Establishment unit data
In general | |||
Enterprise number: | 0841.463.221 | ||
Status of the entity: | Active | ||
Number of the establishment unit: | 2.204.906.901 | ||
Status of the establishment unit: | Active | ||
Start date: | December 1, 2011 | ||
Name of the establishment unit: |
WM Bouw Name in Dutch, since August 9, 2022 | ||
Address of the establishment unit: |
Sterrebos 101
3512 Hasselt Since January 1, 2025(1) | ||
Phone number: | No information found in the CBE. | ||
Fax: | No information found in the CBE. | ||
Email address: | No information found in the CBE. | ||
Web address: | No information found in the CBE. | ||
| |||
Authorisations | |||
No data included in CBE. | |||
| |||
Version of Nacebel codes for activities 2008(2) | |||
Main activity: 41.201 - General construction of residential buildings Since August 9, 2022 | |||
Main activity: 41.20101 - Realisation of the main structure of individual houses Since August 9, 2022 | |||
Main activity: 41.20102 - Construction of individual "turnkey" houses Since August 9, 2022 | |||
Main activity: 41.20111 - Realisation of the main structure of multi-cellular buildings (apartments, etc.) Since August 9, 2022 | |||
Main activity: 41.20112 - Realisation of "turnkey" apartments Since August 9, 2022 | |||
Main activity: 41.202 - General construction of office buildings Since August 9, 2022 | |||
Main activity: 41.203 - General construction of other non-residential buildings Since August 9, 2022 | |||
Main activity: 42.11001 - Construction of motorways, roads, streets, pavements and other vehicular and pedestrian roads (including the installation of crash barriers) Since August 9, 2022 | |||
Main activity: 42.212 - Construction of drainage systems for waste water Since August 9, 2022 | |||
Main activity: 42.91101 - Realisation of dredging works Since August 9, 2022 | |||
Main activity: 42.91102 - Cleaning of rivers, ditches, etc. Since August 9, 2022 | |||
Main activity: 42.91902 - Construction of dams and dykes Since August 9, 2022 | |||
Main activity: 42.91904 - Construction of locks and other regulating structures Since August 9, 2022 | |||
Main activity: 42.91905 - Construction of settling ponds and other structures for waste water treatment Since August 9, 2022 | |||
Main activity: 43.110 - Demolition works Since August 9, 2022 | |||
Main activity: 43.11001 - Demolition of buildings and other constructions Since August 9, 2022 | |||
Main activity: 43.120 - Site preparation works Since August 9, 2022 | |||
Main activity: 43.12001 - Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc. Since August 9, 2022 | |||
Main activity: 43.12003 - Lowering of the water table and drainage of construction sites Since August 9, 2022 | |||
Main activity: 43.12004 - Drainage of agricultural or forestry land Since August 9, 2022 | |||
Main activity: 43.291 - Insulation works Since August 9, 2022 | |||
Main activity: 43.29101 - Implementation in buildings or other construction projects of: thermal insulation, acoustic and anti vibration insulation Since August 9, 2022 | |||
Main activity: 43.310 - Plastering works Since August 9, 2022 | |||
Main activity: 43.31001 - Application in buildings or other construction projects of plaster or stucco for interiors or exteriors, including related lathing materials Since August 9, 2022 | |||
Main activity: 43.32001 - Assembly of exterior and interior joinery: doors, windows, staircases, fitted kitchen cupboards shop fittings, door and window frames, etc. Since August 9, 2022 | |||
Main activity: 43.32005 - Assembly of wooden or plastic greenhouses, verandas etc. Since August 9, 2022 | |||
Main activity: 43.32011 - Assembly of external and internal metal joinery: doors, windows, door and window frames, staircases, fitted kitchen cupboards, shop fittings, etc. Since August 9, 2022 | |||
Main activity: 43.32015 - Assembly of metal greenhouses, verandas, etc. Since August 9, 2022 | |||
Main activity: 43.32021 - Installation of glass interior doors, partition walls, etc. Since August 9, 2022 | |||
Main activity: 43.331 - Tiling of floors and walls Since August 9, 2022 | |||
Main activity: 43.33101 - Fitting in buildings or other construction projects of: wall coverings or ceramic, concrete or stone tiles; granite flooring and wall coverings, etc. Since August 9, 2022 | |||
Main activity: 43.910 - Roofing works Since August 9, 2022 | |||
Main activity: 43.91001 - Framework assembly Since August 9, 2022 | |||
Main activity: 43.91002 - Covering work using all materials Since August 9, 2022 | |||
Main activity: 43.91003 - Installation of draining elements for rainwater Since August 9, 2022 | |||
Main activity: 43.991 - Waterproofing of walls Since August 9, 2022 | |||
Main activity: 43.99101 - Waterproofing of roofs and roof terraces Since August 9, 2022 | |||
Main activity: 43.99111 - Treatment of walls with water repellent products Since August 9, 2022 | |||
Main activity: 43.992 - Restoration of façades Since August 9, 2022 | |||
Main activity: 43.99201 - Steam cleaning, sand blasting and similar activities for building exteriors Since August 9, 2022 | |||
Main activity: 43.99902 - Formwork and rebar work Since August 9, 2022 | |||
Main activity: 43.99921 - Execution of underwater work of all kinds Since August 9, 2022 | |||
| |||
Version of the Nacebel codes for the NSSO-activities 2008(2) | |||
Main activity: 41.201 - General construction of residential buildings Since June 10, 2024 | |||
| |||
Version of the Nacebel codes for the NSSO-activities 2025(2) | |||
Main activity: 41.001
- General construction of residential buildings Since January 1, 2025 |
|
(1) The modification made to the address is of a technical nature. It is related to the modification of a code used in the address data.
(2)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). There are different versions of these codes. Activities with a NACE-BEL code (version 2003) were stopped on 31/12/2007 and automatically converted to the new NACE-BEL codes (2008 version) starting on 01/01/2008. A new 2025 version of the codes will enter into force on 01/01/2025. During the first half of the year 2025, all activities with a 2008 version of the NACE-BEL code will be phased out with 31/12/2024 as end date and automatically converted to the 2025 version of the NACE-BEL codes, starting on 01/01/2025. Up until then, activities will continue to be registered using the 2008 NACE-BEL codes.