Attention! This establishment unit has been stopped. Therefore, the shown data reflect the situation at the moment of cessation of the establishment unit.
Establishment unit data
In general | |||
Enterprise number: | 0861.741.169 | ||
Status of the entity: | Stopped | ||
Number of the establishment unit: | 2.136.094.210 | ||
Status of the establishment unit: | Stopped Since April 1, 2017 | ||
Start date: | November 20, 2003 | ||
Name of the establishment unit: |
Dagos Constructions Farciennoises Name in French, since November 20, 2003 | ||
Address of the establishment unit: |
Rue du Wainage(FAR) 2
box 4
6240 Farciennes Since November 20, 2003 | ||
Phone number: | No information found in the CBE. | ||
Fax: | No information found in the CBE. | ||
Email address: | No information found in the CBE. | ||
Web address: | No information found in the CBE. | ||
| |||
Authorisations | |||
No data included in CBE. | |||
| |||
Version of Nacebel codes for activities 2008(1) | |||
Main activity: 41.10101
- Real estate development of new residential houses or renovations Since January 1, 2008 | |||
Main activity: 41.10102
- Property development of residential buildings Since January 1, 2008 | |||
Main activity: 42.11003
- Paint marking of pavements and lay-bys or car parks Since January 1, 2008 | |||
Main activity: 42.21911
- Construction of water supply, distribution and drainage networks Since January 1, 2008 | |||
Main activity: 42.91101
- Realisation of dredging works Since January 1, 2008 | |||
Main activity: 42.91102
- Cleaning of rivers, ditches, etc. Since January 1, 2008 | |||
Main activity: 43.12001
- Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc. Since January 1, 2008 | |||
Main activity: 43.12002
- Site preparation for mining: overburden removal and other development and preparation of land and mining sites Since January 1, 2008 | |||
Main activity: 43.12003
- Lowering of the water table and drainage of construction sites Since January 1, 2008 | |||
Main activity: 43.12004
- Drainage of agricultural or forestry land Since January 1, 2008 | |||
Main activity: 43.12011
- Clearing of building sites Since January 1, 2008 | |||
Main activity: 43.13001
- Test surveys, test drilling and core sampling for construction as well as for geophysical or geological studies, or similar Since January 1, 2008 | |||
Main activity: 43.13002
- Execution of horizontal drilling for cable glands or ducts Since January 1, 2008 | |||
Main activity: 43.21103
- Installation of surveillance and alarm systems against intruders Since January 1, 2008 | |||
Main activity: 43.29101
- Implementation in buildings or other construction projects of: thermal insulation, acoustic and anti vibration insulation Since January 1, 2008 | |||
Main activity: 43.29102
- Insulation work for heating or cooling pipes Since January 1, 2008 | |||
Main activity: 43.29103
- Insulation work for cold storage or refrigerated warehouses Since January 1, 2008 | |||
Main activity: 43.29903
- Other installation works n.e.s., including installation of accessories Since January 1, 2008 | |||
Main activity: 43.29904
- General installation work Since January 1, 2008 | |||
Main activity: 43.29912
- Installation of building aerials and lightning rods Since January 1, 2008 | |||
Main activity: 43.32012
- Assembly of metal mobile walls; lining walls, ceilings, etc. Since January 1, 2008 | |||
Main activity: 43.32013
- Assembly of metal garage doors, shutters, blinds, fences, gates, etc. Since January 1, 2008 | |||
Main activity: 43.32014
- Assembly of metal armoured doors and fire doors Since January 1, 2008 | |||
Main activity: 43.32031
- Assembly of gypsum drywalls Since January 1, 2008 | |||
Main activity: 43.34201
- Painting of metal frames Since January 1, 2008 | |||
Main activity: 43.39001
- Cleaning of new buildings and rehabilitation of sites after work Since January 1, 2008 | |||
Main activity: 43.39002
- Other building completion and finishing work n.e.s. Since January 1, 2008 | |||
Main activity: 43.99201
- Steam cleaning, sand blasting and similar activities for building exteriors Since January 1, 2008 | |||
Main activity: 43.99402
- Execution of repointing Since January 1, 2008 | |||
Main activity: 43.99601
- Screed laying Since January 1, 2008 | |||
Main activity: 43.999
- Other specialised construction activities Since January 1, 2008 | |||
Main activity: 43.99901
- Establishment of foundations, including pile driving Since January 1, 2008 | |||
Main activity: 43.99902
- Formwork and rebar work Since January 1, 2008 | |||
Main activity: 43.99903
- Construction of chimneys and industrial ovens Since January 1, 2008 | |||
Main activity: 43.99904
- Installation of steel structure elements not manufactured by the unit carrying out the work Since January 1, 2008 | |||
Main activity: 43.99905
- Execution of lifting work for third parties Since January 1, 2008 | |||
Main activity: 43.99906
- Assembly and disassembly of scaffolding and work platforms Since January 1, 2008 |
|
(1)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). There are different versions of these codes. Activities with a NACE-BEL code (version 2003) were stopped on 31/12/2007 and automatically converted to the new NACE-BEL codes (2008 version) starting on 01/01/2008. A new 2025 version of the codes will enter into force on 01/01/2025. During the first half of the year 2025, all activities with a 2008 version of the NACE-BEL code will be phased out with 31/12/2024 as end date and automatically converted to the 2025 version of the NACE-BEL codes, starting on 01/01/2025. Up until then, activities will continue to be registered using the 2008 NACE-BEL codes.