual houses
Since January 1, 2023
Main activity: 41.20102 - Construction of individual "turnkey" houses
Since January 1, 2023
Main activity: 41.20111 - Realisation of the main structure of multi-cellular buildings (apartments, etc.)
Since January 1, 2023
Main activity: 41.20112 - Realisation of "turnkey" apartments
Since January 1, 2023
Main activity: 41.20121 - Realisation of the structural work of buildings
Since January 1, 2023
Main activity: 41.203 - General construction of other non-residential buildings
Since January 1, 2023
Main activity: 41.20301 - Realisation of structural work on buildings and industrial or commercial structures, vehicle depots, warehouses, schools, clinics, buildings for the practice of worship, etc.
Since January 1, 2023
Main activity: 41.20302 - Assembly of hangars, barns, silos, etc., for agricultural use
Since January 1, 2023
Main activity: 42.990 - Construction of other civil engineering projects n.e.c.
Since January 1, 2023
Main activity: 42.99001 - Construction of playgrounds and sports fields, swimming pools, etc.
Since January 1, 2023
Main activity: 43.110 - Demolition works
Since January 1, 2023
Main activity: 43.11001 - Demolition of buildings and other constructions
Since January 1, 2023
Main activity: 43.12001 - Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc.
Since January 1, 2023
Main activity: 43.291 - Insulation works
Since January 1, 2023
Main activity: 43.320 - Joinery works
Since January 1, 2023
Main activity: 43.32001 - Assembly of exterior and interior joinery: doors, windows, staircases, fitted kitchen cupboards shop fittings, door and window frames, etc.
Since January 1, 2023
Main activity: 43.32002 - Assembly of wooden or plastic mobile walls; lining walls, ceilings etc.
Since January 1, 2023
Main activity: 43.32003 - Assembly of wooden or plastic garage doors, shutters, blinds, fences, gates etc.
Since January 1, 2023
Main activity: 43.32004 - Assembly of wooden or plastic armoured doors and firewall doors
Since January 1, 2023
Main activity: 43.32005 - Assembly of wooden or plastic greenhouses, verandas etc.
Since January 1, 2023
Main activity: 43.32011 - Assembly of external and internal metal joinery: doors, windows, door and window frames, staircases, fitted kitchen cupboards, shop fittings, etc.
Since January 1, 2023
Main activity: 43.32012 - Assembly of metal mobile walls; lining walls, ceilings, etc.
Since January 1, 2023
Main activity: 43.32013 - Assembly of metal garage doors, shutters, blinds, fences, gates, etc.
Since January 1, 2023
Main activity: 43.32014 - Assembly of metal armoured doors and fire doors
Since January 1, 2023
Main activity: 43.32015 - Assembly of metal greenhouses, verandas, etc.
Since January 1, 2023
Main activity: 43.32016 - Assembly of exterior and interior plastic joinery
Since January 1, 2023
Main activity: 43.32021 - Installation of glass interior doors, partition walls, etc.
Since January 1, 2023
Main activity: 43.332 - Fitting of wood coverings for floors and walls
Since January 1, 2023
Main activity: 43.33201 - Fitting in buildings or other construction projects of: parquet and other wood floors, wooden wall coverings
Since January 1, 2023
Main activity: 43.343 - Glaziery
Since January 1, 2023
Main activity: 43.34301 - Fitting of glass, mirrors, etc.
Since January 1, 2023
Main activity: 43.910 - Roofing works
Since January 1, 2023
Main activity: 43.91001 - Framework assembly
Since January 1, 2023
Main activity: 43.91002 - Covering work using all materials
Since January 1, 2023
Main activity: 43.91003 - Installation of draining elements for rainwater
Since January 1, 2023
Main activity: 43.991 - Waterproofing of walls
Since January 1, 2023
Main activity: 43.99101 - Waterproofing of roofs and roof terraces
Since January 1, 2023
Main activity: 43.99111 - Treatment of walls with water repellent products
Since January 1, 2023
Main activity: 43.99301 - Construction of decorative fireplaces and open fireplaces
Since January 1, 2023
Main activity: 43.994 - Masonry and repointing
Since January 1, 2023
Main activity: 43.99401 - Masonry
Since January 1, 2023
Main activity: 43.995 - Building restoration works
Since January 1, 2023
Main activity: 43.999 - Other specialised construction activities
Since January 1, 2023
Main activity: 43.99901 - Establishment of foundations, including pile driving
Since January 1, 2023
Main activity: 43.99902 - Formwork and rebar work
Since January 1, 2023
Main activity: 43.99903 - Construction of chimneys and industrial ovens
Since January 1, 2023
Main activity: 43.99904 - Installation of steel structure elements not manufactured by the unit carrying out the work
Since January 1, 2023
Main activity: 43.99906 - Assembly and disassembly of scaffolding and work platforms
Since January 1, 2023
Main activity: 71.121 - Engineering and technical consultancy activities, except surveying activities
Since January 1, 2023
Main activity: 74.909 - Other professional, scientific and technical activities
Since January 1, 2023
Main activity: 81.220 - Other building and industrial cleaning activities
Since January 1, 2023
Main activity: 81.22001 - Interior cleaning of buildings of all types: offices, factories, workshops, premises of institutions and other premises for commercial or professional use, apartment buildings, etc.
Since January 1, 2023
Main activity: 81.22003 - Chimney sweeping and cleaning of hearths, furnaces, boiler incinerators, ventilation ducts and smoke evacuation devices
Since January 1, 2023
 
 

(1)The EC-classification of the Nacebel codes has changed on 1/1/2008. Both the Nacebel codification of 2003 and 2008 are available in Public Search. The 2003 codes were valid until 31/12/2007. On 1/1/2008, the new codification became valid. This was a mere administrative conversion : no activities of the entity or establishment unit have thus been changed.