Establishment unit data
In general | |||
Enterprise number: | 0876.616.813 | ||
Status of the entity: | Active | ||
Number of the establishment unit: | 2.151.378.341 | ||
Status of the establishment unit: | Active | ||
Start date: | January 30, 2006 | ||
Name of the establishment unit: |
ATELEC Name in French, since February 13, 2015 | ||
Address of the establishment unit: |
Rue de la Barrière 25
4100 Seraing Since February 13, 2015 Ex officio striked off address since September 23, 2021(1) | ||
Phone number: | No information found in the CBE. | ||
Fax: | No information found in the CBE. | ||
Email address: | No information found in the CBE. | ||
Web address: | No information found in the CBE. | ||
| |||
Authorisations | |||
No data included in CBE. | |||
Licences registered with the Federal Agency for the Safety of the Food Chain (FASFC) Click here | |||
| |||
Version of Nacebel codes for activities 2025(2) | |||
Main activity: 43.211
- General work of electrical installation Since January 1, 2025 | |||
Main activity: 77.32001
- Rental and leasing of machinery and equipment for construction and civil engineering, without operator (cranes, bulldozers, cement mixers, etc) Since January 1, 2025 | |||
Main activity: 77.320
- Rental and leasing of construction and civil engineering machinery and equipment Since January 1, 2025 | |||
Main activity: 43.21101
- Installation of electrical wiring and fittings Since January 1, 2025 | |||
Main activity: 81.30002
- Creation and maintenance of gardens, parks and green spaces for sports facilities Since January 1, 2025 | |||
Main activity: 71.11302
- Design of gardens, parks, etc Since January 1, 2025 | |||
Main activity: 43.21201
- Installation of illumination and signalling systems for roads, railways, airports and port facilities (including the installation of traffic signs) Since January 1, 2025 | |||
Main activity: 43.212
- General work of electrical installation in industrial plants Since January 1, 2025 | |||
Main activity: 43.22203
- Installation of electrical heating systems Since January 1, 2025 | |||
Main activity: 43.12002
- Site preparation for mining: overburden removal and other development and preparation of land and mining sites Since January 1, 2025 | |||
Main activity: 43.24002
- Installation of signs, illuminated or not Since January 1, 2025 | |||
Main activity: 43.21102
- Installation of telecommunication systems and computer facilities Since January 1, 2025 | |||
Main activity: 43.12001
- Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc Since January 1, 2025 | |||
Main activity: 43.21103
- Installation of surveillance and alarm systems against intruders Since January 1, 2025 | |||
Show the NACE-BEL codes activities version 2008. | |||
Show the NACE-BEL codes activities version 2003. |
|
(1)When an address is ex officio striked off, this indicates that the entity, the establishment unit or the branch is not longer situated at the registered address.
(2)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). Activities registered of the NACE-BEL codes (version 2003) were stopped on 31/12/2007, automatically converted to the NACE-BEL codes (version 2008) and registered with a start date of 01/01/2008. This was a mere administrative conversion and no modification of the activity itself.
(3)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). Following a conversion of activities with a NACE-BEL code (2003 version) to NACE-BEL codes (2008 version), the start date of activities (2008 version) is 1/01/2008. Activities with a NACE-BEL code (2008 version) were then stopped on 31/12/2024 and automatically converted to NACE-BEL codes (2025 version). These were mere administrative conversion and no modification of the activity itself. The 2003 activities can be accessed by clicking on the link : "Show the NACE-BEL codes activities version 2003".
(4)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). Following a conversion of activities with a NACE-BEL code (2008 version) to NACE-BEL codes (2025 version), the start date of activities (2025 version) is 1/01/2025. This was a mere administrative conversion and no modification of the activity itself. The 2008 activities can be accessed by clicking on the link : "Show the NACE-BEL codes activities version 2008".