Establishment unit data
In general | |||
Enterprise number: | 0802.881.569 | ||
Status of the entity: | Active | ||
Number of the establishment unit: | 2.347.544.906 | ||
Status of the establishment unit: | Active | ||
Start date: | June 19, 2023 | ||
Name of the establishment unit: |
MOROE CONSTRUCT Name in French, since June 19, 2023 | ||
Address of the establishment unit: |
Antheunisstraat (Gentil) 24
1500 Halle Since June 19, 2023 Ex officio striked off address since July 17, 2024(1) | ||
Phone number: | No information found in the CBE. | ||
Fax: | No information found in the CBE. | ||
Email address: | No information found in the CBE. | ||
Web address: | No information found in the CBE. | ||
| |||
Authorisations | |||
No data included in CBE. | |||
| |||
Version of Nacebel codes for activities 2008(2) | |||
Main activity: 24.100 - Manufacture of basic iron and steel and of ferro-alloys Since June 19, 2023 | |||
Main activity: 24.200 - Manufacture of tubes, pipes, hollow profiles and related fittings, of steel Since June 19, 2023 | |||
Main activity: 24.20001 - Manufacture of tubes welded and cold forming or hot welding, by forming and cold drawing or by forming and hot reduction Since June 19, 2023 | |||
Main activity: 24.20002 - Manufacture of steel pipe fittings: flat flanges and flange forged steel accessories butt welding steel, threaded fittings and other steel accessories Since June 19, 2023 | |||
Main activity: 24.310 - Cold drawing of bars Since June 19, 2023 | |||
Main activity: 24.320 - Cold rolling of narrow strip Since June 19, 2023 | |||
Main activity: 24.32001 - Production of rolled flat steel products, uncoated or coated, in coils or not, of a width not exceeding 600 mm, obtained by cold re-rolling of hot rolled flat products Since June 19, 2023 | |||
Main activity: 24.330 - Cold forming or folding Since June 19, 2023 | |||
Main activity: 24.340 - Cold drawing of wire Since June 19, 2023 | |||
Main activity: 24.34001 - Thread steel fabrication by drawing and cold drawing Since June 19, 2023 | |||
Main activity: 24.410 - Production of precious metals Since June 19, 2023 | |||
Main activity: 24.41001 - Production of precious metal alloys Since June 19, 2023 | |||
Main activity: 24.420 - Aluminium production Since June 19, 2023 | |||
Main activity: 24.430 - Lead, zinc and tin production Since June 19, 2023 | |||
Main activity: 24.440 - Copper production Since June 19, 2023 | |||
Main activity: 24.450 - Other non-ferrous metal production Since June 19, 2023 | |||
Main activity: 24.460 - Processing of nuclear fuel Since June 19, 2023 | |||
Main activity: 24.51001 - Casting of finished or semi-finished iron products Since June 19, 2023 | |||
Main activity: 41.101 - Residential property development Since June 19, 2023 | |||
Main activity: 41.10101 - Real estate development of new residential houses or renovations Since June 19, 2023 | |||
Main activity: 41.10102 - Property development of residential buildings Since June 19, 2023 | |||
Main activity: 41.102 - Non-residential property development Since June 19, 2023 | |||
Main activity: 41.10201 - Real estate development of offices Since June 19, 2023 | |||
Main activity: 41.10211 - Real estate development of: commercial and industrial centres, hotels, business areas and markets, marinas, ski resorts, etc. Since June 19, 2023 | |||
Main activity: 41.10212 - Development or renovation of urban areas by promotion Since June 19, 2023 | |||
Main activity: 41.201 - General construction of residential buildings Since June 19, 2023 | |||
Main activity: 41.20101 - Realisation of the main structure of individual houses Since June 19, 2023 | |||
Main activity: 41.20102 - Construction of individual "turnkey" houses Since June 19, 2023 | |||
Main activity: 41.20112 - Realisation of "turnkey" apartments Since June 19, 2023 | |||
Main activity: 41.20121 - Realisation of the structural work of buildings Since June 19, 2023 | |||
Main activity: 41.20122 - General coordination on the construction site Since June 19, 2023 | |||
Main activity: 41.202 - General construction of office buildings Since June 19, 2023 | |||
Main activity: 41.203 - General construction of other non-residential buildings Since June 19, 2023 | |||
