shadow
The English version of the Public Search application constitutes an unofficial English translation and is provided for information purposes only.
No legal rights can therefore be derived from this translation. For the official application, please consult the Dutch, French or German versions of the Public Search application.


Establishment unit data

In general

Enterprise number:0413.630.071
Status of the entity:Active
Number of the establishment unit:2.037.667.914
Status of the establishment unit:Active
Start date:December 1, 1973
Name of the establishment unit:No information found in the CBE.
Address of the establishment unit:
Avenue des Communautés   100
1200   Woluwe-Saint-Lambert
Since December 1, 1973
Phone number:No information found in the CBE.
Fax:No information found in the CBE.
Email address:No information found in the CBE.
Web address:No information found in the CBE.
 
 

Authorisations

No data included in CBE.
Licences registered with the Federal Agency for the Safety of the Food Chain (FASFC)  Click here
 
 

Version of Nacebel codes for activities 2025(1)

Main activity: 43.12005  - Clearing of building sites
Since January 1, 2025
Main activity: 42.13001  - Construction of bridges, including those for elevated roads, viaducts, etc
Since January 1, 2025
Main activity: 25.11003  - Manufacture of prefabricated buildings mainly of metal: site huts, modular exhibition elements, telephone booths, etc
Since January 1, 2025
Main activity: 25.21013  - Design, construction and installation of piping systems, comprising further processing of tubes generally to make pipes or pressurized networks
Since January 1, 2025
Main activity: 25.11001  - Manufacture of metal frameworks or skeletons for construction
Since January 1, 2025
Main activity: 43.32006  - Assembly of external and internal metal joinery: doors, windows, door and window frames, staircases, fitted kitchen cupboards, shop fittings, etc
Since January 1, 2025
Main activity: 42.11002  - Construction of airstrips
Since January 1, 2025
Main activity: 42.91905  - Construction of settling ponds and other structures for waste water treatment
Since January 1, 2025
Main activity: 28.22004  - Manufacture of mechanical manipulators and industrial robots specifically designed for lifting, handling, loading or unloading
Since January 1, 2025
Main activity: 41.00302  - Assembly of hangars, barns, silos, etc, for agricultural use
Since January 1, 2025
Main activity: 42.22001  - Construction of electrical energy transmission and distribution lines
Since January 1, 2025
Main activity: 41.00102  - Construction of individual "turnkey" houses
Since January 1, 2025
Main activity: 43.13001  - Test surveys, test drilling and core sampling for construction as well as for geophysical or geological studies, or similar
Since January 1, 2025
Main activity: 38.21023  - Crushing, cleaning and sorting of other waste to obtain secondary raw materials
Since January 1, 2025
Main activity: 43.13002  - Execution of horizontal drilling for cable glands or ducts
Since January 1, 2025
Main activity: 43.24005  - Installation of lifts and escalators
Since January 1, 2025
Main activity: 81.300  - Landscape service activities
Since January 1, 2025
Main activity: 42.13002  - Construction of road and rail tunnels and other underground passages
Since January 1, 2025
Main activity: 41.00301  - Realisation of structural work on buildings and industrial or commercial structures, vehicle depots, warehouses, schools, clinics, buildings for the practice of worship, etc
Since January 1, 2025
Main activity: 42.11003  - Paint marking of pavements and lay-bys or car parks
Since January 1, 2025
Main activity: 43.24006  - Installation of building aerials and lightning rods
Since January 1, 2025
Main activity: 43.320  - Joinery installation
Since January 1, 2025
Main activity: 38.320  - Landfilling or permanent storage
Since January 1, 2025
Main activity: 43.35002  - Other building completion and finishing work nes
Since January 1, 2025
Main activity: 43.21102  - Installation of telecommunication systems and computer facilities
Since January 1, 2025
Main activity: 38.210  - Materials recovery
Since January 1, 2025
Main activity: 42.911  - Dredging
Since January 1, 2025
Main activity: 43.230  - Installation of insulation
Since January 1, 2025
Main activity: 28.11002  - Manufacture of turbines and parts thereof: turbines generating steam or other vapour, gas turbines, hydraulic turbines, water wheels and regulators thereof
Since January 1, 2025
Main activity: 43.21101  - Installation of electrical wiring and fittings
Since January 1, 2025
Main activity: 41.00101  - Realisation of the main structure of individual houses
Since January 1, 2025
Main activity: 43.120  - Site preparation
Since January 1, 2025
Main activity: 42.919  - Construction of water projects, except of dredging
Since January 1, 2025
Main activity: 41.00103  - Realisation of the main structure of multi-cellular buildings (apartments, etc)
Since January 1, 2025
Main activity: 42.11001  - Construction of motorways, roads, streets, pavements and other vehicular and pedestrian roads (including the installation of crash barriers)
Since January 1, 2025
Main activity: 43.22203  - Installation of electrical heating systems
Since January 1, 2025
Main activity: 33.20001  - Installation of back-up power systems (generators)
Since January 1, 2025
Main activity: 42.21902  - Construction of water supply, distribution and drainage networks
Since January 1, 2025
Main activity: 43.32008  - Assembly of metal garage doors, shutters, blinds, fences, gates, etc
Since January 1, 2025
Main activity: 43.42901  - Establishment of foundations, including pile driving
Since January 1, 2025
Main activity: 43.22201  - Installation in buildings or other construction projects of: heating systems, electricity, gas and oil-fired boilers, ventilation and air conditioning material and ducting, etc
Since January 1, 2025
Main activity: 42.21903  - Construction of networks to transport gas, petroleum products, etc
Since January 1, 2025
Main activity: 25.11002  - Manufacture of steel structures for industrial equipment (frames of blast furnaces, handling equipment, etc)
Since January 1, 2025
Main activity: 38.330  - Other waste disposal
Since January 1, 2025
Main activity: 43.32009  - Assembly of metal armoured doors and fire doors
Since January 1, 2025
Main activity: 41.00104  - Realisation of "turnkey" apartments
Since January 1, 2025
Main activity: 42.12001  - Construction of railways: laying ballast and rails, restoration and repair of tracks
Since January 1, 2025
Main activity: 42.99001  - Construction of playgrounds and sports fields, swimming pools, etc
Since January 1, 2025
Main activity: 43.410  - Roofing activities
Since January 1, 2025
Main activity: 43.32007  - Assembly of metal mobile walls; lining walls, ceilings, etc
Since January 1, 2025
Main activity: 42.22002  - Construction of telecommunication lines and networks
Since January 1, 2025
Main activity: 43.22101  - Installation in buildings or other structures of: plumbing and sanitary facilities, pipes, gas and water connections (except for heating), installation of automatic fire extinguishing systems, etc
Since January 1, 2025
Main activity: 43.331  - Floor and wall covering with tiles
Since January 1, 2025
Main activity: 43.990  - Other specialised construction activities nec
Since January 1, 2025
Main activity: 43.11001  - Demolition of buildings and other constructions
Since January 1, 2025
Main activity: 43.42903  - Installation of steel structure elements not manufactured by the unit carrying out the work
Since January 1, 2025
Main activity: 43.21103  - Installation of surveillance and alarm systems against intruders
Since January 1, 2025
 
