Establishment unit data
In general | |||||
| Enterprise number: | 0800.370.952 | ||||
| Status of the entity: | Active | ||||
| Number of the establishment unit: | 2.344.167.128 | ||||
| Status of the establishment unit: | Active | ||||
| Start date: | April 4, 2023 | ||||
| Name of the establishment unit: |
MEM CONSTRUCT Name in French, since April 4, 2023 | ||||
| Address of the establishment unit: |
Rue Plein-Vent(BLN) 10
4837 Baelen Since April 4, 2023 | ||||
| Phone number: | No information found in the CBE. | ||||
| Fax: | No information found in the CBE. | ||||
| Email address: |
| ||||
| Web address: | No information found in the CBE. | ||||
| | |||||
Authorisations | |||||
| No data included in CBE. | |||||
| Licences registered with the Federal Agency for the Safety of the Food Chain (FASFC) Click here | |||||
| | |||||
Version of Nacebel codes for activities 2025(1) | |||||
| Main activity: 43.222
- Installation of heating, ventilating, air conditioning, refrigeration installations powered by electricity Since January 1, 2025 | |||||
| Main activity: 01.620
- Support activities for animal production Since January 1, 2025 | |||||
| Main activity: 43.310
- Plastering Since January 1, 2025 | |||||
| Main activity: 43.422
- Laying of screeds Since January 1, 2025 | |||||
| Main activity: 43.32006
- Assembly of external and internal metal joinery: doors, windows, door and window frames, staircases, fitted kitchen cupboards, shop fittings, etc Since January 1, 2025 | |||||
| Main activity: 43.99001
- Formwork and rebar work Since January 1, 2025 | |||||
| Main activity: 41.00302
- Assembly of hangars, barns, silos, etc, for agricultural use Since January 1, 2025 | |||||
| Main activity: 42.219
- Construction of utility projects for fluids nec Since January 1, 2025 | |||||
| Main activity: 43.12001
- Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc Since January 1, 2025 | |||||
| Main activity: 43.223
- Installation of heating, ventilating, air conditioning, refrigeration installations powered by energy sources other than electricity Since January 1, 2025 | |||||
| Main activity: 42.212
- Construction of waste water disposal systems Since January 1, 2025 | |||||
| Main activity: 81.300
- Landscape service activities Since January 1, 2025 | |||||
| Main activity: 42.220
- Construction of utility projects for electricity and telecommunications Since January 1, 2025 | |||||
| Main activity: 28.410
- Manufacture of metal forming machinery and machine tools for metal work Since January 1, 2025 | |||||
| Main activity: 41.00301
- Realisation of structural work on buildings and industrial or commercial structures, vehicle depots, warehouses, schools, clinics, buildings for the practice of worship, etc Since January 1, 2025 | |||||
| Main activity: 25.530
- Machining of metals Since January 1, 2025 | |||||
| Main activity: 25.639
- Manufacture of tools, except moulds and models Since January 1, 2025 | |||||
| Main activity: 25.110
- Manufacture of metal structures and parts of structures Since January 1, 2025 | |||||
| Main activity: 43.320
- Joinery installation Since January 1, 2025 | |||||
| Main activity: 43.12004
- Drainage of agricultural or forestry land Since January 1, 2025 | |||||
| Main activity: 01.610
- Support activities for crop production Since January 1, 2025 | |||||
| Main activity: 43.332
- Floor and wall covering with wood Since January 1, 2025 | |||||
| Main activity: 43.32002
- Assembly of wooden or plastic mobile walls; lining walls, ceilings etc Since January 1, 2025 | |||||
| Main activity: 43.32005
- Assembly of wooden or plastic greenhouses, verandas etc Since January 1, 2025 | |||||
| Main activity: 43.32012
- Installation of glass interior doors, partition walls, etc Since January 1, 2025 | |||||
| Main activity: 43.32001
- Assembly of exterior and interior joinery: doors, windows, staircases, fitted kitchen cupboards shop fittings, door and window frames, etc Since January 1, 2025 | |||||
| Main activity: 43.230
- Installation of insulation Since January 1, 2025 | |||||
| Main activity: 42.120
- Construction of railways and underground railways Since January 1, 2025 | |||||
| Main activity: 41.00101
- Realisation of the main structure of individual houses Since January 1, 2025 | |||||
| Main activity: 41.00103
- Realisation of the main structure of multi-cellular buildings (apartments, etc) Since January 1, 2025 | |||||
| Main activity: 41.00105
- Realisation of the structural work of buildings Since January 1, 2025 | |||||
| Main activity: 43.32008
- Assembly of metal garage doors, shutters, blinds, fences, gates, etc Since January 1, 2025 | |||||
| Main activity: 43.110
- Demolition Since January 1, 2025 | |||||
| Main activity: 43.32010
- Assembly of metal greenhouses, verandas, etc Since January 1, 2025 | |||||
| Main activity: 43.42901
- Establishment of foundations, including pile driving Since January 1, 2025 | |||||
| Main activity: 81.22003
- Chimney sweeping and cleaning of hearths, furnaces, boiler incinerators, ventilation ducts and smoke evacuation devices Since January 1, 2025 | |||||
| Main activity: 43.32004
- Assembly of wooden or plastic armoured doors and firewall doors Since January 1, 2025 | |||||
| Main activity: 43.32003
- Assembly of wooden or plastic garage doors, shutters, blinds, fences, gates etc Since January 1, 2025 | |||||
| Main activity: 43.910
- Masonry and bricklaying activities Since January 1, 2025 | |||||
| Main activity: 43.421
- Waterproofing of walls Since January 1, 2025 | |||||
| Main activity: 43.99003
- Assembly and disassembly of scaffolding and work platforms Since January 1, 2025 | |||||
| Main activity: 43.32009
- Assembly of metal armoured doors and fire doors Since January 1, 2025 | |||||
| Main activity: 43.343
- Glazing Since January 1, 2025 | |||||
| Main activity: 43.32011
- Assembly of exterior and interior plastic joinery Since January 1, 2025 | |||||
| Main activity: 42.110
- Construction of roads and motorways Since January 1, 2025 | |||||
| Main activity: 42.99001
- Construction of playgrounds and sports fields, swimming pools, etc Since January 1, 2025 | |||||
| Main activity: 43.32013
- Assembly of gypsum drywalls Since January 1, 2025 | |||||
| Main activity: 43.32007
- Assembly of metal mobile walls; lining walls, ceilings, etc Since January 1, 2025 | |||||
| Main activity: 43.331
- Floor and wall covering with tiles Since January 1, 2025 | |||||
| Main activity: 42.211
- Construction of water and gas distribution networks Since January 1, 2025 | |||||
| Show the NACE-BEL codes activities version 2008. | |||||
| |
(1)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). Activities registered of the NACE-BEL codes (version 2003) were stopped on 31/12/2007, automatically converted to the NACE-BEL codes (version 2008) and registered with a start date of 01/01/2008. This was a mere administrative conversion and no modification of the activity itself.
(2)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). Following a conversion of activities with a NACE-BEL code (2003 version) to NACE-BEL codes (2008 version), the start date of activities (2008 version) is 1/01/2008. Activities with a NACE-BEL code (2008 version) were then stopped on 31/12/2024 and automatically converted to NACE-BEL codes (2025 version). These were mere administrative conversion and no modification of the activity itself. The 2003 activities can be accessed by clicking on the link : "Show the NACE-BEL codes activities version 2003".

