Establishment unit data
In general | |||
Enterprise number: | 0835.040.732 | ||
Status of the entity: | Active | ||
Number of the establishment unit: | 2.198.092.551 | ||
Status of the establishment unit: | Active | ||
Start date: | April 14, 2011 | ||
Name of the establishment unit: |
SORDO BOUWWERKEN Name in Dutch, since April 14, 2011 | ||
Address of the establishment unit: |
Timmerveldweg 25
3520 Zonhoven Since May 24, 2019 Ex officio striked off address since November 19, 2019(1) | ||
Phone number: | No information found in the CBE. | ||
Fax: | No information found in the CBE. | ||
Email address: | No information found in the CBE. | ||
Web address: | No information found in the CBE. | ||
| |||
Authorisations | |||
No data included in CBE. | |||
| |||
Version of Nacebel codes for activities 2008(2) | |||
Main activity: 41.20102 - Construction of individual "turnkey" houses Since April 14, 2011 | |||
Additional activity: 23.700 - Cutting, shaping and finishing of stone Since April 14, 2011 | |||
Additional activity: 23.70001 - Cutting, shaping and finishing of stone for the construction of buildings or roads, coverage roofs, etc. Since April 14, 2011 | |||
Additional activity: 25.11001 - Manufacture of metal frameworks or skeletons for construction Since April 14, 2011 | |||
Additional activity: 41.201 - General construction of residential buildings Since April 14, 2011 | |||
Additional activity: 41.20101 - Realisation of the main structure of individual houses Since April 14, 2011 | |||
Additional activity: 41.20111 - Realisation of the main structure of multi-cellular buildings (apartments, etc.) Since April 14, 2011 | |||
Additional activity: 41.20112 - Realisation of "turnkey" apartments Since April 14, 2011 | |||
Additional activity: 41.20121 - Realisation of the structural work of buildings Since April 14, 2011 | |||
Additional activity: 41.203 - General construction of other non-residential buildings Since April 14, 2011 | |||
Additional activity: 43.12001 - Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc. Since April 14, 2011 | |||
Additional activity: 43.291 - Insulation works Since April 14, 2011 | |||
Additional activity: 43.310 - Plastering works Since April 14, 2011 | |||
Additional activity: 43.32031 - Assembly of gypsum drywalls Since April 14, 2011 | |||
Additional activity: 43.99301 - Construction of decorative fireplaces and open fireplaces Since April 14, 2011 | |||
Additional activity: 43.99401 - Masonry Since April 14, 2011 | |||
Additional activity: 43.99402 - Execution of repointing Since April 14, 2011 | |||
Additional activity: 43.99601 - Screed laying Since April 14, 2011 | |||
Additional activity: 43.99901 - Establishment of foundations, including pile driving Since April 14, 2011 | |||
Additional activity: 43.99902 - Formwork and rebar work Since April 14, 2011 | |||
Additional activity: 43.99903 - Construction of chimneys and industrial ovens Since April 14, 2011 | |||
Additional activity: 43.99904 - Installation of steel structure elements not manufactured by the unit carrying out the work Since April 14, 2011 | |||
Additional activity: 43.99906 - Assembly and disassembly of scaffolding and work platforms Since April 14, 2011 | |||
Additional activity: 49.41003 - Transport of concrete, ready to use, not manufactured by the same unit Since April 14, 2011 | |||
Additional activity: 71.11103 - Supervision of construction work (structural work, installation, finishing work, etc.) Since April 14, 2011 | |||
Additional activity: 81.30002 - Creation and maintenance of gardens, parks and green spaces for sports facilities Since April 14, 2011 |
|
(1)When an address is ex officio striked off, this indicates that the entity, the establishment unit or the branch is not longer situated at the registered address.
(2)The EC-classification of the Nacebel codes has changed on 1/1/2008. Both the Nacebel codification of 2003 and 2008 are available in Public Search. The 2003 codes were valid until 31/12/2007. On 1/1/2008, the new codification became valid. This was a mere administrative conversion : no activities of the entity or establishment unit have thus been changed.