Establishment unit data
In general | |||||
Enterprise number: | 0461.155.618 | ||||
Status of the entity: | Active | ||||
Number of the establishment unit: | 2.305.848.366 | ||||
Status of the establishment unit: | Active | ||||
Start date: | January 1, 2020 | ||||
Name of the establishment unit: |
BARVAUX WATER TECHNICS Name in French, since January 1, 2020 | ||||
Address of the establishment unit: |
Allée de la Marbrite 11
7090 Braine-le-Comte Since January 1, 2020 | ||||
Phone number: |
| ||||
Fax: |
| ||||
Email address: | No information found in the CBE. | ||||
Web address: | No information found in the CBE. | ||||
| |||||
Authorisations | |||||
No data included in CBE. | |||||
| |||||
Version of Nacebel codes for activities 2008(1) | |||||
Main activity: 27.120
- Manufacture of electricity distribution and control apparatus Since January 1, 2020 | |||||
Main activity: 27.12002
- Manufacture of boards, panels, consoles, desks, cabinets and other media for control or power distribution Since January 1, 2020 | |||||
Main activity: 27.330
- Manufacture of wiring devices Since January 1, 2020 | |||||
Main activity: 27.33001
- Manufacture of equipment for switching or protection, connection, connection or electrical circuits: switches, circuit breakers, etc. Since January 1, 2020 | |||||
Main activity: 27.401
- Manufacture of lamps Since January 1, 2020 | |||||
Main activity: 28.120
- Manufacture of fluid power equipment Since January 1, 2020 | |||||
Main activity: 28.12001
- Manufacture of hydraulic, pneumatic and wind engines Since January 1, 2020 | |||||
Main activity: 28.12011
- Manufacture of hydraulic or components of steering gear Since January 1, 2020 | |||||
Main activity: 36.000
- Water collection, treatment and supply Since January 1, 2020 | |||||
Main activity: 36.00001
- Water collection, treatment and supply Since January 1, 2020 | |||||
Main activity: 42.219
- Construction of networks for fluids n.e.c. Since January 1, 2020 | |||||
Main activity: 42.21901
- Drilling and water well construction, shaft sinking Since January 1, 2020 | |||||
Main activity: 42.21911
- Construction of water supply, distribution and drainage networks Since January 1, 2020 | |||||
Main activity: 42.220
- Construction of electricity and telecommunications networks Since January 1, 2020 | |||||
Main activity: 42.22001
- Construction of electrical energy transmission and distribution lines Since January 1, 2020 | |||||
Main activity: 42.22002
- Construction of telecommunication lines and networks Since January 1, 2020 | |||||
Main activity: 42.990
- Construction of other civil engineering projects n.e.c. Since January 1, 2020 | |||||
Main activity: 42.99001
- Construction of playgrounds and sports fields, swimming pools, etc. Since January 1, 2020 | |||||
Main activity: 43.120
- Site preparation works Since January 1, 2020 | |||||
Main activity: 43.12001
- Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc. Since January 1, 2020 | |||||
Main activity: 43.12003
- Lowering of the water table and drainage of construction sites Since January 1, 2020 | |||||
Main activity: 43.130
- Test drilling and surveys Since January 1, 2020 | |||||
Main activity: 43.13001
- Test surveys, test drilling and core sampling for construction as well as for geophysical or geological studies, or similar Since January 1, 2020 | |||||
Main activity: 43.13002
- Execution of horizontal drilling for cable glands or ducts Since January 1, 2020 | |||||
Main activity: 43.211
- Electrotechnical installation work for buildings Since January 1, 2020 | |||||
Main activity: 43.21101
- Installation of electrical wiring and fittings Since January 1, 2020 | |||||
Main activity: 43.221
- Plumbing works Since January 1, 2020 | |||||
Main activity: 43.22101
- Installation in buildings or other structures of: plumbing and sanitary facilities, pipes, gas and water connections (except for heating), installation of automatic fire extinguishing systems, etc. Since January 1, 2020 | |||||
Main activity: 43.999
- Other specialised construction activities Since January 1, 2020 | |||||
Main activity: 43.99901
- Establishment of foundations, including pile driving Since January 1, 2020 | |||||
Main activity: 43.99902
- Formwork and rebar work Since January 1, 2020 | |||||
Main activity: 71.113
- Architectural, urban planning and landscape architectural activities Since January 1, 2020 | |||||
Main activity: 71.11301
- Studies and advice on urban planning and landscape architecture Since January 1, 2020 | |||||
Main activity: 71.11302
- Design of gardens, parks, etc. Since January 1, 2020 | |||||
Main activity: 81.300
- Landscape service activities Since January 1, 2020 | |||||
Main activity: 81.30002
- Creation and maintenance of gardens, parks and green spaces for sports facilities Since January 1, 2020 | |||||
| |||||
Version of the Nacebel codes for the NSSO-activities 2008(1) | |||||
Main activity: 43.221
- Plumbing works Since January 1, 2020 | |||||
| |||||
Version of the Nacebel codes for the NSSO-activities 2025(1) | |||||
Main activity: 43.221
- Sanitary work Since January 1, 2025 |
|
(1)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). There are different versions of these codes. Activities with a NACE-BEL code (version 2003) were stopped on 31/12/2007 and automatically converted to the new NACE-BEL codes (2008 version) starting on 01/01/2008. A new 2025 version of the codes will enter into force on 01/01/2025. During the first half of the year 2025, all activities with a 2008 version of the NACE-BEL code will be phased out with 31/12/2024 as end date and automatically converted to the 2025 version of the NACE-BEL codes, starting on 01/01/2025. Up until then, activities will continue to be registered using the 2008 NACE-BEL codes.