Main activity: 41.20302 - Assembly of hangars, barns, silos, etc., for agricultural use Since June 19, 2023 | |||
Main activity: 43.110 - Demolition works Since June 19, 2023 | |||
Main activity: 43.11001 - Demolition of buildings and other constructions Since June 19, 2023 | |||
Main activity: 43.120 - Site preparation works Since June 19, 2023 | |||
Main activity: 43.12001 - Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc. Since June 19, 2023 | |||
Main activity: 43.12002 - Site preparation for mining: overburden removal and other development and preparation of land and mining sites Since June 19, 2023 | |||
Main activity: 43.12003 - Lowering of the water table and drainage of construction sites Since June 19, 2023 | |||
Main activity: 43.12004 - Drainage of agricultural or forestry land Since June 19, 2023 | |||
Main activity: 43.12011 - Clearing of building sites Since June 19, 2023 | |||
Main activity: 43.130 - Test drilling and surveys Since June 19, 2023 | |||
Main activity: 43.13001 - Test surveys, test drilling and core sampling for construction as well as for geophysical or geological studies, or similar Since June 19, 2023 | |||
Main activity: 43.13002 - Execution of horizontal drilling for cable glands or ducts Since June 19, 2023 | |||
Main activity: 43.211 - Electrotechnical installation work for buildings Since June 19, 2023 | |||
Main activity: 43.21101 - Installation of electrical wiring and fittings Since June 19, 2023 | |||
Main activity: 43.21102 - Installation of telecommunication systems and computer facilities Since June 19, 2023 | |||
Main activity: 43.21103 - Installation of surveillance and alarm systems against intruders Since June 19, 2023 | |||
Main activity: 43.212 - Electrotechnical installation work other than buildings Since June 19, 2023 | |||
Main activity: 43.21201 - Installation of illumination and signalling systems for roads, railways, airports and port facilities (including the installation of traffic signs) Since June 19, 2023 | |||
Main activity: 43.221 - Plumbing works Since June 19, 2023 | |||
Main activity: 43.22101 - Installation in buildings or other structures of: plumbing and sanitary facilities, pipes, gas and water connections (except for heating), installation of automatic fire extinguishing systems, etc. Since June 19, 2023 | |||
Main activity: 43.222 - Installation of heating, ventilation and air conditioning Since June 19, 2023 | |||
Main activity: 43.22201 - Installation in buildings or other construction projects of: heating systems, electricity, gas and oil-fired boilers, ventilation and air conditioning material and ducting, etc. Since June 19, 2023 | |||
Main activity: 43.22202 - Installation of heating, cooling and ventilation systems (except heating) Since June 19, 2023 | |||
Main activity: 43.291 - Insulation works Since June 19, 2023 | |||
Main activity: 43.29101 - Implementation in buildings or other construction projects of: thermal insulation, acoustic and anti vibration insulation Since June 19, 2023 | |||
Main activity: 43.29102 - Insulation work for heating or cooling pipes Since June 19, 2023 | |||
Main activity: 43.29103 - Insulation work for cold storage or refrigerated warehouses Since June 19, 2023 | |||
Main activity: 43.299 - Other installation works n.e.c. Since June 19, 2023 | |||
Main activity: 43.29901 - Installation of blinds and awnings Since June 19, 2023 | |||
Main activity: 43.29902 - Installation of signs, illuminated or not Since June 19, 2023 | |||
Main activity: 43.29903 - Other installation works n.e.s., including installation of accessories Since June 19, 2023 | |||
Main activity: 43.29904 - General installation work Since June 19, 2023 | |||
Main activity: 43.29911 - Installation of lifts and escalators Since June 19, 2023 | |||
Main activity: 43.29912 - Installation of building aerials and lightning rods Since June 19, 2023 | |||
Main activity: 43.910 - Roofing works Since June 19, 2023 | |||
Main activity: 43.91001 - Framework assembly Since June 19, 2023 | |||
Main activity: 43.91002 - Covering work using all materials Since June 19, 2023 | |||
Main activity: 43.91003 - Installation of draining elements for rainwater Since June 19, 2023 | |||
Main activity: 43.991 - Waterproofing of walls Since June 19, 2023 | |||
Main activity: 43.99101 - Waterproofing of roofs and roof terraces Since June 19, 2023 | |||
Main activity: 43.99111 - Treatment of walls with water repellent products Since June 19, 2023 | |||
Main activity: 43.992 - Restoration of façades Since June 19, 2023 | |||
Main activity: 43.99201 - Steam cleaning, sand blasting and similar activities for building exteriors Since June 19, 2023 | |||
Main activity: 43.993 - Construction of decorative fireplaces and open fireplaces Since June 19, 2023 | |||
Main activity: 43.99301 - Construction of decorative fireplaces and open fireplaces Since June 19, 2023 | |||
Main activity: 43.994 - Masonry and repointing Since June 19, 2023 | |||
Main activity: 43.99401 - Masonry Since June 19, 2023 | |||
Main activity: 43.99402 - Execution of repointing Since June 19, 2023 | |||
Main activity: 43.995 - Building restoration works Since June 19, 2023 | |||
Main activity: 43.996 - Screed laying Since June 19, 2023 | |||
Main activity: 43.99601 - Screed laying Since June 19, 2023 | |||
Main activity: 43.999 - Other specialised construction activities Since June 19, 2023 | |||
Main activity: 43.99901 - Establishment of foundations, including pile driving Since June 19, 2023 | |||
Main activity: 43.99902 - Formwork and rebar work Since June 19, 2023 | |||
Main activity: 43.99903 - Construction of chimneys and industrial ovens Since June 19, 2023 | |||
Main activity: 43.99904 - Installation of steel structure elements not manufactured by the unit carrying out the work Since June 19, 2023 | |||
Main activity: 43.99905 - Execution of lifting work for third parties Since June 19, 2023 | |||
Main activity: 43.99906 - Assembly and disassembly of scaffolding and work platforms Since June 19, 2023 | |||
Main activity: 43.99907 - Construction of cold rooms, vaults, etc. Since June 19, 2023 | |||
Main activity: 43.99911 - Rental of construction equipment with operator Since June 19, 2023 | |||
Main activity: 43.99921 - Execution of underwater work of all kinds Since June 19, 2023 | |||
Main activity: 43.99931 - Installation of private swimming pools Since June 19, 2023 | |||
Main activity: 53.100 - Postal activities under a universal service obligation Since June 19, 2023 | |||
Main activity: 53.10001 - Collection, routing and distribution of mail and parcels Since June 19, 2023 | |||
Main activity: 53.10002 - Collection of mail and parcels in public mailboxes or post offices Since June 19, 2023 | |||
Main activity: 53.10003 - Distribution and delivery of mail and parcels Since June 19, 2023 | |||
Main activity: 53.200 - Other postal and courier activities Since June 19, 2023 | |||
Main activity: 53.20001 - Collection, routing and distribution of letters, parcels and parcels by enterprises other than the national postal administration. One or more methods of transport may be used. Since June 19, 2023 | |||
Main activity: 63.110 - Data processing, hosting and related activities Since June 19, 2023 | |||
Main activity: 63.11001 - Continuous or non-continuous processing of data using either the customer's programme or a manufacturer-specific programme: data entry services, complete data processing Since June 19, 2023 | |||
Main activity: 63.11002 - Management and ongoing operation of computer hardware owned by third parties Since June 19, 2023 | |||
Main activity: 63.11011 - Creation of databases by assembly and possible interpretation of data from one or more sources: schedules, industrial catalogues, scientific data, etc. Since June 19, 2023 | |||
Main activity: 63.11013 - Provision of databases: provision of data to users (individual or grouped), in a certain order or sequence, by direct access (online) or extraction Since June 19, 2023 | |||
Main activity: 63.120 - Web portals Since June 19, 2023 |
|
(1)When an address is ex officio striked off, this indicates that the entity, the establishment unit or the branch is not longer situated at the registered address.
(2)The EC-classification of the Nacebel codes has changed on 1/1/2008. Both the Nacebel codification of 2003 and 2008 are available in Public Search. The 2003 codes were valid until 31/12/2007. On 1/1/2008, the new codification became valid. This was a mere administrative conversion : no activities of the entity or establishment unit have thus been changed.