 

Version of the Nacebel codes for the NSSO-activities 2025(1)

Main activity: 41.001  - General construction of residential buildings
Since January 1, 2025
 
Show the NACE-BEL codes activities version 2008.
 
Show the NACE-BEL codes activities version 2003.
 
 

(1)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). Activities registered of the NACE-BEL codes (version 2003) were stopped on 31/12/2007, automatically converted to the NACE-BEL codes (version 2008) and registered with a start date of 01/01/2008. This was a mere administrative conversion and no modification of the activity itself.

(2)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). Following a conversion of activities with a NACE-BEL code (2003 version) to NACE-BEL codes (2008 version), the start date of activities (2008 version) is 1/01/2008. Activities with a NACE-BEL code (2008 version) were then stopped on 31/12/2024 and automatically converted to NACE-BEL codes (2025 version). These were mere administrative conversion and no modification of the activity itself. The 2003 activities can be accessed by clicking on the link : "Show the NACE-BEL codes activities version 2003".

(3)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). Following a conversion of activities with a NACE-BEL code (2008 version) to NACE-BEL codes (2025 version), the start date of activities (2025 version) is 1/01/2025. This was a mere administrative conversion and no modification of the activity itself. The 2008 activities can be accessed by clicking on the link : "Show the NACE-BEL codes activities version 2008".