shadow
The English version of the Public Search application constitutes an unofficial English translation and is provided for information purposes only.
No legal rights can therefore be derived from this translation. For the official application, please consult the Dutch, French or German versions of the Public Search application.


Establishment unit data

In general

Enterprise number:0800.507.049
Status of the entity:Active
Number of the establishment unit:2.344.358.257
Status of the establishment unit:Active
Start date:April 6, 2023
Name of the establishment unit: Alpha Energie
Name in Dutch, since April 6, 2023
Address of the establishment unit:
Leopoldstraat   88
2570   Duffel
Since April 6, 2023
Phone number:No information found in the CBE.
Fax:No information found in the CBE.
Email address:No information found in the CBE.
Web address:No information found in the CBE.
 
 

Authorisations

No data included in CBE.
 
 

Version of Nacebel codes for activities 2008(1)

Main activity: 43.211 - Electrotechnical installation work for buildings
Since April 6, 2023
Main activity: 43.21101 - Installation of electrical wiring and fittings
Since April 6, 2023
Main activity: 43.21102 - Installation of telecommunication systems and computer facilities
Since April 6, 2023
Main activity: 43.21103 - Installation of surveillance and alarm systems against intruders
Since April 6, 2023
Main activity: 43.212 - Electrotechnical installation work other than buildings
Since April 6, 2023
Main activity: 43.21201 - Installation of illumination and signalling systems for roads, railways, airports and port facilities (including the installation of traffic signs)
Since April 6, 2023
Main activity: 43.221 - Plumbing works
Since April 6, 2023
Main activity: 43.22101 - Installation in buildings or other structures of: plumbing and sanitary facilities, pipes, gas and water connections (except for heating), installation of automatic fire extinguishing systems, etc.
Since April 6, 2023
Main activity: 43.222 - Installation of heating, ventilation and air conditioning
Since April 6, 2023
Main activity: 43.22201 - Installation in buildings or other construction projects of: heating systems, electricity, gas and oil-fired boilers, ventilation and air conditioning material and ducting, etc.
Since April 6, 2023
Main activity: 43.22202 - Installation of heating, cooling and ventilation systems (except heating)
Since April 6, 2023
Main activity: 43.22211 - Installation of electrical heating systems
Since April 6, 2023
Main activity: 43.291 - Insulation works
Since April 6, 2023
Main activity: 43.299 - Other installation works n.e.c.
Since April 6, 2023
Main activity: 43.29901 - Installation of blinds and awnings
Since April 6, 2023
Main activity: 43.29902 - Installation of signs, illuminated or not
Since April 6, 2023
Main activity: 43.29903 - Other installation works n.e.s., including installation of accessories
Since April 6, 2023
Main activity: 43.29904 - General installation work
Since April 6, 2023
Main activity: 43.29911 - Installation of lifts and escalators
Since April 6, 2023
Main activity: 43.29912 - Installation of building aerials and lightning rods
Since April 6, 2023
Main activity: 43.320 - Joinery works
Since April 6, 2023
Main activity: 43.32001 - Assembly of exterior and interior joinery: doors, windows, staircases, fitted kitchen cupboards shop fittings, door and window frames, etc.
Since April 6, 2023
Main activity: 43.32002 - Assembly of wooden or plastic mobile walls; lining walls, ceilings etc.
Since April 6, 2023
Main activity: 43.32003 - Assembly of wooden or plastic garage doors, shutters, blinds, fences, gates etc.
Since April 6, 2023
Main activity: 43.32004 - Assembly of wooden or plastic armoured doors and firewall doors
Since April 6, 2023
Main activity: 43.32005 - Assembly of wooden or plastic greenhouses, verandas etc.
Since April 6, 2023
Main activity: 43.32011 - Assembly of external and internal metal joinery: doors, windows, door and window frames, staircases, fitted kitchen cupboards, shop fittings, etc.
Since April 6, 2023
Main activity: 43.32012 - Assembly of metal mobile walls; lining walls, ceilings, etc.
Since April 6, 2023
Main activity: 43.32013 - Assembly of metal garage doors, shutters, blinds, fences, gates, etc.
Since April 6, 2023
Main activity: 43.32014 - Assembly of metal armoured doors and fire doors
Since April 6, 2023
Main activity: 43.32015 - Assembly of metal greenhouses, verandas, etc.
Since April 6, 2023
Main activity: 43.32016 - Assembly of exterior and interior plastic joinery
Since April 6, 2023
Main activity: 43.32021 - Installation of glass interior doors, partition walls, etc.
Since April 6, 2023
Main activity: 43.32031 - Assembly of gypsum drywalls
Since April 6, 2023
Main activity: 43.331 - Tiling of floors and walls
Since April 6, 2023
Main activity: 43.33101 - Fitting in buildings or other construction projects of: wall coverings or ceramic, concrete or stone tiles; granite flooring and wall coverings, etc.
Since April 6, 2023
Main activity: 43.332 - Fitting of wood coverings for floors and walls
Since April 6, 2023
Main activity: 43.33201 - Fitting in buildings or other construction projects of: parquet and other wood floors, wooden wall coverings
Since April 6, 2023
Main activity: 43.991 - Waterproofing of walls
Since April 6, 2023
Main activity: 43.99101 - Waterproofing of roofs and roof terraces
Since April 6, 2023
Main activity: 43.99111 - Treatment of walls with water repellent products
Since April 6, 2023
Main activity: 43.994 - Masonry and repointing
Since April 6, 2023
Main activity: 43.99401 - Masonry
Since April 6, 2023
Main activity: 43.995 - Building restoration works
Since April 6, 2023
 
 

Version of the Nacebel codes for the NSSO-activities 2008(1)

Main activity: 43.211 - Electrotechnical installation work for buildings
Since July 1, 2023
 
 

(1)The EC-classification of the Nacebel codes has changed on 1/1/2008. Both the Nacebel codification of 2003 and 2008 are available in Public Search. The 2003 codes were valid until 31/12/2007. On 1/1/2008, the new codification became valid. This was a mere administrative conversion : no activities of the entity or establishment unit have thus been changed.