Establishment unit data
In general | |||
Enterprise number: | 0804.808.505 | ||
Status of the entity: | Active | ||
Number of the establishment unit: | 2.349.051.572 | ||
Status of the establishment unit: | Active | ||
Start date: | August 5, 2023 | ||
Name of the establishment unit: |
Algemene werken Claes Name in Dutch, since August 5, 2023 | ||
Address of the establishment unit: |
Dorpsstraat 108
3940 Hechtel-Eksel Since August 5, 2023 | ||
Phone number: | No information found in the CBE. | ||
Fax: | No information found in the CBE. | ||
Email address: | No information found in the CBE. | ||
Web address: | No information found in the CBE. | ||
| |||
Authorisations | |||
No data included in CBE. | |||
| |||
Version of Nacebel codes for activities 2008(1) | |||
Main activity: 42.211
- Construction of water and gas distribution networks Since August 5, 2023 | |||
Main activity: 42.219
- Construction of networks for fluids n.e.c. Since August 5, 2023 | |||
Main activity: 42.21911
- Construction of water supply, distribution and drainage networks Since August 5, 2023 | |||
Main activity: 42.21912
- Construction of networks to transport gas, petroleum products, etc. Since August 5, 2023 | |||
Main activity: 42.220
- Construction of electricity and telecommunications networks Since August 5, 2023 | |||
Main activity: 42.22001
- Construction of electrical energy transmission and distribution lines Since August 5, 2023 | |||
Main activity: 42.22002
- Construction of telecommunication lines and networks Since August 5, 2023 | |||
Main activity: 43.11001
- Demolition of buildings and other constructions Since August 5, 2023 | |||
Main activity: 43.120
- Site preparation works Since August 5, 2023 | |||
Main activity: 43.12001
- Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc. Since August 5, 2023 | |||
Main activity: 43.12011
- Clearing of building sites Since August 5, 2023 | |||
Main activity: 43.130
- Test drilling and surveys Since August 5, 2023 | |||
Main activity: 43.13001
- Test surveys, test drilling and core sampling for construction as well as for geophysical or geological studies, or similar Since August 5, 2023 | |||
Main activity: 43.13002
- Execution of horizontal drilling for cable glands or ducts Since August 5, 2023 | |||
Main activity: 43.211
- Electrotechnical installation work for buildings Since August 5, 2023 | |||
Main activity: 43.21101
- Installation of electrical wiring and fittings Since August 5, 2023 | |||
Main activity: 43.212
- Electrotechnical installation work other than buildings Since August 5, 2023 | |||
Main activity: 43.291
- Insulation works Since August 5, 2023 | |||
Main activity: 43.29101
- Implementation in buildings or other construction projects of: thermal insulation, acoustic and anti vibration insulation Since August 5, 2023 | |||
Main activity: 43.31001
- Application in buildings or other construction projects of plaster or stucco for interiors or exteriors, including related lathing materials Since August 5, 2023 | |||
Main activity: 43.32031
- Assembly of gypsum drywalls Since August 5, 2023 | |||
Main activity: 43.341
- Painting of buildings Since August 5, 2023 | |||
Main activity: 82.990
- Other business support service activities n.e.c. Since August 5, 2023 |
|
(1)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). There are different versions of these codes. Activities with a NACE-BEL code (version 2003) were stopped on 31/12/2007 and automatically converted to the new NACE-BEL codes (2008 version) starting on 01/01/2008. A new 2025 version of the codes will enter into force on 01/01/2025. During the first half of the year 2025, all activities with a 2008 version of the NACE-BEL code will be phased out with 31/12/2024 as end date and automatically converted to the 2025 version of the NACE-BEL codes, starting on 01/01/2025. Up until then, activities will continue to be registered using the 2008 NACE-BEL codes.