Attention! This establishment unit has been stopped. Therefore, the shown data reflect the situation at the moment of cessation of the establishment unit.
Establishment unit data
In general | |||
Enterprise number: | 0826.314.195 | ||
Status of the entity: | Stopped | ||
Number of the establishment unit: | 2.287.289.395 | ||
Status of the establishment unit: | Stopped Since May 1, 2019 | ||
Start date: | May 1, 2019 | ||
Name of the establishment unit: |
Noje, Liviu Name in French, since May 1, 2019 | ||
Address of the establishment unit: |
Heuvelstraat 78
1730 Asse Since May 1, 2019 | ||
Phone number: | No information found in the CBE. | ||
Fax: | No information found in the CBE. | ||
Email address: | No information found in the CBE. | ||
Web address: | No information found in the CBE. | ||
| |||
Authorisations | |||
No data included in CBE. | |||
Licences registered with the Federal Agency for the Safety of the Food Chain (FASFC) Click here | |||
| |||
Version of Nacebel codes for activities 2008(1) | |||
Main activity: 31.091
- Manufacture of dining rooms, lounges, bedrooms and bathrooms Since May 1, 2019 | |||
Main activity: 43.29103
- Insulation work for cold storage or refrigerated warehouses Since May 1, 2019 | |||
Main activity: 71.11302
- Design of gardens, parks, etc. Since May 1, 2019 | |||
Main activity: 43.29912
- Installation of building aerials and lightning rods Since May 1, 2019 | |||
Main activity: 43.29102
- Insulation work for heating or cooling pipes Since May 1, 2019 | |||
Main activity: 43.12001
- Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc. Since May 1, 2019 | |||
Main activity: 43.29904
- General installation work Since May 1, 2019 | |||
Main activity: 16.291
- Manufacture of other products of wood Since May 1, 2019 | |||
Main activity: 81.300
- Landscape service activities Since May 1, 2019 | |||
Main activity: 31.020
- Manufacture of kitchen furniture Since May 1, 2019 | |||
Main activity: 81.30001
- Pruning of trees and hedges Since May 1, 2019 | |||
Main activity: 42.91102
- Cleaning of rivers, ditches, etc. Since May 1, 2019 | |||
Main activity: 81.210
- General cleaning of buildings Since May 1, 2019 | |||
Main activity: 42.91101
- Realisation of dredging works Since May 1, 2019 | |||
Main activity: 43.99201
- Steam cleaning, sand blasting and similar activities for building exteriors Since May 1, 2019 | |||
Main activity: 43.12004
- Drainage of agricultural or forestry land Since May 1, 2019 | |||
Main activity: 43.12003
- Lowering of the water table and drainage of construction sites Since May 1, 2019 | |||
Main activity: 31.092
- Manufacture of garden and outdoor furniture Since May 1, 2019 | |||
Main activity: 81.220
- Other building and industrial cleaning activities Since May 1, 2019 | |||
Main activity: 81.30002
- Creation and maintenance of gardens, parks and green spaces for sports facilities Since May 1, 2019 | |||
Main activity: 53.200
- Other postal and courier activities Since May 1, 2019 | |||
Main activity: 43.12011
- Clearing of building sites Since May 1, 2019 | |||
Main activity: 31.099
- Manufacture of other furniture n.e.c. Since May 1, 2019 | |||
Main activity: 43.99402
- Execution of repointing Since May 1, 2019 | |||
Main activity: 43.99906
- Assembly and disassembly of scaffolding and work platforms Since May 1, 2019 | |||
Main activity: 31.010
- Manufacture of office and shop furniture Since May 1, 2019 | |||
Main activity: 43.29101
- Implementation in buildings or other construction projects of: thermal insulation, acoustic and anti vibration insulation Since May 1, 2019 | |||
Main activity: 43.99905
- Execution of lifting work for third parties Since May 1, 2019 | |||
Main activity: 16.210
- Manufacture of veneer sheets and wood-based panels Since May 1, 2019 | |||
Main activity: 43.12002
- Site preparation for mining: overburden removal and other development and preparation of land and mining sites Since May 1, 2019 | |||
Main activity: 43.13001
- Test surveys, test drilling and core sampling for construction as well as for geophysical or geological studies, or similar Since May 1, 2019 | |||
Main activity: 43.39002
- Other building completion and finishing work n.e.s. Since May 1, 2019 | |||
Main activity: 43.13002
- Execution of horizontal drilling for cable glands or ducts Since May 1, 2019 | |||
Main activity: 43.39001
- Cleaning of new buildings and rehabilitation of sites after work Since May 1, 2019 |
|
(1)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). Following a conversion of activities with a NACE-BEL code (2003 version) to NACE-BEL codes (2008 version), the start date of activities (2008 version) is 1/01/2008. Activities with a NACE-BEL code (2008 version) were then stopped on 31/12/2024 and automatically converted to NACE-BEL codes (2025 version). These were mere administrative conversion and no modification of the activity itself. The 2003 activities can be accessed by clicking on the link : "Show the NACE-BEL codes activities version 2